KLSE (MYR): SENDAI (5205)
You're accessing 15 mins delay data. Turn on live stream now to enjoy real-time data!
Last Price
0.59
Today's Change
0.00 (0.00%)
Day's Change
0.00 - 0.00
Trading Volume
0
Exchange: Bursa Malaysia Bursa Malaysia
Country Code: MY MY
Currency: MYR MYR
Sector: CONSTRUCTION CONSTRUCTION
Subsector: CONSTRUCTION CONSTRUCTION
Index Group: CONSTRUCTION CONSTRUCTION
Category: ORDINARY SHARE ORDINARY SHARE
Syariah Flag: Yes Yes
Short Sell Flag: Yes Yes
IDSS Flag: No No
Eversendai Corporation Berhad (ECB), formerly Eversendai Corporation Sdn. Bhd is an investment holding company. The Company's principal activity is the provision of management services. ECB's subsidiaries include EV Abu Dhabi, EV Dubai, EV India, EV Qatar, EVSC, EV Saudi, EV Sharjah, EV Singapore and SEVM. The Company owns 49% interest in EV Abu Dhabi, EV Dubai, EV Qatar and EVSC. ECB provides some technical services, such as Structural design, Detailing works, Unfolding drawings and Value engineering services. It provides complete design services ranging from conceptual stage design to connection design for a range of structures using appropriate software. ECB also provides structural detailing works services and services in unfolding drawings with 3-D curvatures for complex structures. The Company has completed over 100 projects, including projects in 10 countries, such as Malaysia, Thailand, Philippines, Indonesia, Hong Kong, Oman, Saudi Arabia, Bahrain, Qatar and UAE.
@Risktaker79. Who do you support, Trump or Harris? 🤓 I think Sendai will go up if Trump wins
1 month ago
Closing Day 3 at the World Travel Market (WTM) in London, we celebrate not only promising connections but a full event of trailblazing ideas coming together to reshape the future of tourism.
Trojena is proud to end our 3rd year of participation at @WTMLDN on a high note, showcasing the tremendous development milestones we achieved in 2024 and ultimately showing how Trojena will redefine luxury mountain tourism.
Trojena thanks those that made this year's event possible - we're already looking forward to the next one!
1 month ago
Come and visit #Trojena at Cityscape Global and see how the vision for future living in the mountains of NEOM is taking shape. Cityscape Global in Riyadh, Nov 11-14. Join us at the world’s largest real#CityscapeGlobal2024
#NEOM
1 month ago
After 400 days of war, Qatar says to halt Gaza mediation until Israel, Hamas show ‘seriousness’. Meaning the war has cooled down
https://www.malaymail.com/news/world/2024/11/10/after-400-days-of-warqatar-says-to-halt-gaza-mediation-until-israel-hamas-show-seriousness/156347
1 month ago
Do the next quarter look any better,a doubt.but if it go for 2 consecutives quarter of strong profit let say 25-40 million net profit,there will be something intresting.tp rm 1.
Looking for early december then talk again.
24/11/24 11.20am
4 weeks ago
Kuwait University Stadium
Track & Field Stadium in Kuwait
Eversendai Construction W.L.L, Kuwait was awarded the Track & Field Stadium Steelwork Package of Building-G in Kuwait University Project.
The total Tonnage of Steelwork in this Project is 8451MT. This project is located in Sabah Al Salem University City in Kuwait.
The scope of Eversendai was to provide Connection Design, Shop Drawings, BIM Implementation & Coordination, Erection Engineering Study & Stage Analysis, 3D Modelling, Workshop Fabrication Drawings, Supply, Fabrication, Composite Floor Decking, and Erection of Structural Steel Works. All the Design, Engineering & Detailing scope of works was completely taken care of In-House Engineering Department of Eversendai Dubai Office and successfully completed in line within the project schedules.
4 weeks ago
Review of Group with Comparison in Current Quarter to immediately Preceding Quarter
The Group reported revenue and Profit before tax of RM235.2 million and RM8.9 million respectively in
the current quarter as compared to revenue of RM275.5 million and Profit before tax of RM4.8 million
in the immediately preceding Quarter. The decline in revenue is attributable to the final stages of
completion of major projects in the Middle East while marginal increase in Profit before tax is mainly
attributable to forex gains. Revenues from newly commenced projects would significantly contribute to
Group revenue in coming Quarters.
24. Prospects of the Group
With the Group’s current outstanding order book of RM5.7 billion and continuous reorganisation of resources with a strong focus on optimisation of costs and improving efficiency in its operations, the Group believes that the path of recovery is in motion.
With the settlement of the Ijarah loan for Vahana Aryan and the partial settlement of the Term loan with proceeds from disposal of a non-core land asset in Malaysia, the Group’s total borrowings have reduced by 42.8% from RM1,051.7 million to RM601.2 million during the current period. The Group is making further efforts to restructure its borrowings and strengthen its liquidity position.
The Trojena Ski Village project secured from Neom in Kingdom of Saudi Arabia is progressing well. The Design & Engineering works are on-going and the first steel structure was erected at the project site on 20 June 2024, meeting the first contractual milestone. The newly awarded Projects in the Middle East and India have commenced and are progressing. With the current outstanding order book, the Group foresees optimal utilisation of all its fabrication facilities in the coming quarters.
The Group is optimistic of its future prospects to achieve improvised financial performance.
3 weeks ago
Compared to previous quarter net profit up from 200k to 2 million. How would market response tomorrow?
3 weeks ago
I am so amused with poop fly comment with nickname as sounds like a sore ….. 🤣. Have the guts ….😁😁😁
2 weeks ago
It’s official!
Saudi Arabia is hosting the FIFA World Cup 2034™ and #NEOM is proud to be one of the five host cities.
The unique #NEOMStadium will offer an experience like no other.
#WelcomeToSaudi34 #Saudi34 Saudi Arabia FIFA World Cup 2034
The #NEOMStadium will be the most unique stadium in the world, over 350m above ground and seamlessly integrated into THE LINE.
It will feature cutting-edge innovations to enhance viewing and participation experiences.
#WelcomeToSaudi34 #Saudi34 #NEOM Saudi Arabia FIFA World Cup 2034
1 week ago
Technically, after sliding 46.5% from 52W high at RM0.785 (May 13) to a low of RM0.42 (Aug 29), SENDAI (CP:RM0.56, BVPS: RM0.38) has been traded in a range bound mode within RM0.46-0.625 zones. A confirmed breakout above RM0.625 (Dec 4) would enhance further upside targeting RM0.645 (61.8% FR) and RM0.70 (76.4% FR). Key retracement supports are pegged at RM0.535 (100D MA) and RM0.50 (200D MA) levels.
Source: Hong Leong Investment Bank Research - 16 Dec 2024
1 week ago
Eversendai Construction Pvt Ltd, a globally recognized leader in structural steel design, detailing, and fabrication, is looking for talented engineers to join its dynamic team in Chennai and Trichy. We specialize in delivering complex infrastructure and high-rise projects worldwide, offering a collaborative and innovative work environment that encourages professional growth.
3 days ago
Hotstuff
TP60c congrat those who bought 0.47 below!
1 month ago