KLSE (MYR): DNEX (4456)
You're accessing 15 mins delay data. Turn on live stream now to enjoy real-time data!
Last Price
0.395
Today's Change
0.00 (0.00%)
Day's Change
0.395 - 0.405
Trading Volume
4,167,400
Signal of goreng 😁
Sargon15
https://twitter.com/tzafrul_aziz/status/1782403286668280241
12 hours ago
6 days ago
To be sure, wait for the next push with trading volume. This can be the strategy to use to accumulate. Every push we can buy some. Every drop beyond the last bought, we sell some. Share market is all about probability.
5 days ago
its a healthy situation at this level for accumulation. Exactly 2 weeks after the recent jump, price never drop below 39. and today still got ppl buying at a very impressive rate, 80% !!.
5 days ago
Lim said he welcomed Chow’s announcement over the interest by three China-based semiconductor companies who were keen to invest in Penang with total investments of US$100 million which would help bolster the state’s back-end manufacturing ecosystem.
The three companies were China Wafer Level CSP Co, Ningbo SJ Electronics Co and Wuxi AMTE Inc.
But Lim still said Penang should learn from Selangor’s success to set up a semiconductor accelerator and IC design park as such a move would reinforce the northern state’s position as Malaysia’s Silicon Valley.
______________________________
DNEX's Silterra 28mm Wafer will be under threat from China Wafer investment in Penang
3 days ago
More foreign investment is needed to bolter the semiconductor overall ecosystem not only in manufacturing but in IC designs and applications.
3 days ago
To become the silicon valley of SEA in Semiconductor, it is too early to say about competition.
3 days ago
450 Million shares traded at 0.40 or over the last 3 weeks..Wonder how many more before the the bottom is done and we can move upwards.
2 days ago
guess another 3-400 Million shares more to sell before moving up based on the current selling
2 days ago
Dnex will find its way down to 0.38 as selling down is still on. No positive sentiment so far...
2 days ago
When can expect to receive 1 bil project from the tender? Dnex is one of the 3 shortlisted right?
2 days ago
Dnex 40 cents
Tp 50 cents range reasonable
Let see by 3-4 month times.no straight line up.
30/4/24 9.04am
2 days ago
Dnex 50 sens only ! Dont make the world laugh bro , it atleast worth rm 4 - 6 after the arbritration settled bro ! I bet wth you !
1 day ago
I'm pretty sure that Dnex is going to lose the 1 billion project, its share is moving south soon.
1 day ago
Actually most of us didnt even know they were shortlisted for the niise project until edge reported. So dont worry about the 1b lol
1 day ago
Someone is carefully managing the movement below 200MA now. Next consolidation phase 40-50c...drag 200MA lower and then it will cross it. 10cents for DNEX is a huge range to consolidate but I think it's possible, it will move that much up/down
1 day ago
https://www.orientaldaily.com.my/news/business/2024/04/30/648462
U will regret not buy dnex !
1 day ago
The controller is waiting for arbritation case to be settled before further push !
1 day ago
Samsung is totally different type of monster. DNeX is just a kitty but it does help if the industry is recovering.
1 day ago
How much is DNEX worth once confirm Foxconn Ajlan DNEX JV new wafer fab plant?
Given PMX's direction and ambitions, and DNEX's very Malaysian presence, any reason at all for Govt not to support this project?
1 day ago
In May 2022, DNeX and Foxconn inked a memorandum of understanding to set up a joint venture (JV) company to build and operate a new 12in wafer fabrication plant in Malaysia that is capable of producing up to 40,000 wafers per month in the 28nm and 40nm technology segment.
A month or two ago, DNeX resubmitted its proposal to build a US$1.5 billion wafer fabrication plant in Negeri Sembilan with Foxconn and Ajlan of Saudi Arabia. Syed Zainal says that the plan is to manufacture components for the EV industry.
Both Foxconn and Ajlan have EV aspirations.
“The project [building of a wafer fabrication plant] is very much being pursued. We have resubmitted our new proposal to the government. It will be focused on electric vehicles. Foxconn wants to position itself as a global electric vehicle component supplier, so, they (Foxconn) have already made a number of agreements with many companies, so to do that they need to secure the supply of microchip wafers. That’s where we come in. Saudi (Arabia) have also said they want to produce their own electric vehicles, so having access to semiconductor supply becomes very important.
“So we are investing with them (Foxconn and Ajlan) in Malaysia in a wafer foundry, on a specific technology meant for electric vehicles … this is what we have resubmitted to the government, in the last one or two months,” Syed Zainal says.
How this pans out remains to be seen.
1 day ago
Wages and salaries increased by 1.1% over that same three-month period, while benefit costs also increased by 1.1%. The data adds to ongoing concerns that persistently high wages.
1 day ago
MOU bring no obligation to any parties at all lol, like langkawi signing MOU to have so called LRT around which sounds WOW but everyone know it is rubbish as there is no ROI meaning at all........
18 hours ago
Look at YTL Power, why it is flying? because it is not MOU but real contract signed which means real investment, real action in place......not just talking only like MOU.......
18 hours ago
Tambun , Check out this blog. Worth reading.
https://klse.i3investor.com/web/blog/detail/LeRainmaker888/2024-05-01-story-h-182699303
Data center building on Penang Mainland and Beneficiary would be Tambun , given their landbanks at east side is massive.
12 hours ago
Positive outlook for Dnex - https://www.thestar.com.my/business/business-news/2024/05/02/positive-outlook-for-dnex
1 hour ago
NatsukoMishima
Just buy 100000 units keep if skyrocket u can retire , if not u also wont lose big ! My TP RM 4 - 6 !
1 week ago