Posted by jjohnchew > 6 days ago | Report Abuse

Hoho Repost :


👉The hidden risks as posted earlier:

These 4 Latest FPSO illustrated Total Loans n Borrowings =.RM 12.4 billion + 3.22 billion =. RM 15.62 billions

QR October 2024 Total Loans n Borrowings RM 19.37 billion- RM 15.62 billion = RM 3.75 billion.

👉👉 Question: Where is this Loans n Borrowings RM 3.75 billion is b/f From ????😱😱😱🤔


Note : 4 Latest FPSO > Anna Nery , Atlanta, Maria and Agogo .

jjohnchew

3,902 posts

Posted by jjohnchew > 6 days ago | Report Abuse

Hoho as usual Dumbasxx TinKosongLeader Kon SS leee Twisting n Twisting…

👉 BTW what is Agogo n Anna Nery Loans !!!


Optional Charter Contract ke … hope not like Armada FPSO Claire lo … Optional contract is Not extended… Armada taken Legal action but is Failed …. Esp FPSO Agogo oil field is in Africa.


And by the way donkey is FPSO agogo Firm: 15 years (USD 4.6 billion)
Optional: 5 x 1-year (USD 0.7 billion) is cheaper than FPSO Anna Nery 25 years (2023 - 2048) (USD 5.5 billion)?


Posted by Sslee > minutes ago | Report Abuse
USD Billion 
FPSO Anna Nery HY (SOV) Brazil 5.7 
FPSO JAK IG Ghana 1.8 
FPSO Helang IG Malaysia 1.1 
FPSO AJ - Nigeria 0.8 
FSO PTSC Bien2 Sov Vietnam 0.1 
FPSO PTSC Lam3 Sov Vietnam 0.006 
FPSO Agogo IG Angola 5.4 
FPSO Maria Quitéria HY (SOV) Brazil 5.3 
FPSO Atlanta - Brazil 2.2 
Total 22.2

jjohnchew

3,902 posts

Posted by jjohnchew > 6 days ago | Report Abuse

1st Lies :


Hoho wow KonLee is an “ Attention Seeker “ .., approached my Question 1st in Netx on 2020 telling Lies replied my post which directed to Konstockraider to bail out Stockraider on Insas-WB whom play wayang in Insas-WB forum with Calvin whom invested RM 5000 …


Then Kon Sslleee said StockRaider Win 1 Myvi in Netx RI .. StockRaider said Win 2 Myvi… both blowing bla bla bla Klon the Wayang Script on Insas and WC …

After KonLee posted in Netx , his Kon gang in Tunepro, Hengyuan, Petronm started to promote Netx … will post n delete own posts …..beware .

Sslee

7,178 posts

Posted by Sslee > 6 days ago | Report Abuse

Remaining backlog as of 31 October 2024,
FPSO Anna Nery HY(SOV) Brazil 5.5
FPSO JAK IG Ghana 1.8
FPSO Helang IG Malaysia 1.1
FPSO AJ - Nigeria 0.8
FSO PTSC Bien2 Sov Vietnam 0.1
FPSO PTSC Lam3 Sov Vietnam 0.0
FPSO Maria Quitéria HY
(SOV) Brazil 5.2
FPSO Atlanta - Brazil 2.1
FPSO Agogo IG Angola 5.3
FSO Lac Da Vang BB+ Vietnam 0.2
Total 21.9


Remaining backlog as of April 30 2024,
FPSO Anna Nery HY(SOV) Brazil 5.7
FPSO JAK IG Ghana 1.8
FPSO Helang IG Malaysia 1.1
FPSO AJ - Nigeria 0.8
FSO PTSC Bien2 Sov Vietnam 0.1
FPSO PTSC Lam3 Sov Vietnam 0.0
FPSO Agogo IG Angola 5.4
FPSO Maria Quitéria HY
(SOV) Brazil 5.3
FPSO Atlanta - Brazil 2.2
Tota 22.2

Posted by Philip ( buy what you understand) > 6 days ago | Report Abuse

This reply alone makes me wonder what this little kid is thinking about... no wonder he thinks jaks is an amazing business and everything else is bad... jtiasa is bad, yinson is bad... but contrast to value yinson is 8.6billion, jtiasa i 1.2 billion, meanwhile his very highly reported and believed stock jaks is... 350 million and dropping... so why do you still bother to post when your "facts" and "figures" basics are already so wrong?

>>>>>>
jjohnchew

Hoho after financial assets minus financial liabilities recorded at that QR ..then is on the interest rate / interest expenses for simplified …

xiaoeh

2,874 posts

Posted by xiaoeh > 5 days ago | Report Abuse

there is different view/conclusion in between Mike and Sslee after risk reward analysis
one sees huge upside potential
and the other sees major risk if fund rupture

Posted by Holdom2040 > 5 days ago | Report Abuse

Next quarter (Q42025): probably PAT = 150 - 200m/quarter.
increase contribution from Maria (3 months vs 1 month last qtr)
increase contribution from Atlanta
decrease contribution from Anna (reduce stake)
decrease 150m one off disposal to Icon

PAT has deduct finance cost & other cost. the profit is not cash immediately but in the form of receivables (receive in the future, interest rate discounted)

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

Hoho as usual still No facts n figures from the Tua Kidd Buy What U Not Understand…

Why still promoted Serba with 🐍n 🐉story even is in Account Fraud…n Kon Ss leee twisted together on Serba subsidiaries….😱😱😱

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

Hoho Jtiasa ? The old Kidd Serba story teller Buy What U Not Understand said did Not hold any Jtiasa shares… who Trapped from Double Top RM 1.53 le ….Mr K2Y sailang his investing Capital push the price to 1.53 … the Next day price is Pressed down ….Next is Old Kidd Serba story teller ke …🤔

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

Hoho as posted earlier…

As I had posted earlier on Nestle Moat n yr Harta :

1.) Nestle : Moat on ROE

ROE (ROIC: 59.2) 85.93 %
Dividend Per Share (DPS) 233.0 sen
Dividend Yield (DY) 2.32 %

Only those bought 15 years ago shl benefited the most …and is not a Best Buy now ..

And with information that the CEO Mark Schneider is replaced on August 2024 due to weak sales growth and worries about slowing product development.

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

Hoho no le .. not only Jaks le … ss lee n I had debated Capital A earlier le … he used his Kon maths trick add up Capital A n AAX figures as Negative commentator.. I said if Not dropped below 0.56 is OK … the Lowest is 0.56 le .. ss leee said recently is OK le .. sure ke ss lee my Free balance Capital A tickets will strike Jackpot ke “ out from PN17 “ …

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

Hoho what is the MOAT of Yinson ??? Oh Size is bigger than Armada le .. Armada learned from FPSO kraken n Claire case :

Armada :
Current Ratio 0.66
Debt-Equity (DE) Ratio 0.93
FCF Yield 6.84 %
Revenue QoQ -4.66 %
Revenue YoY 5.16%
Profit QoQ -20.54 %
Profit YoY 18.88 %
Profit Margin (Sector Median: 6.8) 23.12 %


Yinson :
Current Ratio 0.64
Debt-Equity (DE) Ratio 2.27
FCF Yield -10.31 %
Revenue QoQ -13.49 %
Revenue YoY -34.13%
Profit QoQ -1.48 %
Profit YoY -19.35 %
Profit Margin (Sector Median: 5.9) 9.92 %

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

Hoho recalled Armada FPSO Kraken First Oil is delayed ard 9 months to 12 months….made a Huge impairment.

Kraken capacity: 80,000 bpd .

Atlanta capacity: 50,000 bpd .

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

Hoho Repost :

Armada vs Yinson fleet


Armada :

The current operated assets as follow:
 

3 wholly owned FPSOs

4 jointly owned FPSOs

1 wholly owned LNG FSU

2 construction vessels


👉Note : after sold FPSO Claire which the Contract Option of renewal/ additional year is terminated n Lost in Legal Trial .


Malaysian player sells FPSO to mystery buyer for $20 million. Malaysian floater specialist Bumi Armada has confirmed it has sold via its subsidiary Armada Balnaves the Armada Claire floating production, storage and offloading vessel for $20 million.26 Apr 2023




Yinson :


FPSO Jak : 74 %

FPSO Helang : 100 %

FPSO Abigail : 100 %

FPSO Anna Nery : 75 % ( recently is reduced to 64 % , 1st oil on May 2023 ) .

FPSO Atlanta : 100 % ( initial 1st oil is scheduled by Feb 2024 .. then August 2024 .. then ?? )


FPSO Maria : 100 % ( 1st oil on October 2024 )

FPSO Agogo : 100 % ( still in Construction, 1st oil is scheduled by early 2026 )

FPSO Lam Son : 49 %

FSO Bien : 49 %

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

The Difference of DE ratio :

Armada :
Debt-Equity (DE) Ratio 0.93

Yinson :
Debt-Equity (DE) Ratio 2.27

Posted by Philip ( buy what you understand) > 5 days ago | Report Abuse

You realize the difference of contract between Atlanta and kraken right? Or you think it is the same contractual and return rate between both types. One was signed at 2013 when oil price was sky high and people were offering crazy offers because they thought oil prices were going to go higher while the other was signed in 2021 when yinson was one of 2 bidders... Guess who can offer better rates?

Posted by Philip ( buy what you understand) > 5 days ago | Report Abuse

Just because you throw enough mud and hope everything will stick doesn't mean it will.

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

Hoho ho ho ho the Serba Story Teller Buy what u Not Understand why so madd n childish like in Jtiasa as u said Not holding any Jtiasa shares …

Meanwhile, Hong Leong Investment Bank (HLIB) Research estimates that the Kraken FPSO has a daily charter rate of approximately USD480k/day (or USD175m/year), which accounts for some 35% of the group's revenue contribution in FY2022.


Fpso Atlanta usd 305,000 a day ( first oil 31 dec 2024 )

Posted by Holdom2040 > 5 days ago | Report Abuse

With fpso atlanta first oil, 2025 will have steady income stream. Next risk if fpso agogo. If no delay then all is good

Posted by Holdom2040 > 5 days ago | Report Abuse

Becuz of fpso atlanta delay, Q32025 will have bad result if nt becuz of one off disposal of Icon. Excluding forex too

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

QR October 2024 :

Hoho USD 49 million is ard RM 210 million.. QR ended October 2024 with Profit RM 200 million and Total Loans n Borrowings is Reduced by RM 207 million.

…just keep selling assets n FPSO equities in order Account book looks Good le ….

no worries le .. FPSO Maria is First Oil on October 2024 .. now can start Refinancing also ….

Refinancing on October 2024 sold 11.8 % equity of FPSO Anna Nery … ownership is reduced from 75 % to 63.2 % !😱

22/10/2024 : K Line own 11.8 % with USD 49 million.


Yinson divests its offshore support vessel business for RM160mil
By DIYANA ISAMUDIN
September 1, 2024 @ 2:59pm

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

Hoho this is interesting le , may refer to QR April 2024 on Loans n Borrowings :

Nonetheless, the profile of Yinson’s loans is worth highlighting. Of the RM16.3 billion in borrowings, RM9.83 billion have a maturity of between two and five years. Those with over five years’ maturity amount to RM3.84 billion.

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

On the other hand, its critics are not convinced that the debt accumulation is sustainable, especially after its most recent financial year ended Jan 31, 2024 (FY2024), which saw borrowings rising to RM16.3 billion, a whopping 70% increase from RM9.6 billion in FY2023.

It puts the company’s net gearing at 1.66 times in FY2024 compared with 1.23 times in FY2023. This does not take into account its RM1.79 billion in perpetual securities in FY2024, which is classified as equity.
Yinson’s total borrowings increased further to RM16.56 billion as at April 30.

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

Hoho let’s see What Shl be happening on Next FY2026 Financial Reports from Operating lease to Finance lease follow IFRS …especially on those Elimination figures le ….

Posted by Philip ( buy what you understand) > 5 days ago | Report Abuse

That's why I say those who don't look at contracts and only look at top level will only lose money in Jaks while those who spend extra to look at the numbers actually make money ( like those who buy yinson).

Here are the numbers kid mikecyc.

Why armada is worth so little.
They signed 1.5 billion contract for 8 years firm for 1.4 billion and 17 yearly option extensions. But when fpso kraken production drop by 60%, long term value of kraken is gone which is why armada is not worth money because the contracts are loop sided to owner instead of builder. At this rate kraken bare boat charter will end next year with no profit after 8 years of hardship.

Yinson on the other hand sign 15 year firm with 5 year option o&m for 2 billion, with the construction cost 465 million. So in this case they built it cheap, with long term FIRM 15 year contract.

Now you know why yinson 8.6b, armada 3.9b. do you know why Jaks is worth 360 million?
>>>>>>

ours ago



jjohnchew

Hoho ho ho ho the Serba Story Teller Buy what u Not Understand why so madd n childish like in Jtiasa as u said Not holding any Jtiasa shares …

Meanwhile, Hong Leong Investment Bank (HLIB) Research estimates that the Kraken FPSO has a daily charter rate of approximately USD480k/day (or USD175m/year), which accounts for some 35% of the group's revenue contribution in FY2022.


Fpso Atlanta usd 305,000 a day ( first oil 31 dec 2024 )

Posted by Philip ( buy what you understand) > 5 days ago | Report Abuse

*for some reason fpso kraken cost 1.4 billion to build. Why fpso Atlanta only cost 465 million to build? One built in China using cheap ship, the other built in keppel shipyard using conversation of sueznax which was bought at a very very expensive price back in 2013 during the oil craze. That is called proper management of funds

Posted by Philip ( buy what you understand) > 5 days ago | Report Abuse

Now, ask yourself why Jaks which has zero experience building power plant suddenly jump into such a huge contract without any money and capability? That's why you lose money in Jaks mike. That's why...

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

Hoho I am debated against Mabell n Pang72 in Armada on 2019 ….as well against Mabell in Serba ….

Hoho Buy What U Not Understand story Tellar tell Kidd story 🐍n 🐉 without facts n figures to Promote Serba … n together twisted on Serba subsidiaries with TinkosongLeader Kon ss leee … Ada Untung ke …..

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

Hoho Repost :

Meanwhile, Hong Leong Investment Bank (HLIB) Research estimates that the Kraken FPSO has a daily charter rate of approximately USD480k/day (or USD175m/year), which accounts for some 35% of the group's revenue contribution in FY2022.


Fpso Atlanta usd 305,000 a day ( first oil 31 dec 2024 )


"In July 2023, Yinson Production exercised its option to purchase FPSO Atlanta, which includes a 15-year firm plus a five-year option contract for the supply, operations and maintenance with a total contract value of up to US$1.981 billion (US$1=RM4. 71),” it said in a joint statement.

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

Hoho FPSO Kraken oil field is The Kraken fields (south, central and north), are heavy oil accumulations, and lie within UK block 9/2b in the Northern North Sea, some 350km ……

That’s why is costly … but only contributed 35% of the group's revenue contribution in FY2022.

But Yinson FPSO Anna Nery capacity 70,000 bpd ( Armada FPSO Kraken capacity 80,000 bpd ) First oil May 2023 … contributed ard 50 % of FPSO segment FY2024 Revenue… meaning the other 5 Operating FPSO is Aging liaw … old kidds …

Sslee

7,178 posts

Posted by Sslee > 5 days ago | Report Abuse

According to a February 2024 press release, EnQuest plans to reduce the lease rate for the Kraken Floating, Production, Storage and Offloading (FPSO) by about 70% starting April 1, 2025.

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

Hoho on Jaks :

Hoho need to repost again as earlier had replied to KonLee as most active Negative commentator in Jaks :

Jaks : catched the Bottom Fishing at RM 0.185 on April 2023 ( 👉 after Sslleee posted sold Jaks on April 2023 since 2021 ) ... Up to RM 0.225 in 2 months .. then invested at RM 0.19 on July 2023 .. Gap Up on 1/9/2023 to RM 0.245 …

👉Then Price is downtrend to the Lowest RM 0.12 ( Current Price RM 0.135 with NTA 0.60 )….

Ssleee asked me did I average down Jaks :

My reply :

1.) No .. but bought Privasia with cost below RM 0.10 .. n tried my learned TA on Cup n Handle affirmed with Information of a Gov Project , also Privasia rushing to List the 3 tranche PP … it did broke up to RM 0.14 …ssleee is active in Privasia forum also .

2.) posted earlier that wait for Jaks QR ended March 2024 to be released, as Vietnam has taken actions on 2 well known Businessmen ( One man n One Lady ) on Corruption… not from Power industry!

Just coincidentally :
Toyo Ventures Vietnam power project terminated >>> is due to Financing issue ( 2 x 1,060 MW) .
Friday, 05 Jul 2024

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

Jaks

1.) Vietnam Power Plant 1200MW EPCC RM 8.7 billion …Share of Profit n Dividends :


2020 : RM 3.8 million ( 1 Power Plant is COD on Nov 2020 )


👉 2021 : RM 140.7 million ( The 2nd Power Plant is COD on January 2021 , with BOT 25 years contract until 2046 ).


2022 : RM 156.2 million , Dividend RM 70.0 million


2023 : 1QR = RM 28.326 M , 2QR = RM 32.312 M , 3QR = RM 35.862 M , 4QR = RM 34.503 M plus Dividend RM 27.386 M

2023 : RM 131 million , Dividend RM 27.385 million


Total Share of Profit = RM 431.703 Million

Total Dividend = RM 97.386 Million

Total = RM 529.089 Million

> Share of Profit in QR ended March 2024 =
RM 32.384 million

>> Total = RM 561.463 million


> Share of Profit in QR ended June 2024 = Rm 21.33 million

Dividend = RM 14.21 million

👉 Total = RM 597 million.


> > Share of Profit in QR ended September 2024 = Rm 36.29 million


👉Grand Total 🟰 RM 633.3 million 👍

> Jaks 30 % share in Vietnam Power Plant Joint Venture invested ard RM 600 Million.
( RM 400 million is from the Profit of Construction contract of the Vietnam Power Plant, EPC2.)

Initially PayBack 8 to 9 years ..

Referring to the Grand Total , PayBack period is by 2024 .. ie : from 2021 to 2024 ~~ 4 years ..

👉From Vietnam Power Plant 1200 MW EPCC RM 8.7 Billion started on October 2016 ,
Payback period is 8 years.


按照购电协议,电力售价将随原料价格波动。意味着业务盈利贡献获得保证。Jaks管理层曾透露内部回酬IRR介于12%,PAYBACK PERIOD为8至9年


👉👉👉 Jaks Vietnam JV Power Plant 1200 MW , EPCC RM 8.7 billion is COD on January 2021 with recurring Income for 25 years 👍.

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

Hoho old kidds Buy What u Not Understand, u meant ss lee lost in Armada ke …

During Armada FPSO Kraken had submersible pumps troubles .. after the announcement, Armada price immediately is dropped ard 16 % … TinkosongLeader Kon ss leee immediately wrote to Armada why made such an Announcement causing the Price is drastically dropped… the reply is being hantam kaw kaw by Armada .🤣🤣🤣🤫

-
Posted by Sslee > 7 minutes ago | Report Abuse

According to a February 2024 press release, EnQuest plans to reduce the lease rate for the Kraken Floating, Production, Storage and Offloading (FPSO) by about 70% starting April 1, 2025.


EnQuest targets fresh drilling and new growth at Kraken after FPSO troubles
14 Feb 2024 — UK producer EnQuest has put its troubles behind it at the Kraken oilfied in the North Sea as it prepares for a return to infill drilling at the field.

Posted by JediMaster1 > 5 days ago | Report Abuse

Only the person so foolish like Miketikus aka John use trash stock Jaks compare with cash cow Yinson 😂😂😂

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

Hoho better than yr Delisted Lambo in October 2024 ..used many aka id to promote since 2020 without facts n figures, like old kidds in Serba …

Posted by JediMaster1 > 10 minutes ago | Report Abuse

不用在去吹你的那只垃圾Jaks 都說了誰要是买多一点就死多一点而且还会死到最後变为零😂😂😂

Posted by JediMaster1 > 5 days ago | Report Abuse

Don’t be so foolish no one will believe what ever you bad mounts to Yinson 😂

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

Hoho Repost :

Hoho Yinson working Capital is only Last for 7 months … need to Refinancing ke like sold FPSO Anna Nery 11.8 % equity :

Where as Jaks working Capital is always can Last for 12 months : Current Ratio 1.04


>>>

Yinson :

Price : RM 2.64
NTA : RM 1.77

EPS 27.58 sen
Trailing PE (Sector Median: 9.7) 9.5
Current Ratio 0.64
Debt-Equity (DE) Ratio 2.27
FCF Yield -10.58 %
Revenue QoQ -13.49 %
Revenue YoY -34.13%
Profit QoQ -1.48 %
Profit YoY -19.35 %


Jaks :

Price : RM 0.135
NTA : RM 0.60

EPS 0.71 sen
Trailing PE (Sector Median: 21.5) 18.2
Current Ratio 1.04
Debt-Equity (DE) Ratio 0.64
FCF Yield 0.81 %
Revenue QoQ 7.74 %
Revenue YoY 41.26%
Profit QoQ 167.57 %
Profit YoY 215.31 %

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

Hoho kesian le .. loss naked in delisted Lambo .. need to go to TR ke ..

Posted by jjohnchew > 3 minutes ago | Report Abuse

Hoho better than yr Delisted Lambo in October 2024 ..used many aka id to promote since 2020 without facts n figures, like old kidds in Serba …

Posted by JediMaster1 > 10 minutes ago | Report Abuse

不用在去吹你的那只垃圾Jaks 都說了誰要是买多一点就死多一点而且还会死到最後变为零😂😂😂

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

This article first appeared in The Edge Malaysia Weekly on July 1, 2024 - July 7, 2024.


Hoho this is interesting le , may refer to QR January 2024 on Loans n Borrowings :

Nonetheless, the profile of Yinson’s loans is worth highlighting. Of the RM16.3 billion in borrowings, RM9.83 billion have a maturity of between two and five years. Those with over five years’ maturity amount to RM3.84 billion.

👉 Hoho this is the critical risk hurdle le … with the interest Expenses le 😱🤫

Sslee

7,178 posts

Posted by Sslee > 5 days ago | Report Abuse

FPSO Agogo, Angola
Country Angola
First oil 2025 (expected)​
Client Azule Energy (50/50 JV of BP and Eni)​
Capacity
Oil: 120,000 bopd
Liquids: 180,000 blpd
Gas comp: 230 MMscf/d
Water inj.: 180,000 bwpd
Storage: 1,600,000 barrels (min)
Contract
Firm: 15 years (USD 4.6 billion)
Optional: 5 x 1-year (USD 0.7 billion)
Ownership 100%


FPSO Atlanta, Brazil
Country Brazil
First oil 2024 (expected)
Client Brava Energia
Capacity
Oil: 50,000 bopd
Water: 134,000 bwpd
Liquids: 144,000 blpd
Gas comp: 12.4 MMscf/d
Storage: 1,000,000 - 1,251,000 barrels
Contract
Firm: 15 years (USD 1.7 billion)
Options: 1 x 5-years (USD 0.4billion)
Ownership 100%

FPSO Maria Quitéria
Charterer / Client Petrobras
Field (Country) Jubarte Field, North Campos Basin (Brazil)
Storage capacity 1,000,000 barrels
Mooring Spread
Production capacity Oil: 100,000 BOPD
Liquid: 240,000 BLPD
Gas Comp: 177 MMSCFD
Water Inj: 330,000 BWPD
Contract commencement 2024
Contract duration
Firm 2024 - 2047 (22.5 years) (USD 5.3 billion)
Options -
Ownership 100% Yinson

FPSO Anna Nery (Brazil)
Charterer / Client Petrobras
Field (Country) Marlim in Campos Basin (Brazil)
Storage capacity 1,600,000 barrels
Mooring Spread
Production capacity Oil: 70,000 BOPD
Liquid: 250,000 BLPD
Gas Comp: 142 MMSCFD
Water Inj: 240,000 BWPD
Contract commencement 2023
Contract duration
Firm 25 years (2023 - 2048) (USD 5.7 billion)
Ownership 63.2% Yinson, Sumitomo 25% and "k" line 11.8%

The above 4 FPS0 need big borrowing for EPCIC and once delivered and hit first oil the clint need to pay Yinson the contracted lease rate.

You can work out what will be the above 4 FPSO yearly revenue.

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

This article first appeared in The Edge Malaysia Weekly on July 1, 2024 - July 7, 2024.


Hoho this is interesting le , may refer to QR January 2024 on Loans n Borrowings :

Nonetheless, the profile of Yinson’s loans is worth highlighting. Of the RM16.3 billion in borrowings, RM9.83 billion have a maturity of between two and five years. Those with over five years’ maturity amount to RM3.84 billion.

👉 Hoho this is the critical risk hurdle le … with the interest Expenses le 😱🤫

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

Hoho FY2024 Interest expenses on Loans n Borrowing = RM 1,118 million.… FY2025 is expected to be higher as

Total Loans n Borrowings is increased from QR January 2024 RM 16.3 billion to QR October 2024 RM 19.37 billion!😱🤫

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

👉The hidden risks as posted earlier:

These 4 Latest FPSO illustrated Total Loans n Borrowings =.RM 12.4 billion + 3.22 billion =. RM 15.62 billions

QR October 2024 Total Loans n Borrowings RM 19.37 billion- RM 15.62 billion = RM 3.75 billion.

👉👉 Question: Where is this Loans n Borrowings RM 3.75 billion is b/f From ????😱😱😱🤔


Note : 4 Latest FPSO > Anna Nery , Atlanta, Maria and Agogo .

And :

👉👉👉 FPSO Anna Nery is contributing ard 50 % ( First Oil on May 2023 ) on FPSO segment Revenue where as the other 5 Operating FPSO are contributing 50 % ( ie : illustration > each one contributing 10 % only ) …. is started Aging liaw …

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

JAKS RESOURCES(Jaks)在2011年争取的越南海阳燃煤电厂项目在经过了6年的风雨终于开工建设了。由于项目总投资达18.685亿美元,JAKS无法找到任何银行资助该项目,所以电厂的建设推迟了好几次,期间更换了2个中国伙伴。直到于2015年7月Jaks与中国电力工程顾问集团有限公司(CPECC)达至协议。Jaks让出项目控制权从以往60:40改为30:70的股权合资开发此工程。CPECC负责融资及全部工程建设。CPECC在进行发电和输变电厂的工程非常有经验。参与了约90%的中国煤电工程。共完成了49,000兆瓦燃煤厂工程。

为确保整个项目能够圆满完成,CPECC承担全部责任完成电厂建设,包括如需要额外的资本。 JAKS在建设期间将获得项目的4.5455亿美元工程。而此工程也将由CPECC承包。实质上,JAKS肯定会在施工期间赚取大约4亿令吉。此利润将流回合资公司充当JAKS的股权资金。换句话说,JAKS只需要拨出2亿令吉来拥有电厂30%的股份。完成发电厂项目后,JAKS在3年内有权向CPECC以成本购买另外10%而拥有合资公司的40%股权。

CEO洪南坡在2011年下了一个胆大包天的赌注,在世界面对金融风暴时刻,啃下一个陌生领域而且需要庞大资金的巨大BOT模式燃煤电厂工程。当时越南高速经济成长造成严重电力短缺,以至越南政府颁发了多个发电厂工程。因为资金需求庞大,大型的燃煤电厂工程都以BOT模式颁发了给外资企业。当时便有3个类似燃煤电厂供外企竞标。Mong Duong燃煤电厂是颁发给美国的AES Corporation (51%), Posco Energy (30%) and China Investment Corporation (19%), 越南永新燃煤电厂一期BOT项目是由中国南方电网有限责任公司(55%)、中国电力国际有限公司(40%)和越南煤炭集团电力有限公司(5%)共同投资。而越南海阳燃煤电厂项目则颁给Jaks。CEO洪南坡被访问时表示去越南本意是寻找内行的水务工程,可机缘巧合发现越南严重缺电,所以竞标陌生的燃煤电厂工程。

可看到得标者个个都是几百亿市值,财力雄厚,经验丰富的跨国集团。何以势单力薄的Jaks也会得标 ?也许当时正处金融风暴而且项目多,竞标者少。

Jaks於2011年动工清理场地后便处于静态,前后换了2 个中国伙伴都因为无法得到任何银行资助而无法动工。2014年5月中越南海纠纷引发了一场“反华暴动”,中国冻结了对许多越南工程。Jaks已耗资2亿令吉。眼看将要泡汤。曾一度与TENAGA商讨合作,后来中国越南领袖互相拜访重新友好。中国大减钢铁产能而冻结燃煤产量导致煤电厂工程喊停。此举导致煤电公司出走寻找机会。又逢中国发起的一带一路计划给合格的项目得以融资。同时,越南政府也修改了政策以便项目的条例符合中资银行的严格融资条件。机缘巧合,天时地利,海阳燃煤电厂项目办妥了。

按照购电协议,电力售价将随原料价格波动。意味着业务盈利贡献获得保证。Jaks管理层曾透露内部回酬IRR介于12%,PAYBACK PERIOD为8至9年。如果发电理想,可获1.5亿美元的常年收入。

燃煤电厂于2016年3月28日动土。机组建设工期为42+6,2016年10月1日开始计时,按照里程碑计划2020年2月28日#1机组完成临时移交,2#机组顺延6个月。工程正如火如荼的进行中。

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

Hoho Kon ss lee .. that’s why Jaks JV Vietnam Power Plant equity 25 % .. 75 % Loans is repay in 10 years .. instead along with BOT contracts 25 years … u know how much savings on the accumulated Interest expenses….

Sslee

7,178 posts

Posted by Sslee > 5 days ago | Report Abuse

Yearly revenue from
FPSO Agogo USD million 4600/15 = 306.67 (2026 onward)
FPSO Atlanta USD million 1700/15 = 113.33
FPSO Maria Quitéria USD million 5300/22.5= 235.56
FPSO Anna Nery USD 5700/25 = 228.00
Total USD 883.56 million

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

Hoho old kidds Serba story teller Buy what U Not Understand… I am not like u twisting telling kidds story lo …

Not only on Jaks … as posted earlier before Jaks , I had debated against Kon ss leee on Capital A … now waiting to strike Jackpot “ out from PN17 “ on my balance Free tickets…

Kon ss leee had been a Negative commentator in Capital A more than 2 years …

jjohnchew

3,902 posts

Posted by jjohnchew > 5 days ago | Report Abuse

Hoho Kon ss leee u recently said Capital A is OK liaw after 2 years … sure ke my Balance Free tickets will strike Jackpot ke “ out from PN17 “ …

Posted by JediMaster1 > 5 days ago | Report Abuse

Junk Stock Jaks is just a tiny small ant 🐜 in our stock market and the management team is so worst that i ever seen ! this kind trash company will disappear slowly in the market 😆