Johnchew5

Johnchew5 | Joined since 2019-08-18

Investing Experience -
Risk Profile -

Followers

10

Following

0

Blog Posts

0

Threads

11,780

Blogs

Threads

Portfolio

Follower

Following

Summary
Total comments
11,780
Past 30 days
110
Past 7 days
0
Today
0

User Comments
Stock

2023-10-17 07:08 |

Post removed.Why?

Stock

2023-10-17 07:05 |

Post removed.Why?

Stock

2023-10-17 06:04 |

Post removed.Why?

Stock

2023-10-17 05:54 |

Post removed.Why?

Stock

2023-10-17 05:49 | Report Abuse


Renewable Energy Sources

In 2020, hydropower produced 21 GW (30.3%) of total capacity. Under PDP8, total capacity would increase to 29.5 GW (19.5%) by 2030, and up to 36 GW (6.3%) by 2050. More ambitious targets for renewable sources, however, relate to wind and solar expansion. Wind accounted for just 0.54 GW (0.8%) of total capacity in 2020; PDP8 would scale this up to 27.88 GW (18.5%) by 2030, with 6 GW of offshore wind power by 2030. By 2050, the goal is to generate 70 GW from offshore wind alone. Vietnam also aims to install rooftop solar on half of all office buildings and homes by 2030, ultimately generating up to 189 GW by 2050. In a press release on May 16, 2023, the government stated "[f]rom now until 2025, there is no limit to the capacity of rooftop solar power development provided that the prices are reasonable and the existing transmission network is not overloaded."1

👉 Vietnam previously experienced a boom in solar development in 2019 and 2020, but much of the electricity could not be delivered to the grid without transmission and other capacity upgrades. PDP8's planned investments in transmission and distribution infrastructure could alleviate these issues and bolster Vietnam's transition to rely more heavily on renewable energy sources.

Next Steps
PDP8 envisages legal reforms to meet Vietnam's energy development goals. Specific measures to be led by the Ministry of Industry and Trade include amendments to the Electricity Law to account for electricity market regulation, including investment and electricity pricing policy, as well as the development of mechanisms for investment auctions, direct power purchase agreements and electricity price management. Further reforms to be expected include amendments to the Law on Economical and Efficient Use of Energy and the adoption of a Law on Renewable Energy. The Ministry of Industry and Trade is to submit a planning implementation plan to the Prime Minister in June 2023.

Stock

2023-10-17 05:44 | Report Abuse

Coal
Although PDP8 does not call for immediate reductions in Vietnam's reliance on coal, coal would become a smaller share of the total energy mix by 2030. In 2020, total capacity of coal-fired power plants was 21.38 GW (30.8%) of the energy mix. By 2030, Vietnam plans to increase this to 30.13 GW, but this would reduce its share to 20% of planned energy capacity.

After 2030, Vietnam would not develop any new coal-fired power plants, and active plants that are 20 years or older will begin transitioning to biomass or ammonia. Plants over 40 years old that cannot achieve this fuel switch will be retired.

Stock

2023-10-17 05:43 | Report Abuse

LNG and Natural Gas
In 2020, natural gas accounted for 9.03 GW (13.1% of Vietnam's total generation capacity) all of which was sourced from domestic gas. PDP8 calls for expanding LNG and natural gas capacity to 37.33 GW (24.8%) by 2030. The bulk of this expansion would come from LNG, which Vietnam does not currently utilize. PetroVietnam Gas recently completed construction of the country's first LNG importation terminal, with a capacity of one million tonnes per year, and has issued a tender seeking to purchase the country's first LNG cargo. PDP8 plans for development of 13 LNG-fired power plants by 2030, with the first scheduled to begin operating in late 2024.

Stock

2023-10-17 05:43 | Report Abuse

The plan will require a total investment of US$134.7 billion by 2030 to fund new generation facilities and grid upgrades, part of which will come from foreign investors. In December 2022, the Group of Seven nations pledged to provide Vietnam with US$15.5 billion to help end the country's reliance on coal-fired power plants, after offering similar incentives to South Africa and Indonesia. Vietnam's commitment to concrete energy transition goals in PDP8 may help unlock this investment by alleviating brewing uncertainties over the two-year delay to the plan's approval.


While PDP8 calls for a significant evolution of Vietnam's electricity grid and its entry into the offshore wind and LNG spaces, it does not call for an end of coal-fired generation by 2030, which could present risks for foreign-pledged investments intended to aid the transition away from coal power plants. Total generation capacity from coal power plants would increase from 2020 to 2030, but no new coal power plants would be developed after 2030, and existing plants would begin to transition to cleaner fuels, such as biomass or ammonia.


PDP8 provides specific targets for Vietnam's energy mix by 2030 but also set goals to help the country achieve carbon neutrality by 2050. Longer-term goals include the gradual phase-out of coal, increased reliance on natural gas, specifically LNG, and an expansion of renewable energy capacity from 30.9% of the country's energy mix in 2030 to 67.5% by 2050, primarily through investments in offshore wind and rooftop solar generation. The 2050 targets would require much more investment than the 2030 targets, with total cost estimates ranging from US$399 billion to US$523 billion.
A sector-by-sector breakdown of PDP8's generation-related targets is as follows:

Stock

2023-10-17 05:42 | Report Abuse

29 May 2023

Vietnam Approves Power Development Plan for Cleaner Fuels


Power Development Plan VIII ("PDP8") calls for expansions to renewable energy generation and development of LNG facilities to aid a gradual phase-out of coal-fired power plants. The plan will require US$134.7 billion in domestic and foreign investment by 2030 and lays a pathway for Vietnam to achieve carbon neutrality by 2050.



On May 15, 2023, after two years of consultation with public and private stakeholders and 12 draft plans, Prime Minister Pham Minh Chinh approved Vietnam's PDP8 as part of Vietnam's National Electricity Development Plan 2021 – 30. PDP8 calls for significant expansion of the country's electricity grid, more than doubling its capacity from 69 GW in 2020 to 150 GW by 2030, and set energy transition goals for achieving carbon neutrality by 2050. Much of the expansion is slated to come from investments in offshore wind facilities and LNG-supplied natural gas power plants.

Stock

2023-10-17 05:39 |

Post removed.Why?

Stock

2023-10-17 05:33 |

Post removed.Why?

Stock

2023-10-16 23:25 |

Post removed.Why?

Stock

2023-10-16 23:23 |

Post removed.Why?

Stock

2023-10-16 23:20 |

Post removed.Why?

Stock

2023-10-16 23:16 |

Post removed.Why?

Stock

2023-10-16 23:12 |

Post removed.Why?

Stock

2023-10-16 23:10 |

Post removed.Why?

Stock

2023-10-16 23:05 |

Post removed.Why?

Stock

2023-10-16 23:01 |

Post removed.Why?

Stock

2023-10-16 20:20 | Report Abuse

MA10 : 0.2095


1.) 1st hurdle BB 20 2 Mid : 0.2100 


2.) 2nd hurdle MA200 : 0.2132


3.) 3rd hurdle MA400 ( from 0.27 to 0.25 )


4.) 4th hurdle 52W H ……( from 0.34 to 0.305 )


VWAP : 0.213 CP : 0.215




MA10 : 0.2090


1.) 1st hurdle BB 20 2 Mid : 0.2110


2.) 2nd hurdle MA200 : 0.2122


3.) 3rd hurdle MA400 ( from 0.27 to 0.25 )


4.) 4th hurdle 52W H ……( from 0.34 to 0.305 )


VWAP : 0.215 CP : 0.210


—-



MA10 : 0.2095


1.) 1st hurdle BB 20 2 Mid : 0.2112


2.) 2nd hurdle MA200 : 0.2118


3.) 3rd hurdle MA400 ( from 0.27 to 0.25 )


4.) 4th hurdle 52W H ……( from 0.34 to 0.305 )


VWAP : 0.210 CP : 0.210


Observation : Consolidation period : MA200 is reducing …

Stock

2023-10-16 20:19 |

Post removed.Why?

Stock

2023-10-16 16:39 |

Post removed.Why?

Stock

2023-10-16 16:37 |

Post removed.Why?

Stock

2023-10-16 16:34 |

Post removed.Why?

Stock

2023-10-16 16:32 |

Post removed.Why?

Stock

2023-10-16 16:30 |

Post removed.Why?

Stock

2023-10-16 16:29 |

Post removed.Why?

Stock

2023-10-16 16:28 |

Post removed.Why?

Stock

2023-10-16 16:27 |

Post removed.Why?

Stock

2023-10-16 16:25 |

Post removed.Why?

Stock

2023-10-16 16:23 |

Post removed.Why?

Stock

2023-10-16 15:53 |

Post removed.Why?

Stock

2023-10-16 15:52 |

Post removed.Why?

Stock

2023-10-16 15:52 |

Post removed.Why?

Stock

2023-10-16 15:23 | Report Abuse

Total Net Short Positions :


Note : During 2021 .. EPF lent 20 million shares to Shortish…TopGlove utilised RM 1.42 Billion on SBB during 2021 ..


My TopGlove TP Rm3.40 posted on 4/12/2020 at TG price is RM 6.65 …JPM TopGlove TP RM 3.50 on ard 2 weeks later ..TG Price is Below RM 3.40 on September 2021 ..


👉 This round JPM TP RM 0.48 … see see look look Shl take How Long to hit the TP RM 0.48 !!😅😅😅



6/10 : 23,158,634 0.28 %

9/10 : 23,315,634 0.28 %

10/10 : 23,804,534 0.29 %

11/10 : 24,623,934 0.33 %

12/10 : 28,541,134 0.35 %

13/10 : 29,056,934 0.35 %

Stock

2023-10-16 15:23 | Report Abuse


【行家论股】顶级手套 料下财年转盈 


2023年10月13日 




分析:摩根大通 



目标价:48仙 



最新进展: 



顶级手套(TOPGLOV,7113,主板保健股)2023财年末季(截至8月底)核心净亏损,按季收窄21.92%,至8900万令吉,第3季亏损为1亿1400万令吉。 



公司亏损收窄,主要归功于生产成本减少,尤其是原料及能源成本,使得当季产品销量按季减少,也令公司亏损情况有所改善。但碍于回教债券年利息开销沉重,估计顶级手套最快需至2025财年才有望重新获利。 



行家建议: 



我们认为,如今买进手套行业需采取长远观点,并留意手套行业结构性变化。 




若中国业者同意减产或市场需求暴增,则可考虑增持手套领域,但上述两种情况皆不太可能出现。 



同时,平均售价是业者改善盈利的关键,但如今手套供过于求的情况,业者议价能力也相对有限,若轻易调升产品售价,可能导致客户流失。 



顶级手套此前便在5月尝试调升手套售价约10%,但却导致产品销售量按季滑落。 



不过,相信该公司已渡过最糟时期,唯盈利复苏料仍需一段漫长时间,估计顶级手套最快可在2025财年首季摆脱亏损,由此转亏为盈。 



整体而言,随着全球手套需求量骤减,预计顶级手套赚幅和盈利会继续承压。 



由于顶级手套的估值已经超越基本面,我们维持“减持”评级,但目标价从此前的45仙,上修至48仙。

Stock

2023-10-16 15:22 |

Post removed.Why?

Stock

2023-10-16 15:21 | Report Abuse


>>> 🐍sawa sweet talks promoted TG ( Price is dropped from RM 5.00 to below RM 0.60 )

Stock

2023-10-16 15:19 | Report Abuse


>>> 🐍sawa sweet talks promoted TG ( Price is dropped from RM 5.00 to below RM 0.60 )

Stock

2023-10-16 15:16 |

Post removed.Why?

Stock

2023-10-16 15:02 | Report Abuse

Total Net Short Positions :


Note : During 2021 .. EPF lent 20 million shares to Shortish…TopGlove utilised RM 1.42 Billion on SBB during 2021 ..


My TopGlove TP Rm3.40 posted on 4/12/2020 at TG price is RM 6.65 …JPM TopGlove TP RM 3.50 on ard 2 weeks later ..TG Price is Below RM 3.40 on September 2021 ..


👉 This round JPM TP RM 0.48 … see see look look Shl take How Long to hit the TP RM 0.48 !!😅😅😅



6/10 : 23,158,634 0.28 %

9/10 : 23,315,634 0.28 %

10/10 : 23,804,534 0.29 %

11/10 : 24,623,934 0.33 %

12/10 : 28,541,134 0.35 %

13/10 : 29,056,934 0.35 %

Stock

2023-10-16 15:01 | Report Abuse

【行家论股】顶级手套 料下财年转盈 


2023年10月13日 




分析:摩根大通 



目标价:48仙 



最新进展: 



顶级手套(TOPGLOV,7113,主板保健股)2023财年末季(截至8月底)核心净亏损,按季收窄21.92%,至8900万令吉,第3季亏损为1亿1400万令吉。 



公司亏损收窄,主要归功于生产成本减少,尤其是原料及能源成本,使得当季产品销量按季减少,也令公司亏损情况有所改善。但碍于回教债券年利息开销沉重,估计顶级手套最快需至2025财年才有望重新获利。 



行家建议: 



我们认为,如今买进手套行业需采取长远观点,并留意手套行业结构性变化。 




若中国业者同意减产或市场需求暴增,则可考虑增持手套领域,但上述两种情况皆不太可能出现。 



同时,平均售价是业者改善盈利的关键,但如今手套供过于求的情况,业者议价能力也相对有限,若轻易调升产品售价,可能导致客户流失。 



顶级手套此前便在5月尝试调升手套售价约10%,但却导致产品销售量按季滑落。 



不过,相信该公司已渡过最糟时期,唯盈利复苏料仍需一段漫长时间,估计顶级手套最快可在2025财年首季摆脱亏损,由此转亏为盈。 



整体而言,随着全球手套需求量骤减,预计顶级手套赚幅和盈利会继续承压。 



由于顶级手套的估值已经超越基本面,我们维持“减持”评级,但目标价从此前的45仙,上修至48仙。

Stock

2023-10-16 14:59 |

Post removed.Why?

Stock

2023-10-16 14:57 |

Post removed.Why?

Stock

2023-10-16 14:56 |

Post removed.Why?

Stock

2023-10-16 14:53 |

Post removed.Why?

Stock

2023-10-16 14:53 |

Post removed.Why?

Stock

2023-10-16 14:51 |

Post removed.Why?

Stock

2023-10-16 11:41 |

Post removed.Why?

Stock

2023-10-16 11:37 |

Post removed.Why?