We maintain our BUY call, forecasts and MYR5.45 FV. This follows 1HFY14 results that met expectations, as well as the fact that Gamuda is now working on the basis that the Cabinet has approved the MYR25bn Klang Valley MRT Line 2. Gamuda is the best proxy to the construction sector, which is riding on what we believe is an extended upcycle backed by the MYR73bn Klang Valley MRT project.
MRT Line 2 As Good As Approved
A solid 1HFY14. Gamuda’s 1HFY14 net profit was within expectations - at 50%/48% of our full-year forecast and market consensus respectively. MRT Line 2 as good as in the bag. Gamuda and project owner MRT Co are now working on a basis that the MYR25bn Line 2 of the Klang Valley MRT project has been approved by the Cabinet, and the 50:50 MMC-Gamuda JV has been appointed as the project delivery partner (PDP) for the elevated portion of Line 2 (as in the case of Line 1). Gamuda expects the Government to soon formally announce its approval for Line 2 as well as the appointment of MMC-Gamuda JV as the PDP for the elevated portion.
Gamuda is now working towards the goal that civil works on Line 2 will start in 1Q16, It believes that this can potentially be brought forward to 4Q15 if it is able to “shorten the lead time”, ie time needed to effect land acquisition, public feedback, detailed design and tendering of work packages, etc, to less than two years (Line 1’s lead time was about two years). This will ensure an acceptable and workable gap between Lines 1 and Line 2 to avoid discontinuity that may result in construction equipment being left idle and staff redeployed to other p rojects. To recap, civil works on Line 1 will be very much at the tail-end by mid-2015.
Gamuda reiterated that the indication from MRT Co is such that the PDP fee for the MYR15bn elevated portion of Line 2 will be lower than the 6% from Line 1. However, the group believes it will be “not less than 4%, hopefully 5%”. It believes other key PDP terms “will not deviate substantially from Line 1”. Also, Gamuda said that as in the case of Line 1, the MYR10bn underground portion of Line 2 is likely to be awarded on a Swiss challenge basis, ie via an international tender, with the sole local bidder – MMC-Gamuda JV – being given the right to match the lowest/winning bid.24% and 34% completion for Line 1. Gamuda made good progress on Line 1 of the Klang Valley MRT project. As at end-2QFY14, financial completion (ie works certified done and billed) of the elevated portion (on which MMC-Gamuda earns a PDP fee amounting to 6% of the value of the elevated portion contract estimated at MYR14bn) stood at 24% (vis-à-vis 17% three months ago), with the MYR8.3bn tunneling portion (on which MMC-Gamuda JV earns a construction margin, we assume at 12%) at 34% complete (from 24% three months ago). At present, all 10 tunnel boring machines (TBM) worth about MYR1bn have been delivered to the sites, with seven operational while the remaining three are being assembled.
Stable property sales in 1HFY14. Despite the headwinds in the property sector on the back of various cooling measures introduced by the Government recently , Gamuda remains bullish on its property business. It reiterated its guidance for another record year in FY14, with MYR1.9bn in projected sales, vis-à-vis the MYR1.75bn it achieved in FY13. For 1HFY14, it already recorded property sales of MYR980m, sustaining its unbilled property sales at MYR1.7bn as at end-2QFY14.
While Gamuda expects lower sales in FY14 from Horizon Hills in Johor (already, sales halved to only MYR150m in 2QFY14 from MYR300m in 1QFY14), this will be offset by sales from two new condominium projects in the heart of Kuala Lumpur, ie The Robertsons and Madge Mansions. No change to our earnings forecasts that assume property turnover and EBIT of MYR1.2bn and MYR290m per annum in FY14-15.
To take Government to court if it invokes Wasia. Gamuda is fully prepared to take the Government to court in the event the latter invokes Section 114 of the Water Services Industry Act 2006 (Wasia), which allows for it to step in and take over the operations of its 40%-owned water producer Splash. Gamuda reiterated that it cannot even consider the current offer, which values Splash in its entirety at MYR250m visà-vis its NTA of about MYR2.5bn and DCF valuation of MYR3.9bn. Gamuda believes that it will be “in breach of its fiduciary duty” to its shareholders as the company were to report a MYR920m “financial loss” by taking up the Government’s latest offer. The huge disparity between the Government’s offer price and Splash’s NTA stems largely from the Government’s non-recognition of Splash’s surplus of assets over liabilities (which comes largely from receivables) of more than MYR2bn.
Forecasts. Maintained as: i) Line 2 will only start to contribute more significantly from FY17, which is beyond our forecast period, and ii) It is unclear if the Government will invoke Section 114 of WASIA.Risks to our view. These include: i) risks associated with Line 1 of the Klang Valley MRT project including delays, cost overruns and potential changes to the PDP terms; ii) delays in the rollout of Lines 2 & 3 of the Klang Valley MRT project; and iii) a prolonged slowdown in the property market.
Maintain BUY. The prospects for the construction sector remain strong as it rides on what we believe is an extended upcycle, propelled largely by the MYR73bn Klang Valley MRT project. With Line 1 worth MYR23bn currently under construction and Lines 2 & 3 worth MYR25bn each under planning, this mammoth mega project will keep players busy until 2021. We like Gamuda as: i) it is the best proxy to public infrastructure spending in Malaysia given its d ominant role in Line 1 of the Klang Valley MRT project, and most likely, in Lines 2 & 3 as well; ii) it has secured the best parts of Line 1, as a PDP with a 6% fee and a contractor for the high -margin tunnelling jobs; and iii) it is likely to take the lead in terms of reacting to new sector price catalysts, given its large market capitalisation, high beta and share liquidity. Our FV is unchanged at MYR5.45, based on SOP (see Figure 2), valuing its construction business at 17x 1-year forward earnings, at a premium to our 1-year forward target P/Es for the construction sector of 10-16x to reflect the group’s large market capitalisation and high share liquidity.
Financial Exhibits
SWOT Analysis
Company Profile
Gamuda is primarily involved in construction, property development, operation of toll roads and the production of treated water. It is the leading player in public infrastructure in Malaysia by virtue of its project delivery partner and tunnell ing contractor roles in the construction of the Klang Valley MRT project.
Recommendation Chart
Source: RHB
Chart | Stock Name | Last | Change | Volume |
---|
2024-10-04
GAMUDA2024-10-04
GAMUDA2024-10-04
GAMUDA2024-10-04
GAMUDA2024-10-04
GAMUDA2024-10-03
GAMUDA2024-10-03
GAMUDA2024-10-03
GAMUDA2024-10-03
GAMUDA2024-10-03
GAMUDA2024-10-03
GAMUDA2024-10-03
GAMUDA2024-10-03
GAMUDA2024-10-02
GAMUDA2024-10-02
GAMUDA2024-10-02
GAMUDA2024-10-02
GAMUDA2024-10-02
GAMUDA2024-10-02
GAMUDA2024-10-01
GAMUDA2024-10-01
GAMUDA2024-09-30
GAMUDA2024-09-30
GAMUDA2024-09-30
GAMUDA2024-09-30
GAMUDA2024-09-30
GAMUDA2024-09-30
GAMUDA2024-09-30
GAMUDA2024-09-30
GAMUDA2024-09-30
GAMUDA2024-09-30
GAMUDA2024-09-30
GAMUDA2024-09-30
GAMUDA2024-09-28
GAMUDA2024-09-27
GAMUDA2024-09-27
GAMUDA2024-09-27
GAMUDA2024-09-27
GAMUDA2024-09-27
GAMUDA2024-09-27
GAMUDA2024-09-27
GAMUDA2024-09-27
GAMUDA2024-09-27
GAMUDA2024-09-27
GAMUDA2024-09-27
GAMUDA2024-09-27
GAMUDA2024-09-27
GAMUDA2024-09-27
GAMUDA2024-09-26
GAMUDA2024-09-26
GAMUDA2024-09-26
GAMUDA2024-09-26
GAMUDA2024-09-26
GAMUDA2024-09-25
GAMUDA2024-09-25
GAMUDA2024-09-25
GAMUDA2024-09-25
GAMUDA2024-09-25
GAMUDA2024-09-25
GAMUDA2024-09-25
GAMUDA2024-09-24
GAMUDACreated by kiasutrader | Jun 14, 2016
Created by kiasutrader | May 05, 2016