Cut loss and wait for rebound, sharks will accumulate soon. whether to target syed mokhtar or not its another story, but press down gamuda for accumulation / acquiring seems positive
-Mind you all package cut was the UG package not everything. (not all is lost) -Let the foreigners come in and build for us (very obvious who can do it at the price MOF wants) -Swap all 20k malaysian to 20k foreigners ( permits = more profit) -To bring down cost further, cut all malaysian supplier, import everything from a cheaper source.(tax ?) -Hopefully there will be more input of foreign currency*face palm* -Let all the small fry malaysian contractors die since MOF already not paying before election, why not drag longer for more people to bankrupt, more opportunity to buy a lot of stuff at discounted price -Dont point the finger at LGE la, kesian him. we all know what he can or cannot do. -Gamuda has already discounted for all the other parts, UG really hard to cut due to the cost involved. can google up for tunnel boring machine fyi, two units are being deployed at this UG project.
Stock: [GAMUDA]: GAMUDA BHD
2018-10-09 16:58 | Report Abuse
Cut loss and wait for rebound, sharks will accumulate soon.
whether to target syed mokhtar or not its another story, but press down gamuda for accumulation / acquiring seems positive
-Mind you all package cut was the UG package not everything. (not all is lost)
-Let the foreigners come in and build for us (very obvious who can do it at the price MOF wants)
-Swap all 20k malaysian to 20k foreigners ( permits = more profit)
-To bring down cost further, cut all malaysian supplier, import everything from a cheaper source.(tax ?)
-Hopefully there will be more input of foreign currency*face palm*
-Let all the small fry malaysian contractors die since MOF already not paying before election, why not drag longer for more people to bankrupt, more opportunity to buy a lot of stuff at discounted price
-Dont point the finger at LGE la, kesian him. we all know what he can or cannot do.
-Gamuda has already discounted for all the other parts, UG really hard to cut due to the cost involved. can google up for tunnel boring machine fyi, two units are being deployed at this UG project.