AmInvest Research Reports

Econpile Holdings - 2QFY24 Below, Losses Continue Due to Cost Overruns

AmInvest
Publish date: Thu, 29 Feb 2024, 11:50 AM
AmInvest
0 8,766
An official blog in I3investor to publish research reports provided by AmInvest research team.

All materials published here are prepared by AmInvest. For latest offers on AmInvest trading products and news, please refer to: https://www.aminvest.com/eng/Pages/home.aspx

Tel: +603 2036 1800 / +603 2032 2888
Fax: +603 2031 5210
Email: enquiries@aminvest.com

Office Hours
Monday to Thursday: 8:45am – 5:45pm
Friday: 8:45am – 5:00pm
(GMT +08:00 Malaysia)

Investment Highlights

  • We maintain HOLD on Econpile Holdings (Econpile) with a higher fair value (FV) of RM0.39/share (from RM0.28/share previously) based on 1.4x FY24F book value – at parity to its 5-year mean. There are no FV adjustments for ESG based on our 3-star rating.
  • We deem Econpile’s 1HFY24 results as below expectations with a deteriorating core net loss (CNL) of RM14.9mil (+3.3x YoY) compared to our earlier FY24F net profit of RM8.3mil and consensus’ RM7.8mil. We cut our FY24F-25F earnings by 10% to account for the losses.
  • On QoQ basis, 2QFY24 CNL widened 3.3x to RM11.5mil from RM3.4mil in 1QFY24 as revenue decreased 8.5% to RM110mil. The bottomline was impacted by legacy projects as costs overruns greatly impacted margins. This was exacerbated by finance costs increasing by 14% QoQ as net gearing increased to 23% from 17% in end-FY23.
  • Econpile’s order book decreased by 27% QoQ to RM304mil as at end-December 2023 due to lower new contracts secured against higher progress billings.
  • Currently, there are 19 on-going projects at various stages of completion. Notable projects are (1) Three- Block SOHO @ KL (RM101mil); (2) The Park 3 @ Bukit Jalil (RM43mil); and (3) Pinnacle @ Subang Jaya SS16 (RM35mil).
  • Future prospects include civil infrastructural projects such as MRT 3 and Penang LRT. Econpile is also well positioned in Cambodia to win jobs with the expectation of higher margins compared to local jobs.
  • Challenges include (i) weaker-than-expected recovery of job flows; (ii) eroding profit margins as building material costs rise; and (iii) shelving of mega projects.
  • The stock currently trades at a fair FY24F P/BV of 1.3x, near its 5-year mean of 1.4x.

Source: AmInvest Research - 29 Feb 2024

Related Stocks
Discussions
Be the first to like this. Showing 0 of 0 comments

Post a Comment