Followers
4
Following
0
Blog Posts
0
Threads
1,134
Blogs
Threads
Portfolio
Follower
Following
2020-05-15 09:01 | Report Abuse
多谢Shan Kee tiow 和 dk66大师无私的分享。有大师在这里就不怕菜鸟们被人误导。所以别放弃,请继续在这里分享。
2020-05-14 21:43 | Report Abuse
Many thnaks to Shan Kee Tiow and Sifu DK66 for the clarification
2020-05-14 21:41 | Report Abuse
做么有些人酱喜欢误导人?真的吃饱没事做?还是心理变态?有病记得看医生,没钱看医生可以去天桥底讲故,听众都不少的。
真的好过在这里废话连篇,误导人
2020-05-14 09:49 | Report Abuse
MFCB already raise beyond RM5. No way Jaks still hanging at RM1.
2020-05-14 09:21 | Report Abuse
After nearly 10 years of construction, until now, BOT Hai Duong Thermal Power Plant in Quang Thanh Commune (Kinh Mon Town) has basically been completed and ready to go into operation.
It is expected that each year the plant will provide 7.5 billion kWh of electricity to the national grid.
Mid-year will operate commercially
From the May ferry, down Road 389 to Quang Thanh Commune, you will see the vast green fields, the BOT Hai Duong Thermal Power Plant exists. The deeper you go inside, the more bustling and urgent the atmosphere. Cars carrying raw materials consecutively enter and exit.
In the main factory area, officials and workers are busy installing equipment. Mr. Vu Anh Quy, engineer of the Construction Division said: "The workers as well as the staff work day and night to ensure the progress. Being aware of the importance of the work, everyone is determined."
Taking us around the factory, Mr. Do Manh Hung, Head of Government Relations and Business Development Department of Jaks Hai Duong Power Company, the investor, excitedly said: "Come Now, the project has completed 90% of the total workload.
Expected in the period from 7-15.3.2020, unit No. 1 will join the grid for the first time; from 1-15.4.2020 will test reliability and in the period from May 15 - 15.6.2020 will operate commercially. At that time, the current of the Hai Duong BOT Thermal Power Plant will officially enter the national grid. Unit 2 will operate after unit 1 about 6 months ".
In addition to the 2 units, the company also speeds up the implementation of auxiliary items and works. Until now, the boiler startup area has been completed, the oil tank and fuel pump houses are almost done, the pipeline on the synthetic pipe rack also reaches 88% of the volume, the wharf is ready ...
Northern Coal Trading Joint Stock Company surveyed and expected to supply the plant 80,000 tons of coal in the near future. The storage area and the conveyor belts are basically finished. One of the issues that people and industries concerned about when the factory comes into operation is environmental issues. The investor has installed electrostatic dust collection system, dust is filtered and controlled. The wastewater treatment system is basically completed.
To be able to connect to the national grid, Jack Hai Duong Power Co., Ltd. has built an electricity distribution area of 110 kV, 220 kV and will be handed over to North East Power Transmission 2 (Northern Power Corporation). ) operational management.
Mr. Pham Van Huynh, Deputy Director of Dong Bac 2 Power Transmission said: "We have received documents related to the 110kV and 220 kV power distribution systems of BOT Hai Duong Thermal Power Plant and are training. human resources to be able to operate immediately when the factory is officially put into operation ".
Hard to find investment sources
From 2009, Malaysia's Jaks Pacific Power Ltd began exploring the construction of a thermal power plant in Hai Duong. In June 2011, the Ministry of Planning and Investment granted an investment certificate to this enterprise for implementation of the Hai Duong BOT Thermal Power Plant Project. The investor has established Jaks Hai Duong Power Company Limited to carry out the project. The plant is designed with 2 units with a capacity of 600 MW each, expected annual electricity output of 7.5 billion kWh. The factory has a total investment of about 2.2 billion USD, built on an area of nearly 200 hectares in Quang Thanh commune.
Due to the large foreign direct investment, the project is expected to create a driving force for the province's socio-economic development. Therefore, when the investor started to implement, all levels and branches of the province created favorable conditions for the project implementation. However, the project is still behind schedule due to financial difficulties. Jaks Pacific Power Ltd, Jaks Pacific Power Ltd., has limited business potential, so it has repeatedly sought partners but all failed. Eventually the company found a partner, China Energy Construction Corporation (CPECC).
In addition to finance, the company also faces difficulties in site clearance when the investment process has not yet paid the land use fee, must extend and amend the land lease contract, the people have not agreed on the compensation plan .. "With the efforts of the company and the support of central and Hai Duong agencies, departments and agencies, the difficulties in the implementation of the project have been overcome. We have mobilized the whole. human and material resources race with the time to complete the project in the fastest conditions possible to soon join the national power grid, "Mr. Hung added.
2020-05-12 09:26 | Report Abuse
0.025sen become 0.625sen. 25 lots become 1 lot. More room for shark to throw.
2020-05-07 15:54 | Report Abuse
Non stop DRP! Normally share price wouldn't go beyond DRP issue price!
2020-05-07 15:24 | Report Abuse
3sen dividend! very disappointed!
rubbish stock. OPR cut again! No future for this stock!
2020-05-05 14:27 | Report Abuse
Why need to raise right issue? Jaks going to become cashrich once powerplant start commercial operation.
2020-05-02 11:32 | Report Abuse
Why so many monkeys came over here to created fear?What are their intentions?
2020-05-01 13:53 | Report Abuse
Icon8888, what is your TP by end of this year?
2020-04-30 14:58 | Report Abuse
Most of the countes flies. Why Jaks left behind!
2020-04-30 10:44 | Report Abuse
even oil company like hibiscus, dayang also can perform. no way Jaks still left behind. Hope Jaks can break RM1.10 by end of today.
2020-04-30 10:42 | Report Abuse
Ok. I choice to stay with sifu dk66 regardless of otb sellcall or buycall
2020-04-30 10:32 | Report Abuse
otb sell call Vs icon8888 buy call
which one to follow?
2020-04-30 10:16 | Report Abuse
tomorrow holiday + weekend. Anything can happen. otb negative comments make me uncomfortable
2020-04-30 10:09 | Report Abuse
Last time kyy sell call price gone down to 40sen. This round otb sell call, guessing how north the price can go?
2020-04-30 10:00 | Report Abuse
otb sell call? Good or bad news? Why like roti canai, sometime buycall sometime sell call
2020-04-29 13:30 | Report Abuse
RM2 by end of 2020.
RM4 by mid of 2021.
100% return by end of 2020
300% return by mid of 2021
2020-04-29 11:42 | Report Abuse
Big sharks are collecting. Just be patient to wait for the ride. Unit 1 start commercial generate electricity by June. Better join now before the rally start. Share prices always run ahead of 6 months.
2020-04-27 15:41 | Report Abuse
Just let it bankrupt. nevermind. Jaks business core business is power plant. loss
2020-04-27 13:13 | Report Abuse
很明显庄家在收票,不急。等收够了就会fly to the sky.
2020-04-26 20:19 | Report Abuse
TP RM2 by end of 2020
TP RM4 by 2021
2020-04-23 22:21 | Report Abuse
Getting close to first unit commercial operation. Good
2020-04-22 15:26 | Report Abuse
Price up. Monkeys suddenly disappeared. Why?
2020-04-22 11:59 | Report Abuse
TP by 2020 RM2
TP by 2021 RM4
Unit 1 start commercial generate electricity by June 2020.with or without covid power plant still running.
2020-04-22 11:37 | Report Abuse
U should ask kyy's wife. Probably his wife has the best answers to answer your question
2020-04-22 11:30 | Report Abuse
because genius never answers to stupid question.
2020-04-22 10:40 | Report Abuse
with or without covid. power business still running. Thats why I buy Jaks.
2020-04-22 09:35 | Report Abuse
Indeed, factory need electricity to run their business too. Buy Jaks with no regrets.
2020-04-22 09:15 | Report Abuse
Hai Duong Unit 1 start to generate electricity by June
2020-04-21 14:00 | Report Abuse
the only business wouldn't affected by covid 19 is power plant. with or without covid, power plant still running.
2020-04-21 11:39 | Report Abuse
Yes. U better wait till it drop to 62sen. By the way, I just add somemore at 99.5sen
2020-04-21 10:41 | Report Abuse
MSM no hope. Just buy Jaks la if u want to win big.
2020-04-17 10:39 | Report Abuse
I still remember one 仙家懒 ask us to hold until it drop to 40sen. Where is this 仙家懒?Luckily I manage to buy warrant average 50sen, will hold until it reach my 1st TP RM1.20.
2020-04-15 22:50 | Report Abuse
Market expected bad result next Qr. So the worse already over.
2020-04-13 10:18 | Report Abuse
Investors buy Jaks because of it Vietnam Power Plant. No it local business. Just ignore the local business la. Why so difficult to understand?
Blog: Jaks Resources - A Private Discussion Room
2020-05-17 22:22 | Report Abuse
dk66 master pls count me in too.