Dear Investors of i3 Forum,
THE GLOVE SUPER BULL RUN IS FINALLY NEAR ITS HOTTEST. TOPGLOVE OVER RM20.00. BOTH SUPERMAX & KOSSAN CROSSED RM10.00
THESE ARE STAR PERFORMING STOCKS OF MALAYSIA
Another STAR PERFORMING STOCK WILL BE PRESTAR OR PRE-STAR. YES SEE WHY CALVIN THINKS PRESTAR WILL BE ANOTHER FANTASTIC UPCOMING STAR PERFORMING STOCKS
1) PRESTAR CAPTURED 50% OF GUARD RAIL MARKET IN MALAYSIA
Recently Pansar got Job Award for Pan Borneo Highway. But Pansar bought its guardrails from Prestar.
KUALA LUMPUR (July 1): Steel products and equipment maker Prestar Resources Bhd has bagged contracts worth about RM80 million to supply guardrails and accessories for the development and upgrading of the proposed Pan Borneo Highway in Sarawak.
In a statement today, the group said its wholly-owned unit Prestar Engineering Sdn Bhd (PESB) has signed two supply agreements with Pansar Company Sdn Bhd — a unit of Pansar Bhd. It was also awarded contracts by LTC West Gate Sdn Bhd and Kemakmuran 2000 Sdn Bhd.
It said PESB will supply and deliver guardrails and accessories to four work packages for the Pan Borneo Highway project, namely the Pantu Junction to Batang Skrang stretch, Sungai Kua Bridge to Sungai Arip Bridge, Semantan to Sungai Moyan Bridge, and Sungai Awik Bridge to Bintagor Junction.
The contracts are expected to last until Dec 31, 2021.
Prestar group managing director Datuk Toh Yew Peng said the agreements and contracts are expected to contribute positively towards the future earnings of the group for the financial years ending Dec 31, 2020 and Dec, 31 2021, or until the expiry of the respective agreements and the contracts.
“Prestar will continue to participate in the open tender for the supply of guardrails for future packages of Pan Borneo Highway in Sabah,” he added.
Pan Borneo Highway is a road network on Borneo Island, connecting Sabah and Sarawak with Brunei and the Kalimantan region of Indonesia. Work on the Pan Borneo Highway in Sarawak, which spans 786.41km, was awarded in 11 packages and construction began in October 2015.
That small portion brought in Rm80 Millions revenue for Prestar
PAN BORNEO IS A VERY LONG HIGHWAY. SO CAN EXPECT MORE AND MORE ORDERS
See
Notice the shining guardrail? They are alloys of steel & nickel
The length of the entire highway is expected to be about 2,083 kilometres (1,294 mi) for the Malaysian section, 168 kilometres (104 mi) for the Bruneian section and 3,073 kilometres (1,909 mi) for the Indonesian section.[2] The Indonesian sections of the Pan Borneo Highway is known as the Trans-Kalimantan Highway.
Indonesia is moving its Capital from Jakarta to KALIMANTAN (Malaysia moved its Govt from KL to Putrajaya once)
SO THE DEMAND FOR PRESTAR GUARDRAILS CAN OVER INCREASE BY LEAPS & BOUNDS (TOTAL COMBINED LENGTH OF PAN BORNEO & TRANSKALIMANTAN HIGHWAY WILL BE 5,156 KM)
SEE AGAIN
THERE ARE 4 SIDES. TWO FOR EACH LANE
JUST LIKE YOU SELL GLOVES IN PAIRS (2 HANDS) YOU NEED 4 SETS OF GUARDRAILS FOR EACH HIGHWAY
SO?
5,156 x 4 = 20,624 KM
Earth's circumference is the distance around the Earth. Measured around the poles, the circumference is 39,940.653 km (24,817.971 mi). Measured around the equator, it is 40,075.017 km (24,901.461 mi).[1]
So 20,624 KM is almost half the Earth's Circumference!
GUARDRAILS ARE ALSO NEEDED FOR WCE HIGHWAT, MRT & LRT AS WELL AS THE ECRL RAIL
OW THERE ARE EVEN MORE BOOSTERS FOR PRESTAR (Reposting)
KUALA LUMPUR (March 14, 2019): The Works Ministry will implement 20 infrastructure projects worth RM5.26 billion this year that will help stimulate the country's economy.
Minister Baru Bian said they include the mega projects that had been long planned, such as the Central Spine Road (CSR), the Pan Borneo Highway and the Sarawak-Sabah link road projects.
“I believe these infrastructure projects will effectively help stimulate the country's economy...we will also try to renegotiate some of the planned projects that have yet to take off.
“We have to be careful because once signed, we cannot amend the contract,” he told Bernama after the recording session of the Bernama News Channel's (BNC) Property Hot Seat programme here today.
The Minister said road access linking rural and urban areas, especially in Sabah and Sarawak, would boost the tourism industry and help generate income for the locals.
“In Sarawak, for example, we have mountains like Mount Murud and Mount Mulu that could help draw more tourists. If it is made accessible with good infrastructure, it will definitely attract more tourist arrivals,” he said.
Central Spine Road (CSR) came to my attention
So I checked it up and this is what I got
Central Spine Road (CSR) or Kuala Krai–Kuala Pilah Highway, Federal Route 34, is a new toll-free highway under construction in the center of Peninsula Malaysia. The 325 km (201 miles) highway is built to eventually replace the former two-lane Federal Route 8 Gua Musang Highway and Federal Route 9 Karak–Tampin highway. Construction of CSR starts at Package 3 which is from Merapoh to Kampung Relong. It commences at Package 3 as the Gua Musang Highway passes through Chegar Perah which is prone to roadkill. The highway has a long eco-viaduct built in this section. Package 5 which is from north Raub to Karak will be built next, which will connect it to E8 Kuala Lumpur–Karak Expressway bypassing Bentong and Mempaga. This will help detour traffic from the steep mountainous grade between Raub and Bentong.
LET'S TAKE THIS 325 KM CENTRAL SPINE ROAD HIGHWAY AND CALCULATE ITS POTENTIAL
325 KM LONG WITH 4 ROWS OF GUARDRAILS
SO 325 X 4 = 1,300 KM
ONE PIECE OF GUARDRAIL IS 4 METER LONG
SO HOW MANY PIECES NEEDED?
DIVIDES 1300KM BY 4 = 325,000 PIECES
PER PIECE COST NOW IS RM217 (I ALREADY CALLED PRESTAR OFFICE)
SO 325,000 X 217 = 70,525,000
NOTE: FOR PAN BORNEO & TRANSKALIMANTAN HIGHWAY IT MIGHT CROSS RM1 BILLIONS IN TOTAL!!!
CAN EXPECT HALF BILLION RINGGIT WORTH OF ORDERS OF GUARDRAIL ROLLING IN FOR PRESTAR
SO JUST THIS SMALL HIGHWAY WILL BRING IN RM70.5 MILLIONS
BUT OF COURSE PRESTAR ONLY CAPTURED 50% OF MALAYSIA MARET
SO HALF OF M70.5 MILLIONS = RM35.25 MILLIONS
AND MALAYSIA BEING A GROWING NATION WILL STILL WITNESS MANY MORE KAMPUNG ROADS CONVERTED TO HIGHWAYS IN FUTURE.
AND THE FUTURE FOR PRESTAR IS VERY BRIGHT INDEED
PRESTAR OR PRE STAR: BUY IT BEFORE IT TURNS INTO A STAR AGAIN
CALVIN HAS A TARGET PRICE OF PRESTAR AR RM1.50
AT CURRENT PRICE OF 43 SEN THERE WILL BE A NICE 250% REBOUND
BEST REGARDS
Calvin Tan Research
Singapore
COMING UP NEXT
PRESTAR INTO REDHOT ECOMMERCE BUSINESS
PRESTAR DOING ECOMMENCE BY MAKING SHELVES FOR WARHOUSES
AND FOLLOWED BY HEALTH CARE
PRESTAR ALSO SELLS GLOVES AND NON-WOVEN FACE MASKS
AND COMING SOON
Created by calvintaneng | Sep 20, 2023
Created by calvintaneng | Sep 11, 2023
Created by calvintaneng | Sep 07, 2023
Yes Ah?
Got buy Esceramic at 35 sen?
Esceramic up Chun Chun more than 500% as it gave Free Bonus & Free Warrant
SO CHUN ONE!!
Now Must SELL ESCERAMIC & BUY FGV!!!
See this
https://klse.i3investor.com/blogs/www.eaglevisioninvest.com/2020-04-24-story-h1506110752-ES_CERAMIC_0100_WILL_ALSO_JOIN_COMFORT_GLOVE_SUPERMAX_LUXCHEM_ADVENTA_I.jsp
2021-04-24 20:16
Anyone got sell Prestar and esceramic and switched to buying Fgv and palm oil?
The time is ripe for palm oil shares to perform and shine now
2021-05-07 17:51
best time to buy is when few are interested
best time to sell Prestar when it turns hot hot like now
2021-05-07 18:38
The real reason Prestar huge profit is due to World steel price start rally in November 2020 nothing to do with highway mention above, Steel price continue on the uptrend as at today so next quarter results in Aug will see prestar double digit EPS. Prestar will continue to shine.
2021-05-07 19:59
No.
See CMSB got trouble?
Many contractors now in deep trouble due to very high steel prices!!
So going into insolvency cannot pay for material later Steel companies also cannot collect payment & go into trouble like CMSB
BETTER BUY PALM OIL
AS 30 MILLION INDIVIDUL NEED BUY COOKING OIL
PALM OIL IS A CASH BUSINESS AND DON'T DEPEND ON JUST A FEW CONSTRUCTION COMPANIES NOW IN TROUBLE
SELL PRESTAR NOW
BUY PALM OIL AS A DEFENSE & COMING BOOM
https://shopee.sg/Saji-Cooking-Oil-5kg-i.215545742.3544968157?gclid=EAIaIQobChMI-4Dekf248AIVC1pgCh0HlQFnEAQYAyABEgLCWPD_BwE
2021-05-08 09:54
mijiki3
These two palm oil stocks
1. IjmPlant
Rock solid and stable
This one will go up steadily without fanfare hype or hoo-ha
Buy and hold for one year
Can sleep soundly every night
2. Thplant
This one will have lots of ups and downs as it seeks to sell assets and pare gearing
But upside will be good eventually
2021-05-08 11:13
On July 6 2020 when Prestar was only 43 sen this article was posted
See
AT CURRENT PRICE OF 43 SEN THERE WILL BE A NICE 250% REBOUND
Now target almost reached SO DON'T CHASE PRESTAR ANYMORE
Peter Lynch gave this Top Secret
The time to buy Cyclical is when P/E is high with signs of turnaround from bottom (but that is the time when people not interested at all)
The time to sell cyclical is when P/E is low when prices have peaked and many people turned bullish (How true now there are people Shouting to buy steel when they should be selling instead)
So investing in Cyclical (don't mistake cyclical for growth stock) is contrary to human nature
You buy Cyclicals when you see BAD EARNINGS?
You sell cyclicals when you See Good Earnings?
How come like that?
90% of people failed to understand how to invest in Cyclicals
2021-05-25 08:16
calvintaneng
PRESTAR OR PRE STAR: BUY IT BEFORE IT TURNS INTO A STAR AGAIN
CALVIN HAS A TARGET PRICE OF PRESTAR AR RM1.50
AT CURRENT PRICE OF 43 SEN THERE WILL BE A NICE 250% REBOUND
Note:
Prestar buy call Chun Chun at 43 sen and now Rm1.28 (Up 197%!)
Don't chase Prestar now as Insiders are selling
SELL PRESTAR & BUY
FGV
YES FGV IS THE CHUN CHUN BUY BELOW RM1.40
2021-04-24 20:07