10 people like this.

22 comment(s). Last comment by DK66 2020-02-28 22:06

5354_

4,793 posts

Posted by 5354_ > 2020-02-28 00:00 | Report Abuse

ESOS RM 1.4 why not exercised when TP RM 5?

probability

14,496 posts

Posted by probability > 2020-02-28 00:03 | Report Abuse

To all Jaks shareholders, see what was MFCB's earnings and cash flow for qtr Sept 19 which was announced on 18th Nov and the price it was trading then.

Also, see how market reacted on 19 Nov. Do not allow opportunist to buy from you cheap.

DJ can collapse, coronavirus can become a pandemic, malaysian politics and country economy can go down the drain...

But nothing can stop the Vietnam power plant from generating power.
...........................................................

...that's REAL and for bloody 25 years.

gemfinder

6,880 posts

Posted by gemfinder > 2020-02-28 05:01 | Report Abuse

Cakap apa pun x guna. Contra kakis wil rush to the exit door

GooShem

1,330 posts

Posted by GooShem > 2020-02-28 05:02 | Report Abuse

wow. dow Jones drop 1.1k....

HawkEyes

92 posts

Posted by HawkEyes > 2020-02-28 08:29 | Report Abuse

After look in deep on Jaks Q419 quarter result, this quarter result is better than I expected. In fact suppose there are 44 Mils net profit report in this quarter if take out all one off impairments. It means that coming quarter result is getting better and better after deduct one off impairments in this quarter. Jaks prospect is excellent.

HawkEyes

92 posts

Posted by HawkEyes > 2020-02-28 08:33 | Report Abuse

If base on 44 Mils this quarter result, the forward PE is just 905/(44*4)=5.14. The most important thing is Jaks future prospect is excellent.

VincentTang

1,228 posts

Posted by VincentTang > 2020-02-28 08:48 | Report Abuse

Dow Jones future rebound sharply now.

bankrupt

85 posts

Posted by bankrupt > 2020-02-28 11:39 | Report Abuse

1.2 not 5.

kalteh

99 posts

Posted by kalteh > 2020-02-28 15:40 | Report Abuse

Thanks a bunch in explaining why Jaks shareholders reports a profit when in total, there is lost. Very much appreciated.

DK66

4,269 posts

Posted by DK66 > 2020-02-28 15:55 | Report Abuse

kalteh, You are welcome. I m glad that you have a new knowledge.

newbie8080

2,767 posts

Posted by newbie8080 > 2020-02-28 17:01 | Report Abuse

Can see everyone is quite focus on the current quarter results.
I think the power plant results from the new income stream would superceed the property biz once the power plant is fully commission and running at its optimal capacity.
This power plant should generate income more stable than MFCB as MFCB will encounter dry season.
Besides, we know Vietnam is another manufacturing power house after China and needs stable source of energy.
Additionally, due to the trade war between China and US, many manufacturers had diverted their plants over to Vietnam.
Note: Most info can be found on CNN, CNBC, etc

probability

14,496 posts

Posted by probability > 2020-02-28 19:01 | Report Abuse

Adding more than 4300 MW to electricity sources in 2020

28/02/2020

http://baochinhphu.vn/doanh-nghiep/bo-sung-hon-4300-mw-vao-nguon-dien-trong-nam-2020/388637.vgp

In 2020, it is expected that the total capacity of the new power source will be put into operation at only 4,329 MW while the special load growth rate in the peak months of the dry season will require a lot of effort. There is a big demand for electricity in meeting the electricity demand for socio-economic development and production and daily life of people.

According to the prediction of Vietnam Electricity (EVN), in 2020, the electricity production of the whole system will be 261.456 billion kWh, an increase of 8.97%, of which, electricity production and purchase of EVN is 251 , 6 billion kWh; maximum capacity (Pmax) reached 41,237MW, an increase of 7.81% compared to 2019.

EVN said that, based on the calculation of electricity supply - demand in 2020, it is the task of ensuring electricity supply, ensuring power supply. the 2020 dry season will face many difficulties and challenges, especially in the context of unfavorable weather.

Compared with the approved electricity system operation plan, there are some concerns, such as: the expected hydroelectricity output is lower than 2.67 billion kWh due to the water flow to the hydroelectric reservoirs. 65% lower than frequency; gas output for electricity generation continues to decrease; The electricity generated from gas sources is expected to be 408 million kWh lower than planned.

Meanwhile, the total new power capacity expected to come into operation in 2020 is only 4,329 MW, including: Hai Duong BOT Thermal Power 1,200 MW; 1,138 MW hydroelectricity; wind power of 118 MW; solar power 1,873 MW. Coal and gas thermal power sources will have to mobilize maximum continuously in the dry season as well as the whole year 2020, no more provisions.

Therefore, the electricity system has many potential risks of not ensuring electricity supply in case of risks of fuel source.
To ensure adequate supply of electricity for socio-economic development, in addition to sources mobilized from hydroelectricity, coal-fired thermal power, gas, renewable energy, ... the electricity industry is expected to mobilize up to 3,397 billion kWh from power sources. It is expected to mobilize about 3,153 billion kWh of oil-fired thermal power sources in the dry season (from March to June) in the dry season.

In fact, EVN had to mobilize oil thermoelectricity right in January to regulate and keep hydropower plants to ensure adequate supply of electricity for the load demand. EVN is also expected to increase mobilization from coal-fired thermal power sources of 1.9 billion kWh, mainly from new coal-fired thermal power plants (thermal power plants) and those currently undergoing pilot operation. Combustion is also an important component, the percentage of participation in the source structure is about 13% in capacity and 18% in output.

To overcome these difficulties, EVN has directed its member units to concentrate on ensuring electricity supply for six months of the dry season 2020, without leaving electricity shortages in all situations. To ensure the progress of investment in power source and grid projects on schedule, with priority given to projects completed in the first six months of 2020, especially key projects supplying electricity to the South, TP Hanoi and other important loads.

Take the initiative in reviewing the situation of investment in power grid projects according to the planning and annual plans to make adjustments suitable to actual needs, meeting the needs of new power transmission and power supply of investors. from.Focusing on directing the National Load Dispatch Center to regularly update input parameters such as additional charge, hydrology, fuel supply, source schedule, ..., calculating the balance between electricity supply and demand to promptly report to the Group. At the same time, optimally operating the electricity system, getting ready for power supply plans and handling options when incidents occur; rational arrangement for maintenance of units in 2020.

Accordingly, EVN has assigned plans for thermal power plants (thermal power plants) on a monthly basis and for the whole 2020 to enable units to proactively prepare operation plans. and prepare the fuel. At the same time, it is required that the thermal power plants must ensure the dry season output (the number of hours of operation is more than 4,000 hours) and the annual output (the number of hours of operation is more than 7,200 hours).

probability

14,496 posts

Posted by probability > 2020-02-28 19:01 | Report Abuse

Key takeaway from above article:
................................

Hai Duong is major contributor for 2020 - 28% of the inadequate supply needed by EVN and they ere expecting minimum 7200 hrs operation.

probability

14,496 posts

Posted by probability > 2020-02-28 19:04 | Report Abuse

also:
.....

It is required that the thermal power plants must ensure the dry season output (the number of hours of operation is more than 4,000 hours)

DK66

4,269 posts

Posted by DK66 > 2020-02-28 19:07 | Report Abuse

Probability, thanks for the info

probability

14,496 posts

Posted by probability > 2020-02-28 19:08 | Report Abuse

Important extract from DK66's article:
...............

What would be the profit attributable to ordinary equity holders of the parent (Jaks) if the one off impairments were taken out?

It would be RM44m (18m + 11m + 30m/2) in Q4 2019

RM44m
.....

kalteh

99 posts

Posted by kalteh > 2020-02-28 21:08 | Report Abuse

DK66, may I know how can you derive the losses after tax for non-controlling interest of 32m for this quarter?
As you stated, NCI accounts for 49% of the losses in property segment which is 29m before tax. How does that figure goes to loss of 32m after tax?

DK66

4,269 posts

Posted by DK66 > 2020-02-28 21:35 | Report Abuse

Kalteh, it is good that you spotted the abnormally. It get complicated to explain. I was only using 49% as a general guideline as Jaks owns 51% of its major property arm, island circle development. However, do note that Jaks had a few dealings with its subsidiary where Jaks purchased car parks, residential and commercial units from its subsidiary at below book value. These transactions resulted in losses incurred at subsidiary level but no effect on group level. Thus, the share of losses by non controlling interests is actually greater than 49%.

Apart from property losses, there are investment holdings and share plan expenses as well as taxation with non controlling interests.

kalteh

99 posts

Posted by kalteh > 2020-02-28 21:38 | Report Abuse

I see, thank you for the explanations. I presumed you got this from last year annual report?

DK66

4,269 posts

Posted by DK66 > 2020-02-28 21:41 | Report Abuse

From the company announcements to bursa malaysia

kalteh

99 posts

Posted by kalteh > 2020-02-28 21:55 | Report Abuse

Okay, got it. Thanks for your time and sharing!

DK66

4,269 posts

Posted by DK66 > 2020-02-28 22:06 | Report Abuse

you are welcome

Post a Comment
Market Buzz