...CPSB, AIZO has subsequently been awarded the 9.99Mwac project directly by the EC in 2018. This LSSPV is CPSB’s first foray into the power sector while it continues to identify other business opportunities in renewable energy.
Sudah ada portfolio, orang kuat Sarawak lagi, spelled out dalam annual report lagi. ALL IN!!! Buy buy buy 🤑🤑🤑🤑
This counter is traded all the way at 13 cts since this morning, there must be some good news ahead. Keep on buying now, waiting for better news to come soon. hahaha.
BESS programme led by the Ministry of Energy Transition and Water Transformation (Petra), the bidding process will be conducted in two stages, starting with a request for qualification (RFQ) where interested bidders may submit their qualifications to the Energy Commission (EC). Only qualified bidders can proceed to submit their proposals via a request for proposal (RFP).
As for package four, shortlisted outfits were rumored to include Aizo Group Bhd's (KL:AIZO) 63%-owned Wawasan Demi Sdn Bhd with a 99.99MWac project in Perak; Gadang Holdings Bhd's (KL:GADANG) 70%-owned Nusantara Suriamas Sdn Bhd, with 99.99MWac project in Selangor; Conextone Energy Sdn Bhd's 90MWac farm in Melaka; and a venture linked to Edra Power Holdings Sdn Bhd and Selangor state-linked Worldwide Holdings Bhd, with a 300MWac project in Selangor.
As for package four, shortlisted outfits were rumored to include Aizo Group Bhd's (KL:AIZO) 63%-owned Wawasan Demi Sdn Bhd with a 99.99MWac project in Perak. The fourth package is for floating solar projects with a total quota of 500MW. The tender requires minimum Bumiputera or local Malaysian equity requirements to increase local participation in the RE industry.
This book is the result of the author's many years of experience and observation throughout his 26 years in the stockbroking industry. It was written for general public to learn to invest based on facts and not on fantasies or hearsay....
Salahuddin Ahmad
148 posts
Posted by Salahuddin Ahmad > 1 day ago | Report Abuse
...CPSB, AIZO has subsequently been awarded the 9.99Mwac project directly by the EC in 2018. This LSSPV is CPSB’s first foray into the power sector while it continues to identify other business opportunities in renewable energy.
Sudah ada portfolio, orang kuat Sarawak lagi, spelled out dalam annual report lagi. ALL IN!!! Buy buy buy 🤑🤑🤑🤑