Followers
0
Following
0
Blog Posts
0
Threads
558
Blogs
Threads
Portfolio
Follower
Following
2018-12-27 15:04 | Report Abuse
just buy popcorn and wait to watch movie
2018-12-25 11:14 | Report Abuse
invest by your own choice, no people pointed to your head.. think twice
2018-12-24 12:55 | Report Abuse
collected... time to buy popcorn and watch movie
2018-12-14 20:27 | Report Abuse
wonder why didn't slapped UMA by bursa.. been dropping like sky jumping
2018-12-07 09:12 | Report Abuse
one of it.. sell at low price but buy back with more volume and higher price.. hmm....
2018-12-06 15:06 | Report Abuse
at that time tp for renevue only 0.6 or 0.68 only..
2018-12-06 15:01 | Report Abuse
look at renevue la. ipo price at 0.33 only
2018-11-29 15:13 | Report Abuse
thanks for the panic seller. or else also won't have the chance to collect at such low price..
thanks all
2018-11-19 13:31 | Report Abuse
is matter of time back to rm2.. another dufu in progress
2018-11-09 15:32 | Report Abuse
when is the x date for free warrants?
2018-10-08 11:10 | Report Abuse
thanks for the chance to collect again
2018-10-05 16:24 | Report Abuse
big volume been accumulated.. wonder who is that.. hmmm
2018-10-05 13:15 | Report Abuse
opec is closing the gap with Brent.. really strange.. my observation, Brent normally will higher 3-4 usd. expecting Brent will trading at range of 87
2018-09-28 23:15 | Report Abuse
aiks.. surprisingly Dow Jones green green.. thought someone say not do well tonite?
2018-09-28 22:22 | Report Abuse
Supply disruptions and the lag time associated with OPEC’s ability to increase production could send oil prices to $100 a barrel, but this isn’t good news for the economy and the oil industry, Total’s chief executive Patrick Pouyanne told Bloomberg in an interview.
Disruptions in supply coming from Iran, Venezuela, and Libya give strong support to oil prices and they may head into triple-digit territory, according to Pouyanne, who reminded Bloomberg television that he predicted this development as early as in June this year.
On the other hand, although OPEC has pledged to boost production, output hasn’t increased so much, Pouyanne told Bloomberg.
Saudi Arabia has capacity of 11 million bpd, but boosting production from current levels would need time, because they have to mobilize rigs.
“You don’t push a button and then oil flows. It’s more complex than that,” Pouyanne said.
Total’s chief executive believes that $100 oil is a real possibility, but he is not especially thrilled with it.
2018-09-28 21:49 | Report Abuse
haha. there comes along the jokers..
2018-09-28 18:50 | Report Abuse
hot news !!
KUALA LUMPUR (Sept 28): Reach Energy Bhd's producing asset in Kazakhstan, Emir-Oil LLP, has obtained authority approval to commence the trial production period of the North Kariman field in Kazakhstan for 15 months.
In a filing with Bursa Malaysia today, Reach Energy said the 15-month trial production period will commence on Oct 1, 2018 to Dec 31, 2019.
The approval granted for the trial production period allows Emir-Oil to put the North Kariman wells on production, and this is expected to increase current oil production levels substantially.
Reach Energy said the approval of the trial production period for the North Kariman field provides a clear signal from the authority for the company to proceed with the processes required to obtain a new production contract for the field.
In its 2017 annual report, Reach Energy had stated that it had applied for extension of trial production for the North Kariman wells to the Ministry of Energy of Kazakhstan.
At 5pm today, Reach Energy shares closed unchanged at 44 sen, for a market capitalisation of RM562 million.
2018-09-28 09:16 | Report Abuse
strange.. for the first time opec price higher than Brent.. looks like something big going to happen soon..
2018-09-15 16:58 | Report Abuse
don't forget oil reserve for reach is much more compare with hibiscus.. that's the most interesting for me.. don't think they can't secure any investors
2018-09-15 09:31 | Report Abuse
hahaha.. can't taste the sweet then start nagging like small kids
2018-09-10 20:52 | Report Abuse
cz he not able to collect at low price.. so once he say crash and those people follow to sell. then he will only have the chance to buy
2018-09-05 08:20 | Report Abuse
dont expect too much.. maybe 0.1 ok?
2018-08-31 22:40 | Report Abuse
what so worried.. don't really understand.. Cati profit from those contra kaki.. just wait it shot up till hibiscus level.. have a check probably the oil reserve is much more compare with hibiscus
2018-08-31 22:38 | Report Abuse
super coverage from public bank.. but hibiscus worth that price.. just wait for it.. have faith
2018-08-29 16:33 | Report Abuse
wondering who is collecting now... hmm !!!
2018-08-29 12:19 | Report Abuse
only fool will follow those kinds of "guru statement"
2018-08-24 17:04 | Report Abuse
think la before post.. how to compare with sapura and hsseb.. one is operation and another one is engineering design and solution company.
2018-08-22 22:03 | Report Abuse
over reacted.. those so called analyst really know how to take this chances to bring down the price and buy at oow price.. bravo
2018-08-22 20:10 | Report Abuse
http://www.hssgroup.com.my/railway-2/
maybe this will answer every single doubt for ECRL project. HSSEB only involving on feasibility study !!!
2018-08-22 20:06 | Report Abuse
Normally if want to complete a project, few stages involves.
1. engineering studies and design
2. parts supplier
3. constructor company, person who actually construct the project.
based on my understanding, HSSEB is engineering company which provides engineering services and project management consultancy not a constructor. Looks back on the project timeline for HSR, they are expecting to construct on 2018 onwards and engineering studies been done since 2016.
same goes to ECRL. and construction began in August 2017. which means they already complete the engineering design and studies.
may refer to their webpage. check through what is the scope of work for the pass. NEVER EVER as a CONSTRUCTOR.
http://www.hssgroup.com.my/overseas/
don't really understand why people will say HSSEB will have major impact on it.
2018-08-22 12:39 | Report Abuse
this company not totally depending with this ecrl project. still have others project which already on going.. can say that you can't really find any company able to provide such engineering support in the markets
2018-08-22 08:26 | Report Abuse
talk like pro.. haha.. have a check probably on press been done by mahathir.. project will be defer and it is not cancel.. or find method to reduce the cost
Stock: [AAX]: AIRASIA X BERHAD
2019-01-03 21:40 | Report Abuse
everyone can fly with aax now