2023-09-01 12:52 | Report Abuse
Jaks
28/8 Mon. 0.200 16,963,500 . VWAP 0.196
T+ 1 = 1,840,500 . ( T + 0 = 15,267,000 )
==
29/8/2023 Tues :
Jaks
12.30 pm : 0.195 VWAP 0.195 Volume : 18,479,600
5.20 pm : 0.195 VWAP 0.195
Volume : 22,763,700
==
30/8/2023. Wed
12.30 pm : 0.200 VWAP 0.201 Volume : 12,087,800
5.30 pm : 0.200 VWAP 0.201
Volume : 16,420,800
===
1/9/2023 . Fri
12.30 pm : 0.225 VWAP : 0.218
Volume : 109, 046,500
2023-09-01 11:15 | Report Abuse
Ho ho ho KLCI pun looking Good .. cheers …
2023-09-01 11:04 | Report Abuse
The facilities will fund the development of a 50 MW fourth large-scale solar (LSS4) photovoltaic plant in Seberang Perai Selatan, in the state of Penang in Malaysia in addition to financing working capital requirements.
While JAKS Resources’s principal activity is the construction of power plants, JAKS Solar was incorporated specifically to undertake the development of the LSS4 photovoltaic plant in Penang.
The underlying asset for the multilateral facility is the solar plant which is inherently a sustainable power generation facility.
The Islamic facilities in the multilateral financing comprise a Murabahah Tawaruq term financing facility worth RM80 million (US$18.84 million), two bank guarantees worth RM27.5 million (US$6.48 million) combined and a Murabahah Tawaruq cash line facility worth RM5 million (US$1.18 million).
The bank guarantees consist of a RM10 million (US$2.35 million) facility with a complementary term financing facility with a limit of up to RM10 million and a second bank guarantee of RM17.5 million (US$4.12 million) with a Murabahah Tawarruq complementary term financing facility with a limit of up to RM17.5 million.
According to Ng Kit Ho, the senior vice-president of loan markets and debt markets 1 at AmInvestment Bank, the primary challenge faced by the bank in executing the financing facility was the time constraint.
“The time between execution of the power purchase agreement and financials was extremely tight (four months) and was over the festive period,” Ng told ISFI.
According to Albar & Partners, which acted as the legal counsel on behalf of the financiers in this multilateral financing facility, the guarantees required in the facility also posed a challenge.
“Tenaga Nasional, as the off-taker of the power project, would only accept one single performance guarantee for the performance of the borrower under this power project, therefore AmBank Islamic and UOB were required to enter into a fronting arrangement for AmBank Islamic to issue a bank guarantee to UOB as a fronting guarantor, who shall then issue its own conventional bank guarantee to TNB as the performance bond of the power project on behalf of the borrower,” the law firm shared.
While sustainability-linked financing is steadily increasing in popularity as a financing cost-saving mechanism, Ng shared that JAKS Solar had considered sustainability-linked financing but ultimately decided against it.
2023-09-01 08:00 | Report Abuse
Capital A公司 末季有望转盈
Nanyang Wed, Aug 30, 2023 05:51pm - 7 hours
分析:马银行投行研究
目标价:1.01令吉
最新进展:
Capital A公司(CAPITALA,5099,主板消费股)次季扭亏为盈,大赚11亿1828万1000令吉,去年同期净亏9亿3122万4000令吉。
次季营收报31亿5113万1000令吉,按年增115.03%。
Capital A次季净利大增至11亿令吉,主要由重新计量泰国亚航带来的14亿令吉收益。泰国亚航先前是联号公司,如今为子公司。
次季核心亏损报1亿828万令吉,首半年亏损报4亿695万令吉,亏损收窄幅度比预期好,我们预计,第三季将达至收支平衡,末季才可实现盈利。
另外,我们注意到,每名乘客配套营收上扬至49令吉,高于预测。次季营收向来疲软,每名乘客配套营收按季对比,也仅下滑2%,表示短途航班需求依然坚挺。
我们也同意该公司观点,季节性需求增加,第三季与末季的客运量和票价也会持续上升。
我们将今年每名乘客配套营收分别上扬至49令吉、明后财年也上扬至47令吉;调整后,我们将今财年的核心亏损预测收窄35%,此外,明后财年净利预测分别上修38%与28%。
>> 目前,公司股东收益金超过4000万令吉,且连续4季持续盈利,我们相信将很快脱离PN17。目标价从90仙上修至1.01令吉,但评级
2023-09-01 02:57 | Report Abuse
NEW ISSUE OF SECURITIES (CHAPTER 6 OF LISTING REQUIREMENTS) : FUND RAISING JAKS RESOURCES BERHAD ("JAKS" OR THE "COMPANY") PRIVATE PLACEMENT OF UP TO 10% OF THE TOTAL NUMBER OF ISSUED SHARES OF JAKS ("PRIVATE PLACEMENT")
We refer to the previous announcements and the circular to shareholders dated 10 February 2023 in relation to the Private Placement (“Circular”). Unless otherwise defined, the definitions set out in the Circular shall apply herein.
On behalf of the Board, UOBKH, being the joint placement agent, wishes to announce that the Board has resolved to fix the issue price for the Private Placement at RM0.18 per Placement Share.
The issue price of RM0.18 represents a discount of RM0.0188 or approximately 9.46% to the 5-day VWAP of JAKS Shares up to and including 29 August 2023, being the market day immediately preceding the price-fixing date of RM0.1988 per JAKS Share.
This announcement is dated 30 August 2023.
2023-09-01 02:52 | Report Abuse
Jaks
Referred to FY23 , 1 QR ended March 2023 :
Other Operating, Administrative Expenses :
( RM 14,875,000 ) / quarter
👉Referred to FY23 , 2QR ended June 2023 :
Other Operating, Administrative Expenses :
( RM 13,077,000 ) / quarter
2023-09-01 01:50 | Report Abuse
Jaks non current asset
Refer QR ended March 2023 :
Non Current Assets :
PPE. 273,041,000
Investment Properties 594,321,000
Investment in Joint Venture. 829,105,000
—
Refer QR ended June 2023 :
Non Current Assets :
PPE. 278,626,000
Investment Properties 590,929,000
Investment in Joint Venture. 861,417,000
===
Note : Compared 2QR to 1QR >>
A) PPE : increased RM 5,585,000 👍
B) Investment Properties : Decreased RM 3,392,000 👍
C) Investment in Joint Venture. : Increased RM 32,312,000 👍
2023-09-01 01:43 | Report Abuse
>> JAKS Power has intention to participate and will engage in comprehensive cooperation with the project sponsor, ZC Energy on a solar photovoltaic project with an installed capacity of 63.3MW, located around Grosseto and Firenzuola in Tuscany, Italy (“Project”).
2. BACKGROUND INFORMATION ON ZC ENERGY
ZC Energy, is a company incorporated in Germany in 2023 and having its principal office at Hans-
Weigel Str. 18a, 04319 Leipzig, German. The principal activities of ZC Energy are as follows:-
>> (i) Development and investment in renewable energy such as solar energy, wind energy, hydrogen energy green methanol, synthetic ammonia, etc.;
(ii) Trade in renewable energy products such as solar panels, inverters, storage systems, batteries etc.; and
(iii) Operation and management of photovoltaic systems, wind turbines, hydrogen systems and storage systems.
>>> ZC Energy is owned by two Chinese nationals, namely Mr. Ji Jian and Mr. Wang Xue Jun, each holding 50% of the shares and the Managing Director is Mr. Ji Jian.
It is a company specifically established for Italian projects and is the project sponsor of the current project in Tuscany. Mr. Wang Xue Jun also owns BaySolar AG and Bay Energy Group which has previously developed similar solar projects in Europe ranging from 7.4MW to 163MW.