luckyman

luckyman | Joined since 2011-08-17

Investing Experience -
Risk Profile -

Followers

1

Following

1

Blog Posts

0

Threads

694

Blogs

Threads

Portfolio

Follower

Following

Summary
Total comments
694
Past 30 days
4
Past 7 days
0
Today
0

User Comments
Stock

2019-12-09 17:52 | Report Abuse

Substantial improved quarterly profits will start soon as being derived from its 96% sold Phase 1 of Pavilion Embassy in the next 8 quarters....this can be deduced from its annual report (page 19)

https://www.malaysiastock.biz/GetReport.aspx?file=AR/2019/7/31/1147%20...

Stock

2019-12-03 16:42 | Report Abuse

Still very undervalued in terms of both PE, and NTA of RM1.15

Stock

2019-11-26 21:19 | Report Abuse

The Company had on 26 November 2019 entered into a strategic collaboration agreement with a wholly owned subsidiary of China Railway Group Limited (“CREC”), to establish a broad-based multi-angle and nonexclusive collaboration and strategic cooperation arrangement in relation to construction, development, infrastructure, airport and seaport and other development activities in Malaysia and in the Asia Pacific Region (“Collaboration”) upon such terms and subject to such conditions as may be mutually agreed upon by the parties (“Strategic Collaboration Agreement”).

The CREC Group has built more than 2/3 of China’s national railway network, 90% of China’s electrified railways, 1/8 of the national expressways and 3/5 of the urban rail transit system. Currently, the CREC Group has achieved world advanced level in bridge construction and holds a leading position in tunnel and subway construction in China and represents the highest technical standard in China’s railway electrification.

So, will Ekovest get a major contract of the ECRL mega project?

Stock

2019-11-23 17:56 | Report Abuse

Q3 result of 2019 may be much lower than Q3 result of 2018 as the previous year's Q3 car sales was very much boosted & bumped up by the tax holiday then. Hence, don't know if the share price would drop again soon after this coming Q3 result announcement.....

Stock

2019-11-15 21:42 | Report Abuse

https://disclosure.bursamalaysia.com/FileAccess/apbursaweb/download?id=206484&name=EA_FR_ATTACHMENTS

Barring any unforeseen circumstances, the Directors remain optimistic with the Group’s
prospects for next financial year, based on the positive developments of the Company specific
in PTD 2018

Stock

2019-11-15 21:30 | Report Abuse

Year on Year (“YoY”), its gross profit in FY 30/6/2019 improved by 19.14% from the previous year, from RM124.58 million within a 12-month period of FY2018 to RM148.43 million in FY30/6/2019. Profit Before Tax (“PBT”) surged 407.77% to RM41.84 million in FY2019, compared to RM8.24 million in a 12-month period of FY2018.

Stock

2019-11-07 19:38 | Report Abuse

As at June 2019, SESB has an order book of approximately USD272 million and has a prospective tender pipeline of an estimated value of USD172 million which are tenders that it is participating in globally. The Company is constantly looking at avenues to capture these opportunities including the prospect of partnering with technology or financially stable partners.

Extract from its Annual Report

Stock

2019-11-01 15:08 | Report Abuse

The company had RM68 mil as of 30/6/19 based on its quarterly report. Its cash flow position may not be as bad as it's being perceived now. The share price may rebound sharply once there is more clarity on how its bonds can be repaid.

Stock

2019-10-28 11:16 | Report Abuse

It's a matter of time for its existing on going projects to show much improved earnings to help propel its share price to a much higher level. It may take another few months or quarters.

Stock

2019-10-23 22:27 | Report Abuse

https://www.thestar.com.my/metro/metro-news/2019/10/23/property-fair-seeing-good-sales#cxrecs_s

RM39 mil sales for City of Dreams was generated within 4 days from the property fair.

Stock

2019-10-23 22:10 | Report Abuse

https://www.theedgemarkets.com/article/ocr-179-plan-launch-kuantans-tallest-development-rm268m-gdv-1h20

The group saw 85% of its affordable homes under the first phase of its RM166 mil PRIYA Scheme Kuantan project taken up, reflecting strong demand for affordable housing.

https://www.thestar.com.my/business/business-news/2019/10/21/ocr-to-launch-rm268mil-gdv-vertex-kuantan-project-in-1h20

Stock

2019-10-19 11:12 | Report Abuse

https://www.ocrbhd.com/property_projects/

Its RM240mil Isola @ KLCC project will contribute significant profit growth for the company in the next two years given its 80% locked-in sales.

Stock

2019-10-15 20:53 | Report Abuse

https://klse.i3investor.com/blogs/hleresearch/226772.jsp

Maintain BUY, TP: RM1.58. Maintain BUY rating with unchanged TP of RM1.58. TP is pegged to 8x FY19 earnings. We like Kimlun for its execution capability and undemanding valuations. The stock is trading at 6.3x PE multiple on FY19 earnings, represents -1.6SD below 5 years historical average.

Stock

2019-10-11 20:14 | Report Abuse

https://www.thestar.com.my/news/nation/2019/10/11/budget-2020-rm600k-threshold-for-foreigners-to-purchase-urban-high-rise-properties

Phases 1 & 2 of City of Dream will be fully sold soon with the above relaxation....... RM1 TP for Ewein will be on the way before CNY 2020.

Stock

2019-09-19 01:25 | Report Abuse

https://malaysiastock.biz/Company-Announcement.aspx?id=1166366

First half FY2019 has already achieved EPS of 10 sen. Full year => 20 sen ? !!

Stock

2019-09-17 18:03 | Report Abuse

https://www.thestar.com.my/news/nation/2019/09/11/zuraida-mulls-selling-rm100bil-worth-of-unsold-high-end-property-to-china-hong-kong-buyers

The above proposition should bring substantial benefits to BCB's existing high end Hometrees and The Elysia Park Residence projects.

Stock
Stock

2019-08-23 18:55 | Report Abuse

https://malaysiastock.biz/Company-Announcement.aspx?id=1166366

6 months EPS is already 10 sen. Good result as expected!

Stock

2019-08-12 18:29 | Report Abuse

This is a very undervalued company with good growth potential for the next few years. Unfortunately most analysts still feel reluctant to upgrade the property sector or say something positive about the sector.... Nevertheless this could be a bottom fishing opportunity....

Stock

2019-08-12 18:18 | Report Abuse

Ewein is expected to report very good profits for the next few quarters due to the good sales of City of Dreams and the advance stage of completion

Stock

2019-08-02 18:14 | Report Abuse

https://disclosure.bursamalaysia.com/FileAccess/apbursaweb/download?id=195502&name=EA_DS_ATTACHMENTS

The proposed re-development of the Sri Damansara Club land is currently in progress. The Court Order to wind up Sri Damansara Club’s interest scheme was obtained in June 2019. The Club is expected to cease operation by the 4th quarter 2019. The preparation for submission of the development plans for a mixed high rise development project is underway. The estimated
GDV of the project is valued at RM2.0 billion

Aria Rimba, L&G’s 112-acre township at U10, Shah Alam, is a mixed-development project that consists of link houses, semidetached houses, serviced apartments and affordable houses under the Rumah Selangorku initiative. The project, with an estimated total gross development value (GDV) of RM1.1 billion, will be developed over five phases throughout the next six years. Earthworks for Aria Rimba has already commenced and the development is expected to be launched from early 2020 onwards.

For FY March 2020 financial year, the Group is well poised to take advantage of an upward trending market with its on-going projects in the Klang Valley, namely Damansara Seresta (GDV of RM480 million); Astoria Ampang Phase 1 (GDV of RM400 million); and Sena Parc Phase 1 (GDV of RM35 million). The Group also intends to launch its Shah Alam landed development project, Aria Rimba, (GDV of RM1.1 billion) in 2020.

Stock

2019-08-01 20:24 | Report Abuse

Currently, the Group has about 500 acres of land bank for
development (including those under joint ventures). Notwithstanding
the challenges faced in the property sector, the Group would
continue its efforts to enhance our land bank via strategic tie ups
or joint ventures with land owners and/or through acquisition.
As at 31 March 2019, the Group had a healthy total unbilled
sale of approximately RM655.0 million from ongoing projects.

Pavilion Embassy, Kuala Lumpur
This development is sited on 5.75 acres of prime
freehold land along Jalan Ampang, Kuala Lumpur. It is an
integrated development which entails a premium collection
of corporate suites, service suites and private residences. It
is strategically located within the upscale enclave of Kuala
Lumpur City Centre, just 1.2 kilometers away from the iconic
Petronas Twin Tower and is situated right in the heart of the
embassy row coveted for its prestigious international address.
The project with an estimated GDV of about RM1.0 billion, will
be developed in 2 phases, with Phase 1 comprising 3 blocks
of corporate and service suites and Phase 2 with 2 blocks
of private residences. Phase 1 was launched in September
2017 and achieved a healthy take up rate of 96% to date. The
construction of substructure works at site was completed
while the main building works are in progress as scheduled.
Meanwhile, Phase 2 was later launched in February 2019 and
received an encouraging response.

Villa Heights – Phase 2
This is a continuation of its Villa Heights development which
is an exclusive guarded and gated residential project built on
the elevated grounds in the pristine area of Taman Equine.
Phase 2 which consists of 46 units of semi-detached
houses and 1 unit of bungalow was launched in May 2018
and achieved take up rate of 85% as of to date. Overall
construction work progress has reached approximately 70%
completion.

https://disclosure.bursamalaysia.com/FileAccess/apbursaweb/download?id=195491&name=EA_DS_ATTACHMENTS

Stock

2019-07-30 21:31 | Report Abuse

https://www.thestar.com.my/metro/metro-news/2019/07/23/optimistic-outlook-at-property-fair/#cxrecs_s

RM15 mil worth of COD condo sold. More to come given its nearing completion stage...

Stock

2019-07-01 21:32 | Report Abuse

https://malaysiastock.biz/Company-Announcement.aspx?id=1151849

KENANGA GROWTH FUND buying into this company with an accumulated 5.77% stake???

Stock

2019-06-27 23:40 | Report Abuse

http://malaysiastock.biz/Company-Announcement.aspx?id=1151760

Is this a prelude to a possible selective capital repayment to privatize this company?

Stock

2019-06-20 21:34 | Report Abuse

http://disclosure.bursamalaysia.com/FileAccess/apbursaweb/download?id=94967&name=EA_GA_ATTACHMENTS

Hohup can expect to receive RM266 mil within 12 months from the disposal of the Pavilion Bukit Jalil Mall by Malton.? (page 14 of the above hyper-link)

Stock

2019-06-20 16:49 | Report Abuse

Between Ekovest and Iwcity, the former should be a more ideal andf feasible vehicle to undertake the Bandar Malaysia development. It has the track record and financial means as well as the existing operating cash flow to raise financing to undertake the massive development. Bankers will likely prefer the former to be the vehicle to assume the financing obligations.....

Stock

2019-06-14 13:31 | Report Abuse

Overseas established developers are more than happy to grab this golden opportunity to buy over such a big plot of FLAT matured land located right next to the big City of Kuala Lumpur. Such opportunity in terms of its sheer size and prime location is not easy to come by even in any part of this world.

Stock

2019-05-12 10:51 | Report Abuse

Isola @ KLCC will start contirbuting positive results for OCR in the next few quarters as the project has finally reached the reinforced concrete framework stage whereby more profits can be recognized in the account.

https://www.ocrbhd.com/ocr-launches-rm240-million-gdv-isola-klcc-jalan-yap-kwan-seng/

https://klse.i3investor.com/blogs/Bursa_Master/205971.jsp