THE INVESTMENT APPROACH OF CALVIN TAN

PRESTAR (9873) Or Pre Star. Buy Before it Turns into A STAR. Calvin Tan Research

calvintaneng
Publish date: Mon, 06 Jul 2020, 02:21 PM
calvintaneng
0 1,803
Hi Guys,

I have An Investment Approach I which I would like to all.

Dear Investors of i3 Forum,

THE GLOVE SUPER BULL RUN IS FINALLY NEAR ITS HOTTEST. TOPGLOVE OVER RM20.00. BOTH SUPERMAX & KOSSAN CROSSED RM10.00

 

THESE ARE STAR PERFORMING STOCKS OF MALAYSIA

 

Another STAR PERFORMING STOCK WILL BE PRESTAR OR PRE-STAR. YES SEE WHY CALVIN THINKS PRESTAR WILL BE ANOTHER FANTASTIC UPCOMING STAR PERFORMING STOCKS

 

1) PRESTAR CAPTURED 50% OF GUARD RAIL MARKET  IN MALAYSIA

Recently Pansar got Job Award for Pan Borneo Highway. But Pansar bought its guardrails from Prestar.

Steel maker Prestar lands RM80m worth of supply contracts for Pan Borneo Highway

 

KUALA LUMPUR (July 1): Steel products and equipment maker Prestar Resources Bhd has bagged contracts worth about RM80 million to supply guardrails and accessories for the development and upgrading of the proposed Pan Borneo Highway in Sarawak.

In a statement today, the group said its wholly-owned unit Prestar Engineering Sdn Bhd (PESB) has signed two supply agreements with Pansar Company Sdn Bhd — a unit of Pansar Bhd. It was also awarded contracts by LTC West Gate Sdn Bhd and Kemakmuran 2000 Sdn Bhd.

It said PESB will supply and deliver guardrails and accessories to four work packages for the Pan Borneo Highway project, namely the Pantu Junction to Batang Skrang stretch, Sungai Kua Bridge to Sungai Arip Bridge, Semantan to Sungai Moyan Bridge, and Sungai Awik Bridge to Bintagor Junction.

The contracts are expected to last until Dec 31, 2021.

Prestar group managing director Datuk Toh Yew Peng said the agreements and contracts are expected to contribute positively towards the future earnings of the group for the financial years ending Dec 31, 2020 and Dec, 31 2021, or until the expiry of the respective agreements and the contracts.

“Prestar will continue to participate in the open tender for the supply of guardrails for future packages of Pan Borneo Highway in Sabah,” he added.

Pan Borneo Highway is a road network on Borneo Island, connecting Sabah and Sarawak with Brunei and the Kalimantan region of Indonesia. Work on the Pan Borneo Highway in Sarawak, which spans 786.41km, was awarded in 11 packages and construction began in October 2015.

 

That small portion brought in Rm80 Millions revenue for Prestar

PAN BORNEO IS A VERY LONG HIGHWAY. SO CAN EXPECT MORE AND MORE ORDERS

 

See

Related image

Notice the shining guardrail? They are alloys of steel & nickel

Pan-Borneo Highway

The length of the entire highway is expected to be about 2,083 kilometres (1,294 mi) for the Malaysian section, 168 kilometres (104 mi) for the Bruneian section and 3,073 kilometres (1,909 mi) for the Indonesian section.[2] The Indonesian sections of the Pan Borneo Highway is known as the Trans-Kalimantan Highway.

Indonesia is moving its Capital from Jakarta to KALIMANTAN (Malaysia moved its Govt from KL to Putrajaya once) 

SO THE DEMAND FOR PRESTAR GUARDRAILS CAN OVER INCREASE BY LEAPS & BOUNDS (TOTAL COMBINED LENGTH OF PAN BORNEO & TRANSKALIMANTAN HIGHWAY WILL BE 5,156 KM) 

 

SEE AGAIN 

 

ECRL (EAST COAST RAIL LINK) GUARDRAILS/WHEEL BARROWS OF PRESTAR ...

 

THERE ARE 4 SIDES. TWO FOR EACH LANE 

JUST LIKE YOU SELL GLOVES IN PAIRS (2 HANDS) YOU NEED 4 SETS OF GUARDRAILS FOR EACH HIGHWAY

SO?

5,156 x 4 = 20,624 KM

Earth's circumference

From Wikipedia, the free encyclopedia
 
 
Jump to navigationJump to search

Earth's circumference is the distance around the Earth. Measured around the poles, the circumference is 39,940.653 km (24,817.971 mi). Measured around the equator, it is 40,075.017 km (24,901.461 mi).[1]

So  20,624 KM is almost half the Earth's Circumference!

 

GUARDRAILS ARE ALSO NEEDED FOR WCE HIGHWAT, MRT & LRT AS WELL AS THE ECRL RAIL

 

OW THERE ARE EVEN MORE BOOSTERS FOR PRESTAR (Reposting)

 

20 infrastructure projects to be implemented this year — Baru Bian

KUALA LUMPUR (March 14, 2019): The Works Ministry will implement 20 infrastructure projects worth RM5.26 billion this year that will help stimulate the country's economy.

Minister Baru Bian said they include the mega projects that had been long planned, such as the Central Spine Road (CSR), the Pan Borneo Highway and the Sarawak-Sabah link road projects.

“I believe these infrastructure projects will effectively help stimulate the country's economy...we will also try to renegotiate some of the planned projects that have yet to take off.

“We have to be careful because once signed, we cannot amend the contract,” he told Bernama after the recording session of the Bernama News Channel's (BNC) Property Hot Seat programme here today.

The Minister said road access linking rural and urban areas, especially in Sabah and Sarawak, would boost the tourism industry and help generate income for the locals.

“In Sarawak, for example, we have mountains like Mount Murud and Mount Mulu that could help draw more tourists. If it is made accessible with good infrastructure, it will definitely attract more tourist arrivals,” he said.

Central Spine Road (CSR) came to my attention

So I checked it up and this is what I got

Central Spine Road

Central Spine Road (CSR) or Kuala Krai–Kuala Pilah HighwayFederal Route 34, is a new toll-free highway under construction in the center of Peninsula Malaysia. The 325 km (201 miles) highway is built to eventually replace the former two-lane Federal Route 8 Gua Musang Highway and Federal Route 9 Karak–Tampin highway. Construction of CSR starts at Package 3 which is from Merapoh to Kampung Relong. It commences at Package 3 as the Gua Musang Highway passes through Chegar Perah which is prone to roadkill. The highway has a long eco-viaduct built in this section. Package 5 which is from north Raub to Karak will be built next, which will connect it to E8 Kuala Lumpur–Karak Expressway bypassing Bentong and Mempaga. This will help detour traffic from the steep mountainous grade between Raub and Bentong.

 

LET'S TAKE THIS 325 KM CENTRAL SPINE ROAD HIGHWAY AND CALCULATE ITS POTENTIAL

325 KM LONG WITH 4 ROWS OF GUARDRAILS

SO 325 X 4 = 1,300 KM

ONE PIECE OF GUARDRAIL IS 4 METER LONG

SO HOW MANY PIECES NEEDED?

DIVIDES 1300KM  BY 4 = 325,000 PIECES

PER PIECE COST NOW IS RM217 (I ALREADY CALLED PRESTAR OFFICE)

SO 325,000 X 217 = 70,525,000 

NOTE: FOR PAN BORNEO & TRANSKALIMANTAN HIGHWAY IT MIGHT CROSS RM1 BILLIONS IN TOTAL!!!

CAN EXPECT HALF BILLION RINGGIT WORTH OF ORDERS OF GUARDRAIL ROLLING IN FOR PRESTAR

SO JUST THIS SMALL HIGHWAY WILL BRING IN RM70.5 MILLIONS

BUT OF COURSE PRESTAR ONLY CAPTURED 50% OF MALAYSIA MARET

SO HALF OF M70.5 MILLIONS = RM35.25 MILLIONS

AND MALAYSIA BEING A GROWING NATION WILL STILL WITNESS MANY MORE KAMPUNG ROADS CONVERTED TO HIGHWAYS IN FUTURE.

AND THE FUTURE FOR PRESTAR IS VERY BRIGHT INDEED

PRESTAR OR PRE STAR: BUY IT BEFORE IT TURNS INTO A STAR AGAIN

CALVIN HAS A TARGET PRICE OF PRESTAR AR RM1.50

AT CURRENT PRICE OF 43 SEN THERE WILL BE A NICE 250% REBOUND

 

BEST REGARDS

 

Calvin Tan Research

Singapore

 

COMING UP NEXT 

 

PRESTAR INTO REDHOT ECOMMERCE BUSINESS

PRESTAR DOING ECOMMENCE BY MAKING SHELVES FOR WARHOUSES

AND FOLLOWED BY HEALTH CARE

PRESTAR ALSO SELLS GLOVES AND NON-WOVEN FACE MASKS

 

 

Pan Borneo Highway Sarawak - Home | Facebook

 

AND COMING SOON

ECRL project is back on, supplementary deal signed | The Star

 

Discussions
Be the first to like this. Showing 12 of 12 comments

calvintaneng

PRESTAR OR PRE STAR: BUY IT BEFORE IT TURNS INTO A STAR AGAIN

CALVIN HAS A TARGET PRICE OF PRESTAR AR RM1.50

AT CURRENT PRICE OF 43 SEN THERE WILL BE A NICE 250% REBOUND


Note:


Prestar buy call Chun Chun at 43 sen and now Rm1.28 (Up 197%!)

Don't chase Prestar now as Insiders are selling

SELL PRESTAR & BUY

FGV

YES FGV IS THE CHUN CHUN BUY BELOW RM1.40

2021-04-24 20:07

DickyMe

Already bought it when it was @34.5 sen.

2021-04-24 20:11

calvintaneng

Yes Ah?

Got buy Esceramic at 35 sen?

Esceramic up Chun Chun more than 500% as it gave Free Bonus & Free Warrant

SO CHUN ONE!!

Now Must SELL ESCERAMIC & BUY FGV!!!

See this
https://klse.i3investor.com/blogs/www.eaglevisioninvest.com/2020-04-24-story-h1506110752-ES_CERAMIC_0100_WILL_ALSO_JOIN_COMFORT_GLOVE_SUPERMAX_LUXCHEM_ADVENTA_I.jsp

2021-04-24 20:16

calvintaneng

Post removed.Why?

2021-05-07 17:51

calvintaneng

best time to buy is when few are interested

best time to sell Prestar when it turns hot hot like now

2021-05-07 18:38

gladiator

The real reason Prestar huge profit is due to World steel price start rally in November 2020 nothing to do with highway mention above, Steel price continue on the uptrend as at today so next quarter results in Aug will see prestar double digit EPS. Prestar will continue to shine.

2021-05-07 19:59

calvintaneng

No.

See CMSB got trouble?

Many contractors now in deep trouble due to very high steel prices!!

So going into insolvency cannot pay for material later Steel companies also cannot collect payment & go into trouble like CMSB

BETTER BUY PALM OIL

AS 30 MILLION INDIVIDUL NEED BUY COOKING OIL

PALM OIL IS A CASH BUSINESS AND DON'T DEPEND ON JUST A FEW CONSTRUCTION COMPANIES NOW IN TROUBLE

SELL PRESTAR NOW

BUY PALM OIL AS A DEFENSE & COMING BOOM

https://shopee.sg/Saji-Cooking-Oil-5kg-i.215545742.3544968157?gclid=EAIaIQobChMI-4Dekf248AIVC1pgCh0HlQFnEAQYAyABEgLCWPD_BwE

2021-05-08 09:54

mijiki3

Which palm oil stocks ?

2021-05-08 10:06

calvintaneng

mijiki3

These two palm oil stocks

1. IjmPlant

Rock solid and stable
This one will go up steadily without fanfare hype or hoo-ha
Buy and hold for one year
Can sleep soundly every night

2. Thplant
This one will have lots of ups and downs as it seeks to sell assets and pare gearing
But upside will be good eventually

2021-05-08 11:13

calvintaneng

On July 6 2020 when Prestar was only 43 sen this article was posted

See

AT CURRENT PRICE OF 43 SEN THERE WILL BE A NICE 250% REBOUND

Now target almost reached SO DON'T CHASE PRESTAR ANYMORE

Peter Lynch gave this Top Secret

The time to buy Cyclical is when P/E is high with signs of turnaround from bottom (but that is the time when people not interested at all)

The time to sell cyclical is when P/E is low when prices have peaked and many people turned bullish (How true now there are people Shouting to buy steel when they should be selling instead)

So investing in Cyclical (don't mistake cyclical for growth stock) is contrary to human nature

You buy Cyclicals when you see BAD EARNINGS?

You sell cyclicals when you See Good Earnings?


How come like that?

90% of people failed to understand how to invest in Cyclicals

2021-05-25 08:16

calvintaneng

TIME TO BUY MASTER - THE MASTER OF LONG STEEL

2021-08-09 08:05

calvintaneng

MASTEEL GOOD BUT PALM OIL IS EVEN BETTER FOR NOW!!

2021-08-09 08:07

Post a Comment