Followers
0
Following
0
Blog Posts
0
Threads
833
Blogs
Threads
Portfolio
Follower
Following
1 month ago | Report Abuse
Federal Court: the dispute over the supposed completion date is not the core issue in the case, but rather whether the building was actually completed and delivered.
1 month ago | Report Abuse
JTiasa rm20? calvin it is possible. My Bkwan was bought at rm4
1 month ago | Report Abuse
rocket already and now talk. Calvin recommended at 0.68
1 month ago | Report Abuse
calvin and sslee are great. But we also see some court jesters in here as well
2 months ago | Report Abuse
Beruas to Taiping South stretch of the West Coast Expressway to open soonhttps://www.malaymail.com/news/malaysia/2024/02/06/beruas-to-taiping-south-stretch-of-the-west-coast-expressway-to-open-soon/116568
2023-11-29 05:44 | Report Abuse
Thanks calvintaneng for your take
2023-11-29 05:40 | Report Abuse
Good results JTiasa.
10sens jump today?
2023-11-28 16:34 | Report Abuse
will be when strong qtr results are out
2023-09-15 14:14 | Report Abuse
all higher than july 2023.Great
2023-09-01 10:12 | Report Abuse
already making profit. Div on the way too
2023-08-25 07:32 | Report Abuse
Good performance,pare down debts and declare dividens
2023-08-15 13:47 | Report Abuse
June Ffb was 84,700 mt
july Ffb is 110,00 mt
great just great
2023-08-04 05:34 | Report Abuse
2b debt pared down. Jt started paying div
2023-08-01 08:43 | Report Abuse
very good mth production figures reported
2023-07-27 09:35 | Report Abuse
Jaks is an independent BOT. It has a separate PPA
2023-07-27 09:33 | Report Abuse
If one cannot understand the word EXCEPT he or she must been sleeping in school
2023-07-27 09:32 | Report Abuse
The circular does NOT applies to multi-target strategic hydroelectric plants, independent BOT power plants and power plants using renewable energy (wind, geothermy, tides and biomass);
2023-07-27 09:31 | Report Abuse
This Circular applies to the following entities:
a) Generating units that own power plants connected with the national electricity system with total nominal capacity over 30MW, power plants with nominal capacity from 30MW and under volunteer to join electricity market
2023-07-27 09:31 | Report Abuse
No.: 56/2014/TT-BCT
Hanoi, December 19, 2014
1. This Circular regulates:
a) Method of determination of electricity generation costs and specimen PPA applied to entities as prescribed in Clause 2 of this Article;
b) Sequence of inspection of PPA
2. This Circular applies to the following entities:
a) Generating units that own power plants connected with the national electricity system with total nominal capacity over 30MW, power plants with nominal capacity from 30MW and under volunteer to join electricity market except multi-target strategic hydroelectric plants, independent BOT power plants and power plants using renewable energy (wind, geothermy, tides and biomass);
Other power plants without a separate mechanism prescribed by the Ministry of Industry and Trade shall follow this Circular.
b) Other relevant organizations, individuals
2023-03-06 07:37 | Report Abuse
Rm 1 should be no problem, lol
2023-03-05 17:00 | Report Abuse
Welcome all critics turned cheer ppl. Watch for the golden cross
2023-02-23 05:26 | Report Abuse
Yeah, still early days. Gold just touched crossing.
2023-02-17 15:08 | Report Abuse
watch for the golden cross crossing.
2023-02-14 05:58 | Report Abuse
DRP, why reinvestment if no incoming dividend?
Small fish just stay away.
Those in the net what are your thoughts?
Stock: [JTIASA]: JAYA TIASA HOLDINGS BHD
2 weeks ago | Report Abuse
only genine chain blocking the bull