kenlaw

kenlaw | Joined since 2011-12-29

Investing Experience -
Risk Profile -

Followers

0

Following

0

Blog Posts

4

Threads

538

Blogs

Threads

Portfolio

Follower

Following

Summary
Total comments
538
Past 30 days
0
Past 7 days
0
Today
0

User Comments
Stock

2018-07-17 17:32 | Report Abuse

dont over confident. tml 50:50

Stock

2018-07-17 16:07 | Report Abuse

bought 10000 shares@0.695

Stock

2018-07-13 11:57 | Report Abuse

get 10000shares at 0.70
another 20000shares q at 0.69
but cannot get

Stock

2018-07-13 11:55 | Report Abuse

mrcb rebound back after touch 0.69
will closed 0.80 today.

Stock

2018-07-13 08:52 | Report Abuse

HSR proceed with cancel out two station at Johor and one at selangor.

Stock

2018-07-12 19:39 | Report Abuse

happy happy. 18k just today.

Stock

2018-07-12 15:16 | Report Abuse

up15% today. will go back rm1 soon.

Stock

2018-07-12 09:14 | Report Abuse

LRT3 continue with final cost Rm16 billion

Stock

2018-07-12 09:13 | Report Abuse

KUALA LUMPUR (July 12): The Pakatan Harapan government has approved the continuation of the light rail transit 3 (LRT3) project at a final cost of RM16.63 billion.

In a statement today, Finance Minister Lim Guan Eng said the final total cost of the LRT3 project is reduced by 47% from RM31.65 billion to RM16.63 bilion, saving Malaysians a total of RM15.02 billion.

He said this will include all project costs, including but not limited to Work Package Contracts (WPC), land acquisition, project management, consultancy fees, operational and overhead costs, as well as interest during construction.

Lim said the 37km Light Rail Transit 3 (LRT3) project is a critical project meant to alleviate the issue of traffic congestion along one of the most important and densely populated economic development corridors in the Klang Valley, from Klang to Petaling Jaya.

He said the new LRT line is expected to serve a 2-million population with the capacity to transport 36,700 passenger per hour each way.

Lim added that a thorough renegotiation and rationalisation exercise of the LRT3 project was undertaken with all key stakeholders including Prasarana, MRCB-George Kent (M) Bhd joint venture (MRCB-GK JV) who is the Project Delivery Partner (PDP) and Land Public Transportation Commission (SPAD).

“One critical criteria for the review was that the integrity of the 37km LRT3 line from Johan Setia (Klang) to Bandar Utama (Petaling Jaya) must be maintained.

“In addition, the safety, frequency and quality of service must meet the requirements of the regulators,” he said.

Lim said that in addition, the construction of the LRT3 project will be restructured from a PDP model to a “fixed price contract” with MRCB-GK JV.

He said this will ensure that the price will be fixed and will not be subject to cost overruns.

“The details of this contract will be disclosed at a later stage.

“The savings of more than RM15 billion would not only mean a massive reduction of RM15 billion in debt to be incurred, but also result in additional savings to the tax-payers of up to RM14 billion in interest cost over the period of the loan financing,” he said.

Stock

2018-07-11 16:26 | Report Abuse

buy 10000 shares again today.

Stock
Stock

2018-07-04 16:27 | Report Abuse

bought mrcb 10000shares @0.6

Stock

2018-06-22 15:43 | Report Abuse

ph government going to support GLC now.
2.8 billion to TRz

Stock
Stock

2018-06-21 17:05 | Report Abuse

ytl drop more today compare to mrcb..

Stock

2018-06-20 15:03 | Report Abuse

KUALA LUMPUR (June 20): Malaysian Resources Corp Bhd (MRCB) has appointed Mohd Imran Mohamad Salim as its new group managing director, effective July 2.

With the appointment, MRCB said Mohd Imran will be re-designated from his previous position as executive director.

Mohd Imran will succeed his father, Tan Sri Mohamad Salim Fateh Din, who will retire in early July after helming MRCB for nearly five years since Sept 2, 2013.

Both Mohd Imran and Mohamad Salim are indirect shareholders in MRCB.

Meanwhile, MRCB also announced the re-designation of Tan Sri Azlan Zainol as its independent chairman.

"MRCB wishes to comply with Practice 4.1 of the Malaysian Code on Corporate Governance (MCCG)," it said in a filing with Bursa Malaysia today.

According to the MCCG, MRCB said at least half of the board of directors of a listed company should comprise independent directors.

"Presently, five out of the company's eight directors are non-independent directors, and only three are independent directors," it added.

Following Mohd Imran's re-designation and Mohamad Salim's retirement, MRCB said its board of directors will now comprise four independent directors and three non-independent directors.

At noon break today, MRCB shares gained 0.5 sen or 0.78% to pause at 65 sen, giving it a market capitalisation of RM2.85 billion.

Stock
Stock

2018-06-20 09:37 | Report Abuse

sarah become mrcb ceo, share price up today

Stock

2018-06-20 09:19 | Report Abuse

let sarah become mrcb ceo.

Stock

2018-06-19 18:53 | Report Abuse

马资源董事经理莫哈末沙林任期于6月杪届满后未获续约。(图:星洲日报)
(吉隆坡19日讯)大马政府相关公司高层下台消息不断,最新一宗是传言马资源(MRCB,1651,主板产业组)董事经理丹斯里莫哈末沙林任期于6月杪届满后未获续约。

大华继显研究在报告中披露,现年61岁的莫哈末沙林将在6月杪退休,因未获希盟政府更新合约。

儿子英兰料接棒

不过,该行预计莫哈末沙林的的儿子莫哈末英兰将接下父亲留下的棒子。

莫哈末沙林透过Garpuna集团在2013年注入资产至马资源,从而取得马资源股权,崛起成为第二大股东,并在2013年9月2日入主该公司董事部。截至3月15日,Gapuma持有马资源16.61%股权。

他的公子莫哈末英兰目前为马资源执行董事,之前于2013年3月至2015年2月期间出任集团首席营运员。

大华继显表示,目前正等待更多详情公布,但对马资源保持正面和买进评级。

该行认为,马资源保持为深具价值的股项,潜在脱售更多资产套现,并由雇员公积金局(EPF)主导大权。目前,公积金局持有马资源34.87%股权,朝圣基金局则为第三大股东,持有7.14%股权。

该行早前在报告中预期,马资源将完成以4亿2100万令吉脱售RukunJuang私人有限公司给公积金局,这将是重大减债行动。截至3月杪,马资源总借贷共33亿8000万令吉,相等于0.58倍负债比。

Rukun Juang私人有限公司负责武吉加里尔国家体育馆私营化计划,从中换取3块面积共76.14英亩地段,将进行210亿令吉综合产业发展计划。

大华继显预期马资源短期内股价将从目前约64.5仙升抵其合理价位1令吉零1仙。此目标价为该公司估值1令吉26仙的20%折价,相等于24.3倍本益比估值。

随着大马政局改朝换代后,政府机构及政府相关公司高层首脑继续大洗牌,第一位是自愿卸任的联邦土地发展局(FELDA)主席丹斯里沙里尔。

过后,国家银行总裁丹斯里慕哈末依布拉欣在本月6日辞职。

市场关注国油交易所

同日,马电讯(TM,4863,主板贸服组)首席执行员拿督斯里沙查里也宣布辞去该公司职务,成为新政府上任后,政府相关公司第一位下台的高层。

据称,国家石油(Petronas)主席丹斯里西迪哈山会在短期内辞职,以铺路让前首席执行员丹斯里哈山马力肯回归。此外,国油薪酬委员会主席兼独立非执行董事莫哈末奥玛已呈辞,并在本月30日生效。

早前,市场也传出大马交易所首席执行员拿督斯里达祖丁将被撤换的消息。达祖丁的任期原订在明年3月届满。。。。

Stock

2018-06-13 09:08 | Report Abuse

from japan connect to north korea then connect to USA.

Stock

2018-06-12 17:39 | Report Abuse

tabung haji
07 Jun 2018
500,000
Disposed

Stock
Stock

2018-06-12 16:27 | Report Abuse

so we can buy very good quality proton car witb zero gst. sarah , you buy 200 protons.

Stock

2018-06-12 16:26 | Report Abuse

sarah, please tell Tun m cancel komuter, lrt, mrt, hsr and built another proton no 2.

Stock

2018-06-12 13:51 | Report Abuse

mrcb will be the solely hsr pdp project partner.

Stock

2018-06-12 12:57 | Report Abuse

now point to sp setia buttersea project. sp setia drop 9%

Stock

2018-06-12 09:48 | Report Abuse

0.79 is right issue price.

Stock

2018-06-08 16:18 | Report Abuse

dont argue...buy sarah. sure win.

Stock

2018-06-07 16:16 | Report Abuse

kwsp
01 Jun 2018
3,000,000
Acquired

Stock
Stock

2018-06-07 11:40 | Report Abuse

look like no energy..to move up...

Stock

2018-06-07 10:20 | Report Abuse

PH include maintainince cost.