Followers
77
Following
5
Blog Posts
0
Threads
20,514
Blogs
Threads
Portfolio
Follower
Following
2022-12-07 15:01 | Report Abuse
Under national security concern, many country is expanding semiconductor capacity, integrated and localized supply chain to meet each demand rather than depending on import and abort centralize on Taiwan/korean.
Tin demand will increasing to meet global decentralize and expanding semiconductor
2022-12-07 14:28 | Report Abuse
Special dividend 12sen should be announced by these month and payment next month Jan 2023, likely before CNY :D)
2022-12-06 22:30 | Report Abuse
China tin price is recovering in tandem with reopening economy.
2022-12-06 10:42 | Report Abuse
bought back MSC at 1.61-1.64
2022-12-05 09:11 | Report Abuse
locked profit, sold jhm at 80.5sen
2022-12-02 16:44 | Report Abuse
added balance capital to AYS at 41.5sen
2022-12-02 15:17 | Report Abuse
Accumualtion completed
2022-12-02 14:36 | Report Abuse
added more masteel at 38.5sen
2022-12-02 11:24 | Report Abuse
bought masteel at 39sen
2022-11-30 16:51 | Report Abuse
sold back ytlp at 76sen, locked profit
2022-11-30 15:59 | Report Abuse
sold back at 24.5, still challenging time to cope cost
2022-11-30 15:57 | Report Abuse
Accumulated more lionind, all at 39
2022-11-30 14:51 | Report Abuse
bought lionind at 39sen
2022-11-29 18:24 | Report Abuse
Petron corp and Petron M alreadg give warnning result ahead. Many investors if take advice should have sell earlier, but too bad many seem trap till now due to continue unverified calculations to show how fantastic uocoming reeult, how different compared to Petronm, how smart hengyuan hedging strategy will be..... misleadingly other to witheld waiting for so call big reward. Too bad, too late now
2022-11-29 18:05 | Report Abuse
Pity too to those subcriber, hope they claim back their subscription fees ya
2022-11-29 17:59 | Report Abuse
Fallen in love to self calculation, under self denial state despite many warning sign ahead. Stubborn and insistance to keep continuing post unverified calculations, trapping more and more innocent people to support. Pity
2022-11-29 17:54 | Report Abuse
Those in call warrant stand total wipe out. Pity, many refuse to take warnings ahead
2022-11-29 17:52 | Report Abuse
Too bad many get trap by sweet talk by many so called sifu
2022-11-29 17:52 | Report Abuse
Warning 1. Petron corp poor earning
Warnings 2 - Petron Malaysia poor earning
2022-11-29 17:51 | Report Abuse
Alrdy give warning ahead, but too bad, many under dennial state
2022-11-29 17:50 | Report Abuse
Pity, big loss RM 2.13
2022-11-29 11:01 | Report Abuse
added more ytlp at 71sen
2022-11-29 10:29 | Report Abuse
bought paramount at 74-75sen
2022-11-29 10:25 | Report Abuse
bought ytLp at 70.5sen
2022-11-28 15:14 | Report Abuse
China central policy is to practise loose covid zero policy, but, local gov remain rigid such as continue demand 24hr PCR test instead of central gov guidelines demand only 72 hr PCR test.
The discrepancy practice is local gov continue adhere KPI introduced by earlier Central gov in which if outbreak, local party head and local head gov need to bear full responsibility. The KPI set risk their position getting fired or influence their future politics prospect.
China central gov need to amend their KPI on covid zero policy down to in line to latest central gov loosen guidelines. Its matter of time to streamlined policy from central throughout local government
2022-11-27 21:33 | Report Abuse
YTL Data Centers is the digital infrastructure arm of YTL Power International Berhad, which is headquartered in Malaysia and listed on Bursa Malaysia.
Supported by a diverse network of experts with both global and local expertise, we build data centres designed to optimise energy efficiency, scalability and reliability.
To enable the sustainable growth of today’s data-driven world, we have a goal to power our data centres across the South East Asia region with 100% clean and renewable energy.
This starts with our bold vision to build a Green Data Centre Park in Johor, Malaysia, which will be powered by up to 500MW of renewable energy through solar farms planted within the site.
YTL’s Johor Data Center 1 is located in the Iskandar region in Johor, Malaysia. It is a 530,000 sqft development, power by 72MW solar capacity. The first data center is 3-storey building consists of 2 wings of Data Hall suites and M&E rooms. It has 8 Data Hall suites spread over 2 wings per floor (total of 24 Data Hall suites). The Data hall is use for provision of onsite office space, storage and parking facilitie.
YTL data center also partner GDS Holdings Limited co-develop 168MW of data center capacity, across 8 individual data center facilities, at the upcoming YTL Green Data Center Park in Johor, Malaysia. The first phase of the co-development will enter service in 2024.
The 500MW solar power generate aside use to supply green energy to power up initiate 72MW + 168MW Data center, it also use 100MW to export to Singapore under 2 year pilot green power supply agreement with Singapore
2022-11-27 21:13 | Report Abuse
YTLP, wholly own subsidiary, YTL development.uk, is developing multibillion Brabazon Park in UK. will be the largest new urban park in the south west for over 50 years.
The design of the Park takes inspiration from aviation engineering, aiming to capture the historical, cultural and ecological uniqueness of the former airfield
https://ytldevelopments.co.uk/latest-news/plans-approved-for-brabazon-park
2022-11-27 21:02 | Report Abuse
Singapore plans to import up to 4GW of low-carbon electricity by year 2035F or about 30 per cent of its total supply.
YTL Power Seraya in Singapore has been selected for a two-year trial to import 100 megawatts (MW) of electricity from Peninsular Malaysia. YTL Power acquired 664 hectares (ha) of oil palm estates in Kulai, Johor from Boustead Plantations to develop the land into a large scale solar power plant with a generation capacity of up to 500MW. The first 100MW generate from these solar farm will be ready by end 2023 and start trial to export these low carbon electricity to Singapore by early 2024.
2022-11-27 20:53 | Report Abuse
YTL JV with Strides Mobility, together with Airetec and Yes Energy formed a consortium that won a tender from the Land Transport Authority (LTA) to install, operate and maintain electric vehicle (EV) chargers charging points at Housing & Development Board (HDB) carparks in the Central and East regions of Singapore
https://stridesmobility.sg/wp-content/uploads/2022/11/Media-Release-Strides-Mobility-YTL-PowerSeraya-win-tenderto-build-public-EV-charging-pointsform-ChargEco-to-accelerate-Singapores-decarbonisation.pdf
2022-11-26 22:44 | Report Abuse
Wessex water charge rate
From April 2022 our charges increased by around 4.5% compared to last year, for a customer receiving both water and sewerage services. Charges applicable from 1 April every year are published by 1 February.
We are now in the process of preparing our charges which will apply to bills from 1 April 2023. These charges will be confirmed on our website by 1 February 2023. Unfortunately, our prices will be increasing again largely due to high inflation.
2022-11-24 15:05 | Report Abuse
sold off balance armanda at 44sen
Stock: [MAYBULK]: MAYBULK BERHAD
2022-12-07 15:29 | Report Abuse
bought maybulk at 42.5sen