Good morning everybody. Question to ask ourselves so that we can do some thinking. Is it true that the company unable to deny fact by PSAi3alert as per what market expected? Since it's not yet price-in, is it the price should much lower than serbadk?
PSAi3alert calvintaneng,
Perhaps too much working from home is causing your contacts to have temporary memory loss.
Both Mustakim Bin Mat Nun and Amirul Afif Bin Abd Aziz are indirect shareholders of One Hydro Power Sdn Bhd, which in turn is a wholly-owned subsidiary of OHP Ventures Sdn Bhd. In fact Mustakim Bin Mat Nun Amirul Afif Bin Abd Aziz, and Zainal Azwadi Zainal Abidin are also directors of OHP Group.
I will now answer those questions that have been posed.
When KPowernet accepted the award by Zhenghong for the Nam Taep 1,2,3 Hydropower Co Ltd ("NT") project valued at USD40.7M in June 2020, the same project that was awarded by NT to Serba, valued at USD66.2M, in July 2018 ought to have been terminated.
You just cannot sell the Brooklyn Bridge twice. Furthermore, Mustakim, Amirul and Zainal ought to know since all three of them are directors of the OHP Group and OHP Group has 35.7% stake in NT.
The impacts for Serba are now:
--->>> Serba will need to write-off RM20.99M from its receivables for the hydro power projects in Laos (FYE 2019: RM12.326M, 15months ended 31-03-2021: RM8.664M)
--->>> Serba will need to write-off RM3.36M (USD800,000) for it's 34.3% stake in NT because Zhenghong is now allegedly the owner for the hydro power plants (the 49% stake in OHP Ventures was purchased form OHPVSB in Oct 2018. OHP Ventures has 70% share in NT)
With the NT and Serba confusion out of the way, we will now try to understand the awards by Zhenghong Building Road and Bridge Construction Co Ltd.
KPowernet announced 2 awards by Zhenghong: - USD40.7M in June 2020 (3x5 megawatt Nam Taep 1 and 3x5MW Nam Taep 2 hydropower project) - USD15.88M in Feb 2020 (8 megawatt Nam Samoy hydropower project)
Zhenghong Building Road and Bridge Construction Co Ltd is a company registered by Zheng FuJun in Laos. Zheng Fujun has also registered 3 other companies in Laos - Lao Fanya Marble-Granite Rock Co. Ltd, Lao Fanya Agriculture Investments Co. Ltd and Lao-China Yuan Sheng Real Estate Development Co. Ltd.
None of those companies registered by Zheng FuJun has a power purchasing agreement with Électricité du Laos. Without a PPA in place, it will be impossible to obtain fundings.
Even with a signed PPA, funding will be challenging because of a situation of over-capacity of hydropower plants and debt levels that have resulted in the downgrading of the country's rating to CCC.
Of the 90 hydropower plants that have been planned, 56 plants are in operation with a total capacity of 8,768 Megawatts. Thailand and Yunnan Province in China have had an electricity surplus in recent years and have reduced their demand from Laos.
For completeness sake, I have looked at the satellite images of the Nam Taep river at Sam Tai District, Houaphanh province; and Nam Lik river, Vientiane Province. Unfortunately, there is no evidence of hydropower plant construction activities in those areas.
I do have a couple of additional questions:
--->>> Question: How much of the USD40.7M (3x5 megawatt Nam Taep 1 and 3x5MW Nam Taep 2 hydropower project) contract has been recognized as receivables by KPower?
--->>> Question: How much of the USD15.88M (8 megawatt Nam Samoy hydropower project) contract has been recognized as receivables by KPower?
Now that vespa mentioned about Nepal, there was a RM207.84M contract to build a mini-hydropower in Solukhumbhu, Nepal.
The coordinates of project area are: 86 48’ 26” E to 86 51’ 34” E 27 29’ 09” N to 27 30’ 51” N
-->> Can you please check with your contacts on how much of the RM207.84M contract has been recognized as receivables?
-->> Satellite images of the project area are showing no construction activities in the project area. -->> Can you please check if the project has been abandoned?
Thursday, May 14th, 2020
KUMPULAN Powernet Bhd (KPower) has bagged a US$48 million (RM207.84 million) contract from Ghaurishankar Power Development Pte Ltd (GPD) to build a mini-hydropower plant in Solukhumbhu, Nepal.
The contract will require KPower to design, build and commission a mini-hydropower plant with a capacity of 22.9MW.
KPower expects to complete the project within 36 months from the commencement date or not later than May 12, 2023, it said in an exchange filing yesterday.
calvintaneng Don't simply pass judgment. Wait for all Receivables to be Turned into CASH Slowly then you will know 09/08/2021 10:52 PM
In August 2020, KPower announced a RM192.68M project with Apex Makalu in Nepal.
The Mid-Hongu Khola A Hydropower Project was previously signed between Apex Makalu and CNEEC in Sep 2019.
However, on the 9th July 2021, Sanima Hydro and Engineering announced an agreement with Apex Makalu for Due Diligence for, again, the same Mid Hongu Khola – A Hydropower Project.
The coordinates of project area are: 86 51' 23" E to 86 53' 54" E 27 30' 51" N to 27 32' 08" N
-->> Can you please check with your contacts on how much of the RM192.68M contract has been recognized as receivables?
-->> Sanima just announced an agreement with Apex Makalu -->> Can you please check if agreement between KPower and Apex Makalu is still in force or has it been terminated?
-->> Satellite images of the project area are showing no construction activities in the project area. -->> Can you please check if the project has been abandoned?
23rd Sep 2019 - CNEEC's Press Statements
Mr. Chhabindra Parajuli, Commercial Consulate of Embassy of Nepal in China, and Mr. Zhao Hui, President of CNEEC witnessed the signing of EPC Contract for Nepalese Mid-Hongu Khola A Hydropower Project, which are undertaken by Mr. Kedar Nath Poudel Director of Apex Makalu Hydro Power Pvt. Ltd., and Mr. Ning Hui, Deputy General Manager of CNEEC No. 1 Business Department.
27th Aug 2020 - KPower's Press Statements
Kumpulan Powernet Bhd has secured a contract worth US46.2 million (RM192.68 million) for a hydropower project at Mahakulung VDC, Nepal.
In a bourse filing, the group said its wholly-owned subsidiary KPower International Ltd received a letter of award yesterday from Apex Makalu Hydro Power Pvt Ltd for the 22MW Mid Hongu Khola-A hydropower project in Nepal.
"The scope of work includes the engineering, construction, supervision, testing, commission, reliability test, remedy of defect during the defect liability period and provision of all equipment, both permanent works and temporary works in connection with the project," the company said.
The target completion date for the project is within 36 months from the commencement date, or not later than Aug 31, 2023.
9th July 2021 - Sanima's Press Statements
Sanima Hydro and Engineering (P.) Ltd signed a contract agreement with Apex Makalu Hydropower Ltd. for Due Diligence Study of Mid Hongu Khola – A Hydropower Project (22 MW) on 9th July, 2021. The project is located in Solukhumbu district, Province No.1 of Nepal. It has been planned as a run-of-river (RoR) type scheme with an installed capacity of 22 MW, design discharge at Q42.85 of 13.50 m3/sec, and gross head of 210.00 m.
Yes Azrb went up but retraced as its palm oil mills in Indonesia closed for serving plus currency exchange losses impacted Azrb Now with Cpo over Rm4000 Azrb should see better times
hahaha What will the price movement after 1month and also the hsare price after E&Y report Release at End of September?
calvintaneng Yes Azrb went up but retraced as its palm oil mills in Indonesia closed for serving plus currency exchange losses impacted Azrb Now with Cpo over Rm4000 Azrb should see better times
Kpower QR release next Monday, last QR good profit but after release share price keep falling down. Serbark QR release next Wednesday, Same as Kpower, Serbark last QR good profit, but pshare price keep goes down, only wait E&Y report release end of september only know company good or bad Save your money invest good stock instead follow calvin to buy NEXT lo :) :) :)
This book is the result of the author's many years of experience and observation throughout his 26 years in the stockbroking industry. It was written for general public to learn to invest based on facts and not on fantasies or hearsay....
Bren21
182 posts
Posted by Bren21 > 2021-08-04 21:37 | Report Abuse
https://www.theedgemarkets.com/article/serba-dinamik-finally-appoints-nexia-ssy-plt-new-external-auditor-after-receiving-kpmgs-nod