Johnchew5

Johnchew5 | Joined since 2019-08-18

Investing Experience -
Risk Profile -

Followers

11

Following

0

Blog Posts

0

Threads

11,339

Blogs

Threads

Portfolio

Follower

Following

Summary
Total comments
11,339
Past 30 days
442
Past 7 days
0
Today
0

User Comments
Stock

3 weeks ago |

Post removed.Why?

Stock

3 weeks ago |

Post removed.Why?

Stock

3 weeks ago |

Post removed.Why?

Stock

3 weeks ago |

Post removed.Why?

Stock

3 weeks ago | Report Abuse

> PowerSeraya 2 Power Plant are anticipated going to be phase out due to the Service life :


> Steam Turbine Power Plant thermal project with a capacity of 1,448MW by 2027 ..


Pulau Seraya Combined Cycle Power Plant is a 1,472MW by by 2026 to 2031 .

>> Total Capacity = 2,920 MW

There is a New Power Plant announced on : 2 Feb 2024 — The construction of a 600MW hydrogen-ready CCGT is estimated to cost $800 million and is targeted to be completed by 31st December 2027.

Stock
Stock
Stock
Stock
Stock
Stock

3 weeks ago | Report Abuse

Combined cycle plants are usually powered by natural gas, although fuel oil, synthesis gas or other fuels can be used. The supplementary fuel may be natural gas, fuel oil, or coal. Biofuels can also be used.

Stock
Stock

3 weeks ago | Report Abuse

Hi Jonathan, yes still a oil fired power plant.

Because the turbine generates rotary motion, it can be coupled to a generator to harness its motion into electricity. Such turbogenerators are the core of thermal power stations which can be fueled by fossil fuels, nuclear fuels, geothermal, or solar energy. About 42% of all electricity generation in the United States in the year 2022 was by use of steam turbines.

—

Posted by Jonathan168138 > 7 minutes ago | Report Abuse

Hi Mike this Steam Turbine Power Plant still a oil fired power plant. Still not zero emissions right? Have to pay Singapore government a lot of Carbon Tax betul?


> Steam Turbine Power Plant thermal project with a capacity of 1,448MW by 2027 ..

Stock
Stock
Stock
Stock

3 weeks ago |

Post removed.Why?

Stock

3 weeks ago |

Post removed.Why?

Stock

3 weeks ago |

Post removed.Why?

Stock
Stock
Stock

3 weeks ago | Report Abuse

2.) Referred QR ended March 2024 :

PowerSeraya n TNB Genco entered into an arrangement to export n import 100 MW of electricity to Singapore via the newly upgraded interconnector between the 2 countries..

👉No update of any progress in QR ended June 2024 ??

Stock

3 weeks ago | Report Abuse




Australia Approves $19B Solar Project to Power Singapore via Submarine Cable
Associated Press
August 21, 2024


Newcastle, Australia. An ambitious plan to build a massive solar farm in remote northern Australia that would transmit energy by submarine cable to Singapore is a step closer after the Australian government granted environmental approvals for the 30 billion Australian dollar ($19 billion) project Wednesday.


Australia Approves $19B Solar Project to Power Singapore via Submarine Cable https://jakartaglobe.id/business/australia-approves-19b-solar-project-to-power-singapore-via-submarine-cable

Stock
Stock
Stock
Stock

3 weeks ago | Report Abuse

The cost of submarine cables varies quite a bit, with communication submarine cables typically costing between $30,000 and $50,000 per km and submarine power cables costing over $2.5 million a km.
28 Dec 2023

Stock
Stock
Stock

3 weeks ago |

Post removed.Why?

Stock

3 weeks ago |

Post removed.Why?

Stock

3 weeks ago |

Post removed.Why?

Stock

3 weeks ago |

Post removed.Why?

Stock

3 weeks ago |

Post removed.Why?

Stock

3 weeks ago |

Post removed.Why?

Stock
Stock
Stock
Stock

3 weeks ago | Report Abuse

EU: British manufacturing sentiment falls in July. Optimism among British manufacturers dropped marginally in July but their output expectations hit the strongest since March 2022, a closely watched survey showed. After rising in April for the first time in nearly three years, the business confidence index fell to -9% from +9 in April, the latest quarterly Industrial Trends Survey results from the Confederation of British Industry showed. At the same time, export optimism was flat in the three months to July after rising in the preceding quarter. A net 3% of manufacturers said output volumes declined in the quarter to July compared to a net 3% reporting increase in the prior period. (RTT)

UK: Car production declines as manufacturers switch to electric models. UK car output declined in the first six months of the year as manufacturers continue to shift their investment to make electrified models, the Society of Motor Manufacturers and Traders said. In the first six months of the year, car production declined 7.6% from the previous year. Factories turned out 416,074 units, down by 34,094 from the same period last year. During January to June, electrified vehicle production also dropped 7.6% annually. (RTT)

Stock

3 weeks ago |

Post removed.Why?

Stock
Stock
Stock

3 weeks ago |

Post removed.Why?

Stock
Stock
Stock
Stock
Stock

3 weeks ago | Report Abuse

Electricity grid's third-party access open by September to new RE plants, new demand
By Adam Aziz / theedgemalaysia
26 Jul 2024, 10:49 am


KUALA LUMPUR (July 26): The government is en route to open up third-party access to Malaysia's electricity grid, with the launch of the Corporate Renewable Energy Supply Scheme (CRESS) from September, focusing on green electricity supply.

This means an electricity buyer can negotiate pricing directly with a renewable energy power plant for green electricity supply, according to a statement by the Ministry of Energy Transition and Water Transformation.

However, the statement did not elaborate on the charges that will be imposed for third parties to access the grid.

Currently, end-users are all sourcing their electricity, comprising both conventional and renewable energy-generated electricity, from Tenaga Nasional Bhd (KL: TENAGA) which is also the sole operator of the national grid.

The programme will be open for new renewable energy power plants, focusing on those that are able to provide firm output. Higher access system charges will be imposed on those without firm output, the statement said.

On the consumer side, it is open for new electricity customers of medium and high voltage, and for existing electricity customers — but only covers additional electricity demand.

Another requirement is direct electricity connection through the grid between the power plant and the customer.

“The single buyer and grid system operator will play the role of the market and system operator,” the statement said.

“Tenaga Nasional Bhd will continue to play its role as the electricity utility supplier that will supply electricity generated to consumers consistently within and outside of the period where green electricity is supplied,” the statement read.

“The programme is expected to de-risk and reduce costs of national electricity supply, and provide a fair opportunity for healthy competition among [green energy] developers,” the statement added.

Stock

3 weeks ago | Report Abuse

The application for the CGPP has commenced from 9 May 2023 until 31 December
2023 or until the total allocation quota of 800MW is fully subscribed.

There are total
of 71 applications received thus far, and the successful Solar Power Producer are listed
below:

No. Solar Power Producer Export Capacity
(MWac)

1. Cenergi EE Holdings Sdn. Bhd. 29.99

2. Coara Solar Sdn. Bhd. 29.99

3. Consortium of Angelaxy Power Sdn. Bhd. and Uzma
Environergy Sdn. Bhd.
12.16

4. Consortium of Atlantic Blue Sdn. Bhd. and TNB
Renewables Sdn. Bhd.
29.99

5. Consortium of Conextone Energy Sdn. Bhd. and ENGIE
Renewable SEA Pte. Ltd.
29.99

👉6. Consortium of JAKS Solar Power Sdn. Bhd., Ann Joo Green
Energy Sdn. Bhd. and Fabulous Sunview Sdn. Bhd.
29.99

7. Consortium of KVC Corporation Sdn. Bhd, Meriah Suria
Sdn. Bhd. and Kuala Berang Solution Sdn. Bhd.
29.515

8. Consortium of Nestcon Infra Sdn Bhd. and Pristine
Multivision (M) Sdn. Bhd.
10.00

9. Consortium of Reservoir Link Renewable Sdn. Bhd.,
Sumitomo Corporation and Maqo Engineering Sdn. Bhd.
29.99.

10. Consortium of Salcon Berhad and KAB Smart Solar Energy
Sdn. Bhd.
7.00

11. Consortium of Savelite Engineering Sdn. Bhd., Blazing
Solar Sdn. Bhd. and TNB Renewables Sdn. Bhd.
29.99

12. Consortium of Shizen Malaysia Sdn. Bhd., HSS Engineering
Sdn. Bhd., Solarvest Asset Management Sdn. Bhd. and
Aziho Trading Sdn. Bhd.
29.99

13. Consortium of Solar Citra Sdn. Bhd. and Total Energies
Renewables SAS
29.99

14. Gading Kencana Sdn. Bhd. 30.00

15. Mega First Power Industries Sdn. Bhd. 29.99

16. Pekat Teknologi Sdn. Bhd. 29.99

17. Sime Darby Plantation Renewable Energy Sdn. Bhd. 14.989

18. Solarcity REIT Sdn. Bhd. 29.99

19. Starken AAC Sdn. Bhd. 10.00

20. Sunway Construction Sdn. Bhd. 29.90

21. Tanah Matahari Sdn. Bhd. 29.99

22. TNB Renewables Sdn. Bhd. 29.99
* Balance Quota – 236.58MW

Stock