9MFY22 CNP of RM551m came above market expectations on stronger property and construction margins. Meanwhile, a 6.0 sen dividend declared coupled with 9MFY22 property sales of RM2.7b was within expectations. With strong YTD wins of RM9.5b, Gamuda has guided for stronger replenishment of RM25b spread across FY22 and FY23. Consequently, we raise our FY23E replenishment to RM12.5b (from RM7.5b) in-line with the new guidance. Post results, we raise FY22/23E earnings by 11%/19. Keep OP on higher SoP-TP of RM4.20 (from RM4.00).
Strongly above expectations. 3QFY22 CNP of RM221.5m led 9MFY22 CNP to RM551m; way above ours/consensus expectations at 81%/89% of estimates respectively. The positive deviation stemmed from (i) stronger than expected margins from both its construction and property division and (ii) our overly aggressive tax assumptions for the year arising from ‘Cukai Makmur’. Meanwhile, a 6.0sen dividend declared brought YTD dividends to 12.0sen – inline with our expectations.
Sales inline. 3QFY22 sales of RM0.8b led 9MFY22 sales to RM2.7b – within our RM3.7b target (company targets RM4.0b). Property unbilled sales stood at a high of RM5.4b (3x cover).
Highlights. 3QFY22 CNP of RM221.5m increased 25% QoQ mainly on stronger property PAT contributions (+158%) as its Vietnam operations picked up substantially due to normalised productivity levels post lockdowns. This led the property’s revenue to increase by 15% which lifted PAT margins by 9ppt on operating leverage effect. 9MFY22 CNP of RM551m surged 47% YoY attributed to stronger construction and property segments. The construction segment saw stronger margins upon cost saving recognition from its MRT2 project while the property division was less affected by lockdowns.
Outlook and Key highlights from briefing as below:
GAMUDA has increased their replenishment target to RM25b (from RM20b)
spread across FY22 and FY23 (YTD wins of RM9.5b). Key contracts to make up the remaining c.RM15.5b include: (i) MRT3 underground package – RM5-6b (50% stake), (ii) Penang South Reclamation Project – RM5b, (iii) North East Link – RM3b (50% stake), (iv) Rasau Treatment Plant, and (v) other international contracts from Taiwan/Singapore. Consequent to the healthy pipeline of potential contracts, we raise our FY23E replenishment to RM12.5b (from RM7.5b) – in line with companies’ guidance. Note that our FY22E replenishment target stands at RM12.5b. Current construction orderbook stands healthy at RM12.4b. Earnings assumptions. We increase FY22 earnings by 11% to reflect (i) higher property and construction margins and (ii) less aggressive tax rates. As for FY23 earnings, we increase it by 19% to factor in (i) cost savings from MRT2 to continue flowing into 1HFY23 (which we did not previously) (ii) higher FY23E construction replenishment of RM12.5b and (iii) better margins from its property and construction division.
Maintain OP with higher SoP-TP of RM4.20 (from RM4.00) on (i) higher construction profits based on unchanged 18x PER and (ii) switching its property valuation methodology to 60% discount to RNAV (from 0.5x PBV). Our 60% discount to RNAV is benchmarked to peers who operate predominantly within the township space.
Source: Kenanga Research - 30 Jun 2022
Chart | Stock Name | Last | Change | Volume |
---|
2024-11-24
GAMUDA2024-11-23
GAMUDA2024-11-22
GAMUDA2024-11-22
GAMUDA2024-11-22
GAMUDA2024-11-22
GAMUDA2024-11-21
GAMUDA2024-11-21
GAMUDA2024-11-21
GAMUDA2024-11-20
GAMUDA2024-11-20
GAMUDA2024-11-20
GAMUDA2024-11-20
GAMUDA2024-11-19
GAMUDA2024-11-19
GAMUDA2024-11-19
GAMUDA2024-11-19
GAMUDA2024-11-19
GAMUDA2024-11-18
GAMUDA2024-11-18
GAMUDA2024-11-18
GAMUDA2024-11-18
GAMUDA2024-11-15
GAMUDA2024-11-15
GAMUDA2024-11-15
GAMUDA2024-11-15
GAMUDA2024-11-15
GAMUDA2024-11-15
GAMUDA2024-11-15
GAMUDA2024-11-14
GAMUDA2024-11-14
GAMUDA2024-11-14
GAMUDA2024-11-14
GAMUDA2024-11-14
GAMUDA2024-11-13
GAMUDA2024-11-13
GAMUDA2024-11-13
GAMUDA2024-11-12
GAMUDA2024-11-12
GAMUDA2024-11-12
GAMUDA2024-11-12
GAMUDACreated by kiasutrader | Nov 22, 2024