THE INVESTMENT APPROACH OF CALVIN TAN

FIBER OPTIC CABLES DEMAND WILL INCREASE DUE TO DIGITAL INFORMATION HIGHWAY, Calvin Tan

calvintaneng
Publish date: Fri, 11 Oct 2019, 02:19 PM
calvintaneng
0 1,859
Hi Guys,

I have An Investment Approach I which I would like to all.

Dear Friends & Fellow Investors

 

Just as Long Steel Bars are needed for Physical Highways FIBER OPTIC CABLES WILL BE NEEDED FOR THE INFORMATION HIGHWAYS

Image result for world widest highway picture

 

 

 

Highways will expand sideways from 2 lane tracks into 10 to 20 lanes Super Highways.

 

It will also stack up to multi levels

Image result for multi levels highways picture

 

So Calvin called for a Buy on Masteel at 66 sen. So far so Good. Even after Bonus Issues Masteel has surged to over Rm1.60. All who followed Calvin buy Masteel are laughing to the banks.

 

Now Just as Long Steel Bars are needed for MRT Train Pillars, High Speed Rail Pillars OPCOM's Fiber Optic Cables are needed for the Information highways

 

The need for wider bandwitch storage will need lots of Optic Fibers.

And for the Increasing Storage of Data - Call centers & Data Centres will stack up Lots & Lots of Fibers

HIGH FIBER COUNTS FACILITATE DATA CENTER

fiber

Market Drivers

Data center build-outs continue to grow, driven by the increase in bandwidth demands and changes in network architectures. As a result, time-to-market needs for the data center production environment continue to compress. In addition to these demands, data center managers are struggling to balance space constraints, rapid deployment timelines and upgrade scenarios given their staffing levels and funding.

As presented by the Dell’Oro Group at the Ethernet Alliance Forum in 2014, 10GbE switching is the current majority of data center switch revenue, with 40GbE and 100GbE switch revenue beginning to show growth. Bandwidth demands will continue to develop, as the majority of server-port bandwidth currently operates at 10GbE but is moving to 25GbE and 40GbE. This increase in demand at the server level is driving the need for 100GbE switch connectivity.

server

 

Adoption of network architectures such as spine and leaf as well as the use of technologies such as parallel optics are driving not only bandwidth demand, but also the scale of the network, requiring a greater fiber count for the cabling infrastructure. For spine-and-leaf architectures, each leaf switch in the network connects using a mesh to every spine switch in the network to provide increased resiliency. As a result, when this architecture is deployed in data centers, fiber counts can multiply very quickly compared with traditional three-layer distribution architectures. In addition, parallel optics uses eight fibers per port instead of the traditional two fibers per port of duplex applications, such as GbE and 10GbE. Therefore, when deploying parallel technologies, the fiber counts in your data center structured cabling will increase regardless of whether you’re using spine-and-leaf or traditional three-layer architectures.

architecture

 
 

Although bandwidth demand may come from different sources—such as support for external clients operating in a cloud-based-services data center, and internal lines of business for a traditional data center—the need to offer services more quickly is critical. To support this effort, the infrastructure must be capable of efficient deployment, offering rapid transition into production.

Impact on Structured Cabling

Traditional structured cabling deployments in the data center are based on infrastructure designs using pre-terminated MTP assemblies ranging from 12 to 144 fibers. To support the growing bandwidth needs as well as changing technologies and architectures, fiber-count requirements are also increasing, with spaces in the data center requiring connectivity to support demands of up to 288 fibers in a single run—and even fiber counts of 576 fibers in high-density areas.

As these types of deployments become necessary, it’s important to continue considering the impact of the application, environment and installation methods required to provide this high-fiber-count connectivity. Multiple design options enable implementation of high-fiber-count cabling and connectivity, each supporting scalability and helping the data center bring services to market quickly.

Application Spaces

As the data center environment evolves, the supporting cables and connectivity must change as well. Figure 3 shows where connectivity is required in a data center. High-fiber-count solutions are commonly needed between the main distribution areas (MDAs) of multiple computer rooms, or data halls, in a data center building. Within a computer room or data hall, high-fiber-count cabling can also be deployed between the MDA and the server rows as well as between the MDA and the data center core switching racks.

 

Discussions
Be the first to like this. Showing 6 of 6 comments

calvintaneng

OPCOM IS NUMBER CHAMPION OF 12 MP BUDGET

GOOOOOOOOOOOOOO!!!!

GO GO POWER RANGER!!!!

2019-10-11 16:01

calvintaneng

Bull market is born in pessimism

99% of people negative. So netx share price crashed to 1 sen or half sen

Bull market grows up in skepticism

Now at 2 sen people say chicken feed

Sir John Templeton is correct

Later bull market matures in optimism

Netx got job awarded and good results shown up in balance sheet

Next price rose from 4 sen to 8 sen

Bull market dies in hot hot euphoria

Netx share price gone to the moon like
Ifca up from 7 sen to Rm1. 87, or hengyuan from Rm2. 00 to Rm19. 00 or Jaks from 40 sen to Rm1. 90

When 99% of the market likes netx that will be the time to sell and run above 30 sen, 50 sen or Rm1. 00?

For now Netx looks like the safest stock

AT 2 sen

Netx has also zero debt

Netx has 3 sen in Cash (not asset)

Netx has Rm5. 4 millions shophouses in pj (corner 4 storey shop)

Netx has 9.6% shares of mlab

Netx with all the pp, rights and esos money have invested in infrar set up now in place

So what if you have sold?

Sold because of fear caused by naysayers

Listen to Calvin 's advise

Come.

Buy back every share you sold

Go buy back now while price still cheap and job award still to come

Buy and hold tight

Don' t sell this gold mine and wander to other landmines

2019-10-16 10:35

calvintaneng

Posted by roszali > Oct 16, 2019 3:49 PM | Report Abuse

IFCA ,MYEG ,Dsonic past also ACE market no fundamental penny stock.They related Government Transformation Programme (GTP) , NAJIB PM fin minister and ZAHID home affair deputy PM project GST .. IFCA from 8sen up to RM1.87 ,project e-Govt MYEG from 10 sen to RM2.90,project passport chips DSONIC from 13 sen up to RM2.40

Lim Guan Eng fin minister and mcmc GOBIND project National Connectivity Plan (NPCP) Netx ?c

WAHAHAHA!!!

ROSZALI HAS GIVEN US BRAND NEW REVELATION!!!

Najib Gst has propelled MyEG from 10 sen to Rm4.00 and split (Up 4,000%)

Thoughy NETX only go up 800% from 1 sen to 8 sen?

No no no!!

WITH THIS NEW REVELATION CALVIN NOW CHANGE NETX TARGET PRICE TO 15 SEN!!!

HO HO HO!!!

SO HAPPY NOW!!

2019-10-16 15:57

calvintaneng

Post removed.Why?

2019-10-16 21:00

calvintaneng

upshare

Calvin... hope your are right
..
Next may fly......


YES!

NETX WILL NOT ONLY FLY.....

NETX WILL ZOOOOOOOM UP LIKE A ROCKET ONCE JOB AWARD IS ANNOUNCED!!!
17/10/2019 12:06 PM
X
calvintaneng ONCE JOB IS ANNOUNCED?

LIMIT UP!

LIMIT UP!!!

LIMIT UP !!!!!
17/10/2019 12:06 PM

2019-10-17 12:08

calvintaneng

OFFICIAL ALLOCATION OF RM10.8 BILLIONS BY PARLIMENT WAS OCT 11 2019

SO GIVE IT A FEW WEEKS MORE (TODAY ONLY 6 DAYS SINCE BUDGET ANNOUNCEMENT)

1ST STEP

MOST VITAL DONE
CONFIRMATION OF RM21.6 BILLIONS FOR FIBERISATION

2ND STEP

LGE TRANFERS FUND TO TELEKOM
Lim Guan Eng work faster hor!


3RD STEP

TELEKOM

APPOINTS DIGITAL INFRASTRUCTURE CONTRACTORS TO INSTALL NATIONWIDE FIBERS

FROM BUKIT KAYU HITAM NORTH OF MALAYSIA TO JB CBD

FROM MELAKA TO KOTA BAHRU

FROM PORT KLANG TO KUANTAN PORT

FROM KUCHING TO TAWAU

FROM HILL AND DALE

FROM CITY TO KAMPUNG

FROM BUSY BKT BINTANG TO DESERTED JUNGLE

VALLEY TO MOUNTAIN

FROM STREET TO STREET

FROM RAIL TO RAIL

FROM HOME TO HOME

FROM FACTORY TO FACTORY

FROM WAREHOUSE TO WAREHOUSE

FROM DATA CENTER TO DATA CENTER

FROM HERE AND THERE

FROM OUT OF NO WHERE AND ALSO EVERY WHERE

RM21.6 BILLIONS STRONG FOR ULTIMATE DIGITAL PENETRATION

PENETRATING INTO EVERY NOOK AND CORNERS OF WEST MALAYSIA, SABAH & SARAWAK

2019-10-17 12:24

Post a Comment