Hi Guys,
At long last NFCP BULL RUN HAS COMMENCED IN A DAY OF SELL DOWN DUE TO WUHAS VIRUS
MANY COUNTERS DOWN BUT THESE 3 ARE UP
1) BINACOM UP
2) CMSB UP
3) REDTONE UP
4) NETX CLOSED UNCHANGED
5) OPCOM SLIGHT DIP
OVRALL VERY STRONG CLOSING FOR ALL 5 FUTURE CHAMPIONS OF NFCP BULL RUN THEME
Let's see the announcements:
Monday, 03 Feb 2020 05:09 PM MYT
PUTRAJAYA, Feb 3 — Construction of new communication towers at 152 locations in 93 mukim throughout the country to provide 3G and 4G cellular services under the National Fiberisation Connectivity Plan (NFCP) will commence in the middle of February, said Communications and Multimedia Minister Gobind Singh Deo.
He said the project is the NFCP 1 initiative undertaken by the Malaysian Communications and Multimedia Commission (MCMC) to improve digital infrastructure in areas that have no or limited access to 3G and 4G coverage.
NFCP 2, meanwhile, involve plans to build new communication towers in at least 500 locations in 210 mukims throughout the country to provide 3G and 4G coverage, he said.
“This project (NFCP 2) is expected to begin in the third quarter of this year,” he said at the Minister’s Message event at the Communications and Multimedia Ministry here today.
NFCP 1 (first phase of the NFCP) involves eight states namely Johor, Kedah, Kelantan, Negri Sembilan, Pahang, Perak, Terengganu and Sabah while the second phase (NFCP 2) includes two other states — Melaka and Sarawak.
Gobind said MCMC was also working with the Ministry of International Trade and Industry (Miti) and the Malaysian Investment Development Authority (Mida) to provide high-speed broadband coverage with speeds up to 1Gbps in 37 selected industrial areas.
This project is part of the NFCP and INDUSTRY4WRD initiative that is expected to further spur digital economic activities in these areas, he said.
Launched by Deputy Prime Minister Datuk Seri Dr Wan Azizah Wan Ismail on Sept 19, 2019, the NFCP is a five-year plan (2019-2023) aimed at providing digital connectivity that is sustainable, comprehensive, of high quality and affordable for the wellbeing of the rakyat (people) and progress of the nation besides preparing Malaysia to face the Fourth Industrial Revolution (IR 4.0)
“Overall, the cost of implementation of the NFCP is estimated at RM21.6 billion for the five-year period and is expected to generate 20,000 job opportunities for the rakyat,” said Gobind. — Bernama
VERY GOOD NEWS INDEED!
AT LAST THE BULL RUN IN NFCP FIBERISATION HAS STATED
TODAY IN A HORRIBLE SELL DOWN DUE TO CORONAVIRUS
THESE STOCKS WENT UP
1) BINACOM UP
2) CMSB UP(SACOFA BUILDS TELCO TOWERS IN SARAWAK)
3) REDTONE UP (EXPERT IN RAN)
4) NETX CLOSED UNCHANGED
5) OPCOM CLOSED WITH SLIGHT LOSS
OVERALL THESE NFCP FIBERISATION STOCKS WILL FROM NOW JOIN IN THE ONCE IN A LIFE TIME BULL RUN OF THE RM50.3 BILLIONS FIBERISATION THRUST FOR 5 YEARS OF 2019 TO 2023
VERY POWERRFUL EXCITING TIMES COMING
GET ON BOARD NOW WHILE PRICES STILL CHEAP
BEST REGARDS
Calvin Tan Research
Singapore
Please buy or sell after doing your own due diligence
Created by calvintaneng | Jul 15, 2024
Created by calvintaneng | Jul 12, 2024
Created by calvintaneng | Jul 10, 2024
WEIDA just received LoA for nfcp1 for construction of towers in Sabah. What did netx get? Zero. Nada. Nothing.
Unchanged? Of course not. No announcement by netx of getting nfcp1.
No hope. No news. But guess what, calvintaneng big cheerleader promoting something that netx is not even promoting.
Too bad.
2020-02-04 20:38
Can i Advice you?
Next will not get anything from NCFP - is fact
Only Spillovers,,
Thanks Peter
2020-02-04 20:41
How come Philip is so bodoh?
Netx is a Network infrar specialist
As such lesser skilled jobs go to manual man powered entities
Netx will be upgrading Telekom and other Telcos Network Bandwitdh optimisation
2020-02-04 20:59
My son doctor David Tan told me the highest skilled job paying the highest salary is Senior Heart Surgeon
Not female nursing aide
2020-02-04 21:01
calvintaneng
Engine Vrroooooom!!!
2020-02-04 20:30