Followers
0
Following
0
Blog Posts
1
Threads
5,194
Blogs
Threads
Portfolio
Follower
Following
2014-08-05 21:50 | Report Abuse
Hi guy, how is today? Just back from office
2014-08-05 16:01 | Report Abuse
Posted by beinghuman > Aug 5, 2014 04:01 PM | Report Abuse
hopefully can touch 0.32 soon
give hope to next week
2014-08-05 15:59 | Report Abuse
sideway lo today, in a range of 24c-26.5c
2014-08-05 15:55 | Report Abuse
a lot of volume being eaten up at level 38 cent. this is a good sign as this company is outperforming as its future revenue gonna shoot up
2014-08-05 15:53 | Report Abuse
on 1 aug, hammer (strong buy signal)
on 4 aug , Spinning top (continuation of bull trend)
today continue up trend
2014-08-05 15:51 | Report Abuse
Hi Zelan having some sell force due to profit taking. i think profit taking will end soon
2014-08-05 12:08 | Report Abuse
"Posted by DRYEW > Aug 5, 2014 12:05 PM | Report Abuse
not 4PM, it's now =<"
careful trading ya.... i wait for 4pm then....
2014-08-05 12:04 | Report Abuse
try get some at 4pm , dont rush in now...
2014-08-05 11:58 | Report Abuse
today forced selling again for those bought on last Wed and thurs
2014-08-05 11:14 | Report Abuse
39c, 39.5, 40c, need some power to eat up buy institution investor
2014-08-05 10:59 | Report Abuse
closing i estimate can reach 40.5c to 41.5 c
2014-08-05 10:45 | Report Abuse
ZELAN !!!!!!!!!
1 ) Zelan Bhd unit Zelan Construction Sdn Bhd (ZCSB) has received a contract from the East Coast Economic Region Development Council for the construction of the RM248.7mil drawbridge connecting Muara North and Muara South in the Kuala Terengganu city centre. The overall length of the bridge is 632 metres, with a width of 23 metres. The clear span of the drawbridge is 50 metres long. A statement to Bursa Malaysia said that the contract duration was for 135 weeks, commencing on the date for possession on Aug 13. (StarBiz)
2 ) Zelan Berhad ("Company") would like to announce that its fully owned subsidiary, Zelan Construction Sdn Bhd ("ZCSB"), has received a Letter of Award from PETRONAS Refinery and Petrochemical Corporation Sdn Bhd ("PRPCSB") for Contract No.: RAPID/CTC/21-2013-P20B1 for the Provision of Basic Design, Detail Engineering, Procurement, Construction & Commissioning ("BEPCC") of Material Off Loading Facilities ("MOLF") Jetty at Tanjung Setapa for Refinery and Petrochemical Integrated Development ("RAPID") Project at Pengerang, Johor ("Works").
3 ) Reference is made to the Announcement dated 17 June 2014 in relation to the extension of 30 days requested by Meena Holdings LLC ("MH"), the owner of Meena Plaza Mixed Use Development Project in Abu Dhabi, United Arab Emirates, for MH to comply with its obligation in the SSA to provide Zelan Holdings (M) Sdn Bhd ("ZHSB") with a document from MH's financier demonstrating MH's readiness of financing as supported by a signed copy of the loan agreement between MH and its financier evidencing that the financing is available for drawdown.
Zelan Berhad would like to announce that ZHSB has on 16 July 2014 received a letter from MH, requesting a further extension of 60 days for MH to comply with its abovementioned obligation. Upon due consideration of MH's request, ZHSB has on 17 July 2014 responded to MH, giving an extension of 30 days.
Accordingly, the relevant timings in the SSA, including the Payment Date and Recommencement Date (both of which are defined in the Announcement dated 15 April 2014), will be adjusted for the same duration.
2014-08-05 10:43 | Report Abuse
just bought 50 big lots at 38.5 cent.
As new support level is 38 cent
2014-08-05 10:42 | Report Abuse
" Posted by hagi > Aug 5, 2014 10:35 AM | Report Abuse
No matter whether its T+3 or T+4, ifcamsc will always win on the fact that it has super strong fundamentals. As long as GST is in track, the price will go at new heights from day to day if not week to week =)"
i believe this happen next week
2014-08-05 10:39 | Report Abuse
Sateman, possible today 4pm can go to 24 cent. as 24 cent is the support level
2014-08-05 10:36 | Report Abuse
38 c the highest volume currently , can be a good support at 38 c
2014-08-05 10:31 | Report Abuse
a lot of seller at 38.5 cent and 39 cent....
need to eat up these 2 bids baru can holyland
2014-08-05 10:28 | Report Abuse
Reference is made to the Announcement dated 17 June 2014 in relation to the extension of 30 days requested by Meena Holdings LLC ("MH"), the owner of Meena Plaza Mixed Use Development Project in Abu Dhabi, United Arab Emirates, for MH to comply with its obligation in the SSA to provide Zelan Holdings (M) Sdn Bhd ("ZHSB") with a document from MH's financier demonstrating MH's readiness of financing as supported by a signed copy of the loan agreement between MH and its financier evidencing that the financing is available for drawdown.
Zelan Berhad would like to announce that ZHSB has on 16 July 2014 received a letter from MH, requesting a further extension of 60 days for MH to comply with its abovementioned obligation. Upon due consideration of MH's request, ZHSB has on 17 July 2014 responded to MH, giving an extension of 30 days.
Accordingly, the relevant timings in the SSA, including the Payment Date and Recommencement Date (both of which are defined in the Announcement dated 15 April 2014), will be adjusted for the same duration.
This Announcement is dated 17 July 2014.
2014-08-05 10:25 | Report Abuse
Zelan Berhad ("Company") would like to announce that its fully owned subsidiary, Zelan Construction Sdn Bhd ("ZCSB"), has received a Letter of Award from PETRONAS Refinery and Petrochemical Corporation Sdn Bhd ("PRPCSB") for Contract No.: RAPID/CTC/21-2013-P20B1 for the Provision of Basic Design, Detail Engineering, Procurement, Construction & Commissioning ("BEPCC") of Material Off Loading Facilities ("MOLF") Jetty at Tanjung Setapa for Refinery and Petrochemical Integrated Development ("RAPID") Project at Pengerang, Johor ("Works").
The Contract Price is RM248,499,647.93 for the Scope of Works which is based on:
(a) lump sum with breakdown as per itemized cost given in Schedule of Prices; and
(b) provisional sum based on Bill of Quantity and Schedule of Rates.
The contract duration for the Works is 18 months.
The MOLF Jetty is intended to be used for import of Heavy Lift Oversized ("HLO") and Super HLO equipment and materials as well as some break-bulk and containerized cargo during the implementation of the RAPID Project.
None of the directors and/or major shareholders of the Company, or persons connected with them, has any interest, direct or indirect, in the above contract.
This Announcement is dated 24 July 2014.
2014-08-05 10:24 | Report Abuse
2014-08-05 10:18 | Report Abuse
Zelan: To win MYR250m ECER job. Zelan is expected to bag a MYR250m contract from the East Coast Economic Region (ECER) for the construction and completion of a drawbridge connecting Muara North and Muara South in Kuala Terengganu. Zelan is partnering Hasrat Sedaya Sdn Bhd, an engineering company specializing in bridge construction. They have a 70% and a 30% equity interest in the joint venture respectively. (Source: The Edge Financial Daily)
2014-08-05 10:16 | Report Abuse
Zelan Bhd unit Zelan Construction Sdn Bhd (ZCSB) has received a contract from the East Coast Economic Region Development Council for the construction of the RM248.7mil drawbridge connecting Muara North and Muara South in the Kuala Terengganu city centre. The overall length of the bridge is 632 metres, with a width of 23 metres. The clear span of the drawbridge is 50 metres long. A statement to Bursa Malaysia said that the contract duration was for 135 weeks, commencing on the date for possession on Aug 13. (StarBiz)
2014-08-05 09:55 | Report Abuse
careful guys
" afternoon price will be cheaper i guess, coz got last Wed's T+4 and last Thur's T+3 forced selling this afternoon"
look for better entry point this afternoon
2014-08-05 09:36 | Report Abuse
afternoon price will be cheaper i guess, coz got last Wed's T+4 and last Thur's T+3 forced selling this afternoon
2014-08-05 09:30 | Report Abuse
i am looking for entry point again , ahah
2014-08-05 09:29 | Report Abuse
" Posted by FX Lee > Aug 5, 2014 09:07 AM | Report Abuse X
27 cent resistance, i think will go down to 25.5 cent small retrace later"
tengah retrace
2014-08-05 09:07 | Report Abuse
27 cent resistance, i think will go down to 25.5 cent small retrace later
2014-08-05 08:47 | Report Abuse
i think can break 26 cent today morning
2014-08-05 07:44 | Report Abuse
EAH - OTHERS EA HOLDINGS BERHAD ("EAH" or ("Company") PROPOSED ACQUISITION BY EAH OF 5,000,000 ORDINARY SHARES OF RM1.00 EACH IN MURASAKI TECHNOLOGY SDN BHD ("MTSB"), REPRESENTING 100% EQUITY INTEREST IN MTSB FROM CHIA KOK CHIN AND LOW TEE CHOW FOR A TOTAL PURCHASE CONSIDERATION OF RM18,000,000 TO BE FULLY SATISFIED VIA CASH ("PROPOSED ACQUISITION")
2014-08-05 07:38 | Report Abuse
anyone know what happen to this company, suddenly move up
2014-08-05 07:34 | Report Abuse
50 cent broken.... can hold for higher
Stock: [ZELAN]: ZELAN BHD
2014-08-05 22:32 | Report Abuse
http://klse.i3investor.com/servlets/stk/chart/2283.jsp
hammer form !!!!!! strong buy !!!!!!!!!!!