GoHaiDuongGo

GoHaiDuongGo | Joined since 2018-01-12

Investing Experience -
Risk Profile -

Followers

0

Following

0

Blog Posts

0

Threads

156

Blogs

Threads

Portfolio

Follower

Following

Summary
Total comments
156
Past 30 days
2
Past 7 days
2
Today
0

User Comments
Stock

2019-10-06 13:09 | Report Abuse

Going by the record of 永新, HaiDoung 1st unit Commercial Operation will be in May- June 2020

Stock

2019-07-31 12:05 | Report Abuse

All in all, on track to start Commercial Operation of Unit #1 by 3rd Quarter 2020, or even earlier.

Stock

2019-04-29 16:29 | Report Abuse

difficult to get warrant at 9c

Stock

2019-04-29 13:15 | Report Abuse

Yes, and I believe it will come sooner than later

Stock

2019-04-29 11:55 | Report Abuse

if you believe in the salcon storey, buy warrant

Stock

2019-04-28 15:24 | Report Abuse

http://www.aepc1.ceec.net.cn/art/2019/4/28/art_14630_1888042.html

Working extra hard. COD for Unit #1 will be achieved in 3rdQ2020, and Unit #2 in 4thQ2020 if not earlier.

Stock

2019-04-15 07:35 | Report Abuse

http://www.ntfec.org/fxbz/contents/2350/31822.html
風險 in investment just have to be managed.

Stock

2019-04-13 09:33 | Report Abuse

DK66>>> I m a little surprised that unit 1 of the plant is expected to be commissioned by end of this year. Anyway, a positive surprise.
12/04/2019 8:11 PM

I just wonder why you are surprised.What is in your mind DK?

Stock

2019-04-11 10:07 | Report Abuse

I am panicking now,and ......
========================
optimumprime88 ::::warrant collapse!
11/04/2019 9:28 AM

Stock

2019-04-09 15:07 | Report Abuse

The writer was ignorant of the CNY 450k equivalent perday penalty in the BOD agreement?

Stock

2019-04-09 14:46 | Report Abuse

I am thinking that 18 months is ample time. Of course earlier COD is always a possibility because they are Chinese big boys.

Stock

2019-04-09 13:51 | Report Abuse

The haiduong online newspaper in your article mentioned commercial operation

Stock

2019-04-09 13:48 | Report Abuse

Performance testings are conducted before COD. And COD is considered the completion date if I am correct. There is no point completing earlier and can’t achieve COD because of too many things not meeting the specifications and requiring all the rectification works over a long period of time. I may be wrong.

Stock

2019-04-09 13:38 | Report Abuse

No, Commercial Operation Date for# 1 is 1 Oct 2020

Stock

2019-04-09 13:15 | Report Abuse

Thank you DK66 for sharing all the facts about the project.
Unit # 1 Scheduled COD 1 Oct 2020
Unit # 2 Scheduled COD. 1 Apr 2021
Frequent progress updates by the Chinese thrill many of us here.
18 more months of round the clock toiling will get #1 running.
Be patient and stay invested in Jaks !

Stock

2018-12-21 16:28 | Report Abuse

DK66
My figures are for mathematicall illustration of the point which I have raised.
I am a HaiDuong devotee.
Thank you for the information.

Stock

2018-12-21 14:05 | Report Abuse

DK66 always provide factual and objective postings.
However, I feel compelled to point out he has unknowingly erred in his recent posing

“”””””Jaks' CFO stated that the power plant was 41% completed as at October but Jaks only recognised about 31% completion until Sept. Assuming no progress in Nov and Dec, Jaks may recognise 10% work done which means potential of RM45m profit from vietnam EPC in Q4 2018. “””
epc 1(30%) + epc 2 (70%) =HaiDuong(100%)

Q3
(31% x30%) + (??% x70%)=(??% out of 100%)

September
(XX% x30%) + (YY% x70%)=(41% out of 100%)
Try XX=31 , YY =45.2, You get 41%

Try XX=35 , YY=43.6, You get 41%

Stock

2018-12-11 09:15 | Report Abuse

Alps ski holiday for now

Stock

2018-12-10 11:28 | Report Abuse

Please enlighten, any one ?

Stock

2018-12-10 11:26 | Report Abuse

Will be reflected in next quarter statement

Stock

2018-12-10 11:25 | Report Abuse

What will happen to RM18.7 million used to acquire 26.7% in TawauGreen Energy SB?
Down the drain?

Stock

2018-04-18 13:39 | Report Abuse

Let’s see if the few project milestones mentioned will be achieved.

Stock

2018-04-17 15:38 | Report Abuse

http://www.apcc2.ceec.net.cn/art/2018/4/16/art_8427_1619394.html
皖2, the other sub contractor for EPC Contract 1, also working hard on Unit No.2

Stock

2018-03-27 15:22 | Report Abuse

Chinaman working hard at HaiDuong

Stock

2018-03-26 17:47 | Report Abuse

Let’s us see how they will be reporting their progress in the next few months. May be they are going PokGuy and want to stop work.....

Stock

2018-03-26 16:04 | Report Abuse

The Chinese Contractor is world class and has all the resources so that works progress will be as scheduled

Stock

2018-03-26 15:49 | Report Abuse

近日,为保证2018年年度计划如期完成,越南海阳项目部会同合作队伍合理调配人力资源,采取昼夜轮班的方式,加速推进现场施工进度。
  2018年3月18日,越南海阳项目部昼夜轮班施工制度正式开始。昼夜轮班区域主要集中在主厂房、#1-1、#1-2锅炉以及组合场区域等,目的是为加速推进汽机基座、主厂房、锅炉钢架以及循环水管制作施工,确保汽机台板就位、主厂房屋面断水、锅炉受热面开吊以及循环水管安装顺利完成。此次昼夜轮班,项目部采用专业技术员现场值班,项目领导、安全员巡检的方式,对各个施工作业点进行全程监控;昼夜交替换班时,由项目专业技术人员对夜班施工人员进行安全教育和技术交底,施工过程中进行相关技术指导,项目领导及安全员作业点定时巡检,确保各作业点保质、保量、安全有序向前推进。截止22日,主厂房B-C排第一层钢柱吊装完成、钢梁及斜撑完成70%,汽机基座开始施工,#1-1锅炉第四层钢架完成70%,#1-2锅炉第三层钢架完成70%,循环水管制作完成400吨、喷砂防腐完成4件。

  轮班作业,加快现场工作推进的同时,有效的避免了白天多专业交叉施工带来的安全隐患,也为2018年5月27日锅炉受热面开吊、8月4日汽机台班就位里程碑节点工期如期完成奠定了坚实的基础,更为雨季来临之前,厂房内能够有序的施工提供必要的作业条件。(何明汉)

Stock

2018-03-12 15:49 | Report Abuse

DK66::: Jaks is not involved in the construction of the Vietnam power plant. It has fully subcontracted its works to CPECC.
12/03/2018 07:17

DK66, can you please provide the link to the above, Tq.

Stock

2018-02-10 10:59 | Report Abuse

DK66 , well said....

Stock

2018-02-07 17:43 | Report Abuse

LTI@
Polish your math skills please.

Stock

2018-02-07 08:07 | Report Abuse

越南当地时间2月3日上午9:30,越南海阳2×60万千瓦燃煤电厂烟囱外筒完成混凝土浇筑,顺利到顶。

  烟囱设计总高度170米,外形美观、线条流畅、施工质量优良。烟囱外筒总高为165米,底部外径25.5米,出口外径17.5米,为钢筋混凝土结构。外筒采用电动提升翻模施工工艺,通过封闭的提升平台循环提升内、外模板,实现不间断流水作业。施工中,设置提升架十余组,增加了承载冗余;平台外围和作业面封闭严密,平台下设置多重防护措施,充分保障了高空安全作业。

此次顺利完成烟囱外筒施工,是本工程有序推进的阶段性成果,为海阳项目实现投产目标奠定了坚实的基础。

Stock

2018-02-06 08:09 | Report Abuse

Up.....Up......Up......
Up... Up.... to the Sky

  2月3日上午9时38分,公司承建的越南海阳2×600MW燃煤电厂工程四筒合一烟囱外筒壁顺利到顶。
  该烟囱外筒壁内有4只钢内筒,几何尺寸较大,最大外半径为12.69米,出口内半径为8.4米。外筒壁高165米,共计110节。
  该工程烟囱自基础土方开挖以来,海阳项目部科学组织、精心施工,面对当时现场三通一平工作未完善,施工环境差等困难,该项目部始终严把安全质量关,丝毫不降低安全、质量要求。浇筑期间,管理人员轮班对搅拌站、用水用电、运输道路、作业现场、土建实验室等进行全过程全环节值班监护,整个浇筑过程始终处于可控在控状态。
  浇筑完成的烟囱筒壁几何尺寸准确,线条流畅,外观色泽一致,已成为越南京门地区最高的标志性建筑物,受到BOT、EPC及外界的一致好评。

Stock

2018-02-05 22:02 | Report Abuse

ooops, you mean earning per share will be diluted....?

Stock

2018-02-05 13:49 | Report Abuse

wahhh, I dropped and broke my glasses

Stock

2018-02-05 13:13 | Report Abuse

I think there is a very very smart Chimp out there playing Dumb and Dumber. Afterall, KYY has swung into high gear in expressing his political affiliation. Pump and Dump? Let’s see......

Stock

2018-02-03 17:59 | Report Abuse

Let’s see how 74K5 fares in 666 turbulence

Stock

2018-02-03 17:38 | Report Abuse

long term investor ##Thank you for link to the AHC paper

Stock

2018-02-03 17:18 | Report Abuse

bluebiznet::::::: “.Base on FA...........”
what is the meaning of FA?